• Donnerstag, 26 Dezember 2024
  • 21:37 Uhr Frankfurt
  • 20:37 Uhr London
  • 15:37 Uhr New York
  • 15:37 Uhr Toronto
  • 12:37 Uhr Vancouver
  • 07:37 Uhr Sydney

Evolving Gold Expands Carlin-Humboldt Gold System

21.11.2011  |  PR Newswire

Arch Gold Zone now 1,000 Meters by 600 Meters

VANCOUVER, Nov. 21, 2011 /PRNewswire/ - Evolving Gold Corp.

(the 'Company')
is pleased to announce assays from three drill holes from the Arch Gold Zone at its Carlin gold project, Nevada. Diamond drill holes CAR-011, -012 and -013 all intersected significant gold mineralization including 60.4 meters at 1.28 grams per tonne gold in CAR-013, 32.6m at 1.10 g/t gold in CAR-011 and 6.1m at 2.42 g/t gold in CAR-012. Ongoing core drilling programs continue to focus on defining a high grade core to this large gold system, as already suggested by results previously reported such as 18.3m at 11.7 g/t gold, including 1.5m at 57.9 g/t gold, and 10.1m at 11.1 g/t gold, including 3.1m at 29.8 g/t gold.

Summary of Results:


-- The gold grades and long intervals of gold mineralization from
holes CAR-011, -012 and -013 are highly anomalous. Including
the most recent intervals, all 9 core-drill holes at the Arch
Gold Zone have intersected significant quantities of gold.
These long intervals of gold mineralization expand the already
large footprint of this gold system with total drilling
outlining a 1,000m by 600m Carlin-style gold system that is
open in all directions.
o Diamond drill hole CAR-011, a vertical hole situated 115m north of
hole CAR-007, intersected 32.6m at 1.10 g/t Au (107 feet at 0.032
oz/t) beginning at 1167.1m. This gold horizon correlates well with
the lowermost gold-bearing unit intersected in CAR-007 (25.9m at
2.10 g/t Au beginning at 1170.7m announced Feb. 25, 2010).
o Diamond drill hole CAR-012, a vertical hole situated 130 meters
southwest of hole CAR-007, encountered 6.1m at 2.42 g/t Au (20 feet
at 0.071 oz/t ) including 1.5m at 7.57 g/t Au (5 feet at 0.221 oz/t
) beginning at 713.2m. This interval correlates well with a zone
of gold mineralization intersected in CAR-007 (7.6m at 5.5 g/t Au
beginning at 759.1m announced Feb. 25, 2010).
o Two long intervals of anomalous gold were encountered deeper in
CAR-012, starting at 737.6m and 1,181.7m.
o Diamond drill hole CAR-013, a vertical hole situated 350 meters
northeast of CAR-007, encountered 60.4m at 1.28 g/t Au (198 feet at
0.037 oz/t) including 31.7m at 2.03 g/t Au (104 feet at 0.059 oz/t)
beginning at 1270.1m. This interval corresponds well with that
intersected in holes CAR-011 and -007 described above.
o An additional long interval of anomalous gold was encountered
deeper in CAR-013 starting at 1,367.9m.
o Abundant realgar, orpiment and stibnite are associated with the
gold interval in CAR-013, something observed in hole CAR-002
approximately 530m south (announced July 31, 2009).

'The company recognizes it is exploring an extensive, powerful gold system in one of the world's great gold camps. Our drilling has already intersected grades and thicknesses of mineralization that are characteristic of existing underground mines in the area. Early drilling results as a whole are consistent with the early stages of exploration at these mines. Defining the high-grade center of this large gold system is the main focus of Evolving Gold's exploration program on the Arch project.' Comments Steven Koehler, Chief Geologist of Evolving Gold.

To see a map corresponding to the drilling results shown on the table below, turn to page 3, or click here in electronic versions.





Carlin Project: Summary of Drill Results from Holes CAR-011
through -013

Hole From (m) To (m) Length (m) Gold (grams Length (ft) Gold (oz
per tonne) per ton)

CAR-011 1167.1 1199.7 32.6 1.10 107 0.032

includes 1167.7 1186.0 18.3 1.70 60 0.050



CAR-012 713.2 719.3 6.1 2.42 20 0.071

includes 717.8 719.3 1.5 7.57 5 0.221

737.6 742.6 5.0 0.41 16 0.012

774.5 793.4 18.9 0.15 62 0.004

1181.7 1232.3 50.6 0.17 166 0.005



CAR-013 1270.1 1330.5 60.4 1.28 198 0.037

includes 1284.1 1315.8 31.7 2.03 104 0.059

includes 1308.2 1314.3 6.1 3.75 20 0.110

1367.9 1404.8 36.9 0.14 121 0.004



Five kilometers south of the Arch Gold Zone, situated on the Humboldt property, the Company is presently drilling hole EHB-004, a test of one of 24 targets defined by geophysical surveys. This target is located on the northwesterly projection of the Rain-Saddle gold trend where it crosses into Evolving Gold's ground. Hole EHB-004, presently at a depth of approximately 800 meters, is targeted to reach its final depth of 1,100 meters in early December.

