Highlights: The 16,500-metre phase 2 drill program is currently underway at the high-grade Polymetallic B26 Deposit. Drillhole 1274-24-338 was designed to test the extension of the high-grade lens identified in hole 1274-16-236, which intercepted 5.08% Cu Eq over 7.1 metres. This hole was extended from a planned depth of 1,250 to 1,422 metres based
[...]