Prodigy Gold Inc. Signs Option Agreement on Akweska Lake Property
- Prodigy will pay the Optionors $20,000;
- Prodigy can exercise its option to acquire the Property within four years by paying the Optionors an additional $180,000 and issuing to the Optionors 200,000 common shares of Prodigy;
- In the event of exercise of the option, the Property will be subject to a royalty of 2% of net smelter returns in favour of the Optionors, half of which may be acquired by Prodigy for $1,000,000.
About Prodigy Gold:
Prodigy Gold Inc. (PDG: TSX.V) is currently evaluating the development of the Magino mine gold project in Ontario as an open-pit mining opportunity with the potential for deeper, higher grade gold production. The Magino project contains Indicated gold resources of 2,176,000 ounces grading 1.00 gpt gold (67.6 million tonnes), and 1,721,000 ounces of Inferred gold resources grading 0.99 gpt gold (54.2 million tonnes) at a cut off grade of 0.35 gpt gold. A Preliminary Economic Assessment (PEA) shows a pre-tax NPV of $939 million and an IRR of 36% using a 5% discount rate for the project (see Press Release dated December 22, 2011 and technical report available on SEDAR or Prodigy's web site). The proposed operation would have total gold production of 2,614,000 ounces and an average annual gold output of 249,300 ounces a year during an eleven year project life. Please note: mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the preliminary assessment will be realized.
A full feasibility study for the proposed open pit mining project at Magino is scheduled for completion in 2012. Bringing the Magino mine project through the feasibility process and towards production, is a catalyst to growing Prodigy Gold and building substantial value for Prodigy shareholders: Today's Discovery, Tomorrow's Future.
All scientific and technical information for the Magino project has been reviewed and approved by Tom Pollock, P.Geo., Prodigy Gold's Vice President - Exploration, who is a qualified person under the definitions established by National Instrument 43-101. Drill core at Magino is boxed, covered, and sealed at the drill rig and moved to the Prodigy logging and sample preparation facilities by Prodigy Gold personnel. The core is then split down the centre using a typical table fed circular rock saw normally at one metre intervals. One half of the core is sent for assay to Actlabs, 33 Iroquois Road, Timmins, ON, P4N 7C5, while the other half is returned to the core box and stored at Prodigy's sampling facility in a secure, fenced off, area. Prodigy QA/QC procedures include the regular use of blanks, standards and duplicate samples in addition to sending 10% of the samples off to a second lab for check assays. Samples assaying > 3.0 gpt gold are automatically re-assayed by the metallic screen method. Gold assays greater than 40 gpt are capped at 40 gpt when calculating composite intervals in drill holes. Drill holes are directed as much as possible perpendicular to the strike and dip of the mineralization at Magino. As a rough estimate the true thickness of the above intercepts is approximately 76%.
On behalf of the Board of Directors
Brian J. Maher
President and Chief Executive Officer
FOR FURTHER INFORMATION, PLEASE CONTACT:
Prodigy Gold Incorporated
Email: ir@prodigygold.com
Website: www.prodigygold.com
tel.: 1-604-688-9006 Fax: 1-604-688-9029
Prodigy Gold Inc. was recognized as a TSX Venture 50(r) company in 2012.
TSX Venture 50 is a trade-mark of TSX Inc. and is used under license.
This news release includes certain forward-looking statements or information. All statements other than statements of historical fact included in this release, including, without limitation, statements relating to the potential mineralization and geological merits of the Magino mine property and other future plans, objectives or expectations of Prodigy Gold Incorporated (the "Company") are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include risks relating to the actual results of current exploration activities, fluctuating gold prices, possibility of equipment breakdowns and delays, exploration cost overruns, availability of capital and financing, general economic, market or business conditions, regulatory changes, timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.