All drill hole averages are weighted averages, weighting each assay interval according to the core length for that assay interval. Drill samples were collected with a diamond core drill. Sample intervals are 1.5 meters (5 feet), but in some instances sample intervals were based on geology and alteration. Half core was shipped to SGS Minerals Services in Elko, Nevada for preparation and to the SGS facility in Toronto, Ontario for analysis. Gold results were determined using standard fire assay techniques on 30-gram pulps with an ICP finish. QA/QC included the insertion of standards and blanks on a regular basis.

About Evolving Gold's Flagship Carlin-Humboldt Projects

Evolving Gold's Arch discovery is part of a large 145 sq. km (56 sq. mile) land package the company assembled directly on the Carlin Trend between the 30M oz Gold Quarry sub-district and the 4M oz Rain sub-district. In 2009 Evolving Gold completed its first drill test in the region. The hole tested a gravity embayment target and successfully intersected favorable lower plate carbonate host rocks and confirmed vertically-extensive Carlin-style alteration, and mineralization. Since that first hole, eight additional core holes have been completed. Select drill results from depths of 750 to 1260 m include: 18.3 m of 11.7 g/t Au, 10.1 m of 11.1 g/t Au, and 14.7 m of 8.8 g/t Au. Drilling also confirms the presence of sulfidized dikes and fluidized multi-lithic breccias. The Carlin and Humboldt Projects are crossed by an interstate highway and within eyesight of Gold Quarry processing facilities, including the largest gold ore roaster in the world.

The drilling process includes reverse circulation (RC) drilling above the favorable rocks, core drilling through the favorable rocks, and often multiple wedge holes from the mother hole. A mud motor has recently been purchased to increase the separation of wedge holes from mother holes.

Jake Creek

The Company is currently drilling at its Jake Creek project 6 kilometers east of Newmont's Twin Creeks Mine. Assays have returned for the first three holes of the drill program. Hole JC-002 intersected 39.6m at 0.873 g/t Au beginning at 256.1m and hole JC-006 intersected 19.8m at 0.676 g/t Au beginning at 221.0m. These holes are part of a fence of angle holes being drilled across an area encompassing the discovery of covered mineralization made by the Company last year (28.9m at 1.33 g/t Au announced Nov. 18, 2010).

A total of 20 RC drill holes have been permitted. To date, three holes have been completed and two additional holes failed to reach their targeted depth. Due to technical limitations of the reverse circulation drill that was being employed at Jake Creek, the Company suspended its drill program in mid-October until a suitable replacement drill could be secured. The replacement rig has resumed drilling at Jake Creek.





Jake Creek Project: Summary of Drill Results

Gold (grams Gold (oz
Hole From(m) To (m) Length (m) per tonne) Length (ft) per ton)

JC-002 256.1 295.7 39.6 0.873 130 0.025



JC-003 309.4 310.9 1.5 0.393 5 0.012

JC-004 Hole abandoned prior to testing
target

JC-006 221.0 240.8 19.8 0.676 65 0.020

271.3 274.3 3.0 0.620 10 0.018

JC-007 Hole abandoned prior to testing
target





In compliance with National Instrument 43-101, the Company Chief Geologist, Steven R. Koehler, BSc Geology and CPG, is the Qualified Person responsible for the accuracy of this news release.

About Evolving Gold Corp.

Evolving Gold is focused on exploring its gold properties in and adjacent to the productive Carlin district of northern Nevada, and on advancing its gold discovery at Rattlesnake Hills, Wyoming. For more information about Evolving Gold please visit: www.evolvinggold.com.

On Behalf of the Board of Directors

EVOLVING GOLD CORP.

'William Gee'

William Gee

CEO and Director

FORWARD LOOKING STATEMENTS: This press release contains forward-looking statements, which address future events and conditions, which are subject to various risks and uncertainties. The Company's actual results and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company's control. These factors include: results of exploration activities and development of mineral properties, fluctuations in the marketplace for the sale of minerals, the inability to implement corporate strategies, the ability to obtain financing, currency fluctuations, general market and industry conditions and other risks disclosed in the Company's filings with Canadian Securities Regulators.

Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law. We seek safe harbour.

SOURCE Evolving Gold Corporation

PDF with caption: 'Arch Gold Zone - 1000m long and 600m wide - Open in all directions'. PDF available at: http://stream1.newswire.ca/media/2011/11/21/20111121_C7892_DOC_EN_7013.pdf

Evolving Gold Corporation

CONTACT: Investor Relations:

Rory Quinn

Tel: 604.630.0792

TF: 866.604.3864

rory@evolvinggold.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
American Future Fuel Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.