Argentex Defines 23.6 Million Ounces Ag Eq. @ 132.4 g/t Ag Eq. Indicated Mineral Resource Estimate at Pinguino Silver-Gold Project

31.01.2013  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 01/31/13 -- Argentex Mining Corporation ("Argentex" or the "Company") (TSX VENTURE: ATX)(OTCQB: AGXMF) is pleased to announce the preliminary results of a National Instrument ("NI") 43-101 compliant Mineral Resource Estimate (the Report) by Mine Development Associates ("MDA") of Reno, Nevada for the Company's 100%-owned Pinguino Silver-Gold Project, located in Santa Cruz province, Argentina.


"These results confirm management's belief that the Pinguino Project contains a significant high-grade silver and gold resource in veins that outcrop at surface," commented Mike Brown, President and CEO of Argentex. "With close to 84% of the resource falling into the Indicated category, we are accelerating internal engineering studies and completing initial metallurgical studies. Our decision to prepare a new Preliminary Economic Assessment based on this Report will depend upon the outcomes of these studies. Our immediate goal is to determine Pinguino's economic potential as an open pit mining operation. We are confident that we can continue to add high grade near surface mineral resources as we continue to drill the known vein systems, although this is not an immediate priority."


Highlights include:



-- 23.6 million ounces of silver equivalent (84% of the total reported
resource) in the Indicated category at a grade of 102.8g/t Ag and
0.59g/t Au
-- 4.7 million ounces silver equivalent in the Inferred category at a grade
of 58.0g/t Ag and 0.74g/t Au
-- Only eight of the 36 veins drill tested to date have been used to
populate the resource model
-- 60+ veins remain to be fully tested in vein structures that remain open
in all directions
-- Mineralisation outcrops at surface, allowing the prospect for an open
pit mine operation
-- Low elevation and excellent local infrastructure, including extensive
road network, sea ports, and new power grid currently under construction
proximal to site
-- Polymetallic mineralisation provides potential for additional economic
upside

--------------------------------------------------------------------------
Indicated Grade (g/t) Ounces
--------------------------------------------------------------------------
Tonnes Ag Au AgEq. Ag Au AgEq.
--------------------------------------------------------------------------
5,564,000 102.8 0.59 132.4 18,385,000 106,000 23,685,000
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Inferred Grade (g/t) Ounces
--------------------------------------------------------------------------
Tonnes Ag Au AgEq. Ag Au AgEq.
--------------------------------------------------------------------------
1,531,000 58.0 0.74 95.1 2,854,000 36,400 4,674,000
--------------------------------------------------------------------------


Ag equivalent grade presented in news release is calculated as Ag grade + (Au grade (i) 50) (Rounding may cause apparent discrepancies).


The varying cutoffs used in the resource model are given below:



--------------------------------------------------------------------------
Cutoff Indicated
AgEq Tonnes AgEq Ag Au Zn Pb
(g/t) (000's) (g/t) (g/t) (g/t) (%) (%)
--------------------------------------------------------------------------
Reported 5,564 132.4 102.8 0.59 0.85 0.56
--------------------------------------------------------------------------
20.0 10,463 85.9 65.7 0.40 0.85 0.45
40.0 6,201 125.1 96.6 0.57 1.03 0.57
60.0 4,042 165.7 129.7 0.72 1.11 0.65
80.0 2,884 204.5 162.4 0.84 1.12 0.72
100.0 2,183 241.5 194.5 0.94 1.07 0.75
150.0 1,239 333.4 275.4 1.16 0.87 0.81
200.0 804 420.4 354.5 1.32 0.69 0.83
--------------------------------------------------------------------------
Cutoff Inferred
Tonnes AgEq Ag Au Zn Pb
AgEq(g/t) (000's) (g/t) (g/t) (g/t) (%) (%)
--------------------------------------------------------------------------
Reported 1,531 95.1 58.0 0.74 0.63 0.34
--------------------------------------------------------------------------
20.0 4,701 54.7 35.3 0.390 0.75 0.28
40.0 2,229 84.5 52.8 0.633 1.03 0.37
60.0 1,253 112.2 68.3 0.879 1.11 0.43
80.0 788 137.7 82.0 1.114 1.20 0.50
100.0 514 163.8 94.8 1.380 1.16 0.51
150.0 226 217.5 126.2 1.823 1.35 0.59
200.0 98 276.6 176.7 1.998 1.37 0.61
--------------------------------------------------------------------------

------------------------------------------------------------------------
Cutoff Indicated
AgEq Tonnes Ag Au Zn Pb
(g/t) (000's) (000's oz) (000's oz) (000's lbs) (000's lbs)
------------------------------------------------------------------------
Reported 5,564 18,385 106.0 104,711 69,208
------------------------------------------------------------------------
20.0 10,463 22,097 135.6 196,690 103,886
40.0 6,201 19,253 113.6 140,242 78,495
60.0 4,042 16,854 93.7 98,488 57,995
80.0 2,884 15,065 78.0 71,258 45,564
100.0 2,183 13,649 66.1 51,651 36,136
150.0 1,239 10,969 46.2 23,726 22,038
200.0 804 9,163 34.1 12,254 14,698
------------------------------------------------------------------------
Cutoff Inferred
Tonnes Ag Au Zn Pb
AgEq(g/t) (000's) (000's oz) (000's oz) (000's lbs) (000's lbs)
------------------------------------------------------------------------
Reported 1,531 2,854 36.4 21,122 11,554
------------------------------------------------------------------------
20.0 4,701 5,328 58.9 77,312 29,310
40.0 2,229 3,780 45.4 50,392 18,225
60.0 1,253 2,750 35.4 30,689 11,964
80.0 788 2,079 28.2 20,819 8,696
100.0 514 1,566 22.8 13,152 5,727
150.0 226 917 13.2 6,710 2,916
200.0 98 556 6.3 2,958 1,312
------------------------------------------------------------------------

1. Ag equivalent grade = Ag grade + (Au grade (i) 50) (Rounding may cause
apparent discrepancies).
2. Mineral Resources are not Mineral Reserves and do not have demonstrated
economic viability. There is no certainty that all or any part of the
estimated Mineral Resources will be converted into Mineral Reserves.
All Mineral Resources have been classified in accordance with the
Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM
Standards on Mineral Resources and Reserves, Definitions and Guidelines
prepared by the Standards Committee on Reserve Definitions and adopted
by the CIM Council on December 11, 2005 and updated on November 27,
2010.
3. Mineral Resources tonnage and contained-metal have been rounded to the
nearest thousand and numbers might not add due to rounding.
4. Two cutoffs are given for reporting the resources: 40g/t AgEq for
elevations above 270m, and 100g/t AgEq for elevations below 270m
elevation. Average elevation at Pinguino is 400 metres above sea-level.
5. MDA reports resources at cutoffs that are reasonable for deposits of
this nature given anticipated mining methods and plant processing costs,
while also considering economic conditions.
6. Grades presented are in situ and have been diluted to 3m by 6m by 4m
(high) blocks.


Pinguino Exploration Historical Review


Argentex began exploration activities at Pinguino in late 2004. Between 2004 and 2009, the Company completed five phases of exploration, which included 269 diamond drill holes (30,037 meters), 311 trenches, geological mapping, geochemical sampling and geophysical surveys. The exploration data provided sufficient density to interpret the basic structural geology from which a resource estimate was made on nine of the known veins. That phase of work was reported in the National Instrument ("NI") 43-101 compliant Report "Resource Estimate for the Pinguino Silver, Zinc, Indium, Lead, Gold Occurrence", dated October 28, 2009 (News Release, October 29, 2009).


Argentex subsequently evaluated the data used in the 2009 resource estimate and undertook scoping-level studies of the mining and processing potential of the property. These evaluations led to the NI 43-101 compliant "Pinguino Property Preliminary Economic Assessment 2011", dated August 5, 2011, (results reported in News Release, March 22, 2011).


From 2010 to 2012, Argentex completed three additional exploration programs (Phase VI through to VIII), which included 153 diamond drill holes (16,838 metres), 255 reverse circulation drill holes ("RC") (19,610 metres) and 38,300 meters of trenching, all of which improved the geological interpretation of the vein structures. The Company also initiated metallurgical studies (ALS Ammtec and G&T Metallurgical Services Ltd.) with the goal of identifying preliminary recoveries of the oxide, transition and sulphide zones, and to further assist in understanding the Pinguino vein system. The phase VI - VIII exploration programs were focused on defining and expanding resources in the oxide and transition zones of known vein systems, and to test identified vein structures having the potential to build resources.


The resource model is based on a database of 677 drill holes (66,455 metres), and 744 surface trenches (42,019 metres), all completed between 2004 and 2012 in exploration phases I through VIII. Of the 36 veins drill tested to date only 8 of the most intensely explored veins (Marta Este, Marta Norte, Marta Centro, Marta Noroeste, Marta Sur, Ivonne, Marta Oeste and Tranquilo) were selected to be included in the resource model. These eight veins were focused on in recent drill programs to define near surface high grade silver and gold oxide material. This is a first step towards defining an open pit minable resource as part of a future Preliminary Economic Assessment (PEA).


The Company believes there is significant scope for increasing the mineral resource reported at Pinguino. Six other veins were evaluated for potential resources but will require additional drilling before they qualify. Total metal silver-equivalent ounces could range from four to eight million equivalent ounces, with silver grades ranging from 70 to 90 grams per tonne and gold grades ranging from one to two grams per tonne. This range of potential quantity and grade is based on the mapped strike length of the veins and the existing, albeit relatively sparse, drill and trench sample assays. The potential quantity and grade are conceptual in nature, as there is insufficient work to define a mineral resource, and it is uncertain if further exploration will result in the targets being delineated as a mineral resource. The remainder of the tested (and untested) veins will also require additional exploration and drilling before their resources can be estimated.


A best-practices and increasingly stringent protocol for the collection, preparation and submission of rock samples for analysis was followed throughout the phases of exploration at Pinguino. All samples were analyzed by Acme Analytical Laboratories ("Acme Labs") except for the 2006 drilling of Phase 2 which were sent to Alex Stewart (Assayers), Argentina, S.A. The current analytical protocol, which was largely instituted in 2007 for the Phase V drilling, and which constitutes the bulk of the assay data that contributed to the resource model, begins with all field samples being submitted to Acme Labs' preparation laboratory in Mendoza, Argentina. From there, the sample pulps were sent to its laboratory in Vancouver for multi-element ICP-MS analysis (1DX procedure). Samples overlimit in silver, lead, zinc or copper were rerun by a high-detection limit ICP-ES procedure (Acme Labs code 7AR). Samples overlimit in silver from that procedure and, more recently, all gold assays greater than 300 ppb were rerun by fire assay (G6 procedure). Acme Labs is an accredited ISO 9000:2001 full-service commercial laboratory with its head office in Vancouver. Quality control was maintained by submitting field blanks and duplicates and by reviewing laboratory results of its own replicates, duplicates and analytical standards. The full QA/QC program was further evaluated by J.David Williams, P.Eng. and reviewed by MDA.


About Pinguino


Argentex's 10,000-hectare advanced silver and gold exploration Pinguino project is located in Argentina's Patagonia region, within the Deseado Massif of Santa Cruz province. The Deseado Massif is an active region of mining with four precious metal mines currently in production, and includes multiple active advanced and early stage exploration projects.


The Pinguino system has grown to 70+ individual veins, with a combined strike length approaching approx. 113 line-kilometers. The Pinguino project is unique within the Deseado Massif region of Santa Cruz province in that it contains two different and spatially distinct types of mineralization, one precious metal and the other sulphide-rich polymetallic. The Company continues to evaluate the geological model of sulphide-enriched potentially mineralized intrusives at depth, forming the probable source for the polymetallic veins exposed on surface.


Pinguino is easily accessible, situated approximately 400 meters above sea level in low-relief topography. An existing system of all-weather roads provides year-round access to the property.


The mineral resource estimate was prepared by Steven Ristorcelli, C. P. G., Principal Geologist at Mine Development Associates in Reno, Nevada in accordance with NI 43-101, and he is an independent "Qualified Person" as defined by NI 43-101. Mr. S. Ristorcelli has approved the details of the resource estimate as contained herewith.


All other content of this press release has been reviewed and approved by Mr. J. David Williams, P. Eng., and he is an independent "Qualified Person" as defined by NI 43-101.


The Company expects a complete copy of the Report will be filed on SEDAR within 45 days of this press release.


About Argentex


Argentex Mining Corporation is an exploration company focused on advancing its Pinguino silver-gold project in Santa Cruz, Argentina. In total, Argentex owns 100% of the mineral rights to more than 35 properties located within approximately 307,981 acres (124,636 hectares) of highly prospective land located in the Santa Cruz and Rio Negro provinces.


Shares of Argentex common stock trade under the symbol ATX on the TSX Venture Exchange and under the symbol AGXMF on the OTCQB.


On behalf of Argentex Mining Corporation:


Michael Brown, President and CEO


Statements in this news release that are not historical facts are forward-looking statements that are subject to risks and uncertainties. Words such as "expects", "intends", "plans", "may", "could", "should", "anticipates", "likely", "believes" and words of similar import also identify forward-looking statements.


Forward-looking statements in this news release include those concerning management's belief that the Pinguino project contains a significant high-grade silver and gold resource, its confidence that it can continue to add high grade near surface mineral resources as it continues to drill the known vein systems, its view that polymetallic mineralization provides potential for additional economic upside, and its belief that there is significant scope for increasing the resource with additional drilling on other veins, with total metal silver-equivalent ounces that could range from four to eight million equivalent ounces, with silver grades ranging from 70 to 90 grams per tonne and gold grades ranging from one to two grams per tonne.


Actual results may differ materially from those currently anticipated due to a number of factors beyond the Company's control. These risks and uncertainties include, among other things, the availability of the Company's consultants and risks that are inherent in Argentex's operations including the risks that the Company may not find any minerals in commercially feasible quantity or raise enough money to fund its exploration plans. These and other risks are described in the Company's Annual Information Form and other public disclosure documents filed on the SEDAR website maintained by the Canadian Securities Administrators and the EDGAR website maintained by the Securities and Exchange Commission.


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:

Argentex Mining Corporation

Peter A. Ball

EVP Corporate Development

604-568-2496 (ext. 103) or 1-888-227-5285 (ext. 103)

(604) 568-1540 (FAX)
peter@argentexmining.com
www.argentexmining.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Argentex Mining Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.