• Freitag, 15 November 2024
  • 08:33 Uhr Frankfurt
  • 07:33 Uhr London
  • 02:33 Uhr New York
  • 02:33 Uhr Toronto
  • 23:33 Uhr Vancouver
  • 18:33 Uhr Sydney

Spanish Mountain Gold Reports Results From Current Drill Program: 204.3m Grading 0.46g/t Gold Including 52.8m Grading 0.74g/t Gold

02.06.2011  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 06/02/11 -- Spanish Mountain Gold Ltd. (TSX VENTURE: SPA) ('the Company') is pleased to announce preliminary results of the in-fill drilling program within the Main and North Zones of its Spanish Mountain Gold Project (the 'Project') located in central British Columbia, Canada. These results represent approximately 30% of the total planned drill holes that are designed to upgrade mineralization from the Inferred to Measured and Indicated categories, test for extensions to gold mineralization laterally and at depth and to optimize the design of pit walls.


Highlights of Drilling Results include:



-- 204.3 metres (m) grading 0.46 gram per tonne (g/t) gold including 52.8m
grading 0.74g/t gold and including 20.4m grading 1.26g/t gold in hole
11-DDH-921.
-- 62.5m grading 0.64g/t gold in hole 11-DDH-925.
-- 53.5m grading 0.65g/t gold including 1.5m grading 15.25g/t gold in hole
11-DDH-927.
-- 127.0m grading 0.51g/t gold in hole 11-DDH-931.
-- 74.8m grading 0.52g/t gold including 9.0m grading 1.72g/t gold in hole
11-DDH-939.
-- 59.8m grading 0.57g/t gold including 4.8m grading 1.43g/t gold in hole
11-DDH-937.


Significant assay results are contained in Table 1 appended to this news release.


Discussion of Results and Project Update


Drilling to date has confirmed the presence of the mineralized argillite-siltstone sedimentary horizon throughout the North Zone. The drilling has also encountered two new zones of mineralized argillite that the Company expects to better define by drilling, the results from which will be included in an updated resource estimate.


In addition to the in-fill drilling, the current program includes exploration holes designed to test for extensions to mineralization intersected along horizons extending both to the southeast and west and at depth.


The current program within the Main and North Zones is expected to be completed within a month at which time the Company will commence exploration drilling in the Cedar Creek area of the Spanish Mountain Property. Historical work in this area, including geological mapping, airborne geophysics and intensive soil surveys has revealed the presence of interbedded sequences of graphitic argillite-bearing sediments and mafic volcanic rocks supporting soils anomalous in a number of elements including gold and copper.


In addition to the in-fill and exploration drilling being conducted, the Company is preparing to begin a Preliminary Feasibility Study for the Project, based on the positive results contained within the Preliminary Economic Assessment completed in 2010 (see News Release dated November 23, 2010).


Judy Stoeterau, P.Geo., the Company's Vice-President of Geology and the qualified person as defined under National Instrument 43-101, has reviewed the contents of this news release. All core samples are assayed at ALS Chemex Laboratory in Vancouver, BC.


About Spanish Mountain Gold


Spanish Mountain Gold Ltd. is focused on the responsible development of its flagship Spanish Mountain gold project in southern central British Columbia, Canada. The Company has no debt and owns 100% of four gold properties located in British Columbia. Additional information about the Company is available on its website: www.spanishmountaingold.com


On Behalf of the Board,


SPANISH MOUNTAIN GOLD LTD.


Brian Groves, President and CEO


This News Release contains forward-looking statements. Forward looking statements are statements which relate to future events. In some cases, you can identify forward-looking statements by terminology such as 'may', 'should', 'expects', 'plans', 'anticipates', 'believes', 'estimates', 'predicts', 'potential', or 'continue' or the negative of these terms or other comparable terminology. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our actual results, level of activity, performance or achievements to be materially different from any future results, levels of activity, performance, or achievements expressed or implied by these forward-looking-statements. Management has assumed that these will be our major projects going forward. Risks include that we are unable to satisfy environmental or other regulators, that we determine that our resources are not commercially viable, or that we have difficulties due to unavailability of labour or equipment.


While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggests herein. Except as required by applicable law the Company does not intend to update any forward-looking statements to conform these statements to actual results.


Table 1: Significant Assay Results



---------------------------------------------------------------------------
Au Grade
Hole From To Length (m) (g/t)
---------------------------------------------------------------------------
11-DDH-919 5.5 215.5 210.0 0.38
------------------------------------------------------------
including 5.5 63.5 58.0 0.53
------------------------------------------------------------
and 164.2 205.5 41.3 0.46
---------------------------------------------------------------------------
11-DDH-920 17.0 116.5 99.5 0.31
------------------------------------------------------------
including 70.5 72.2 1.7 2.09
------------------------------------------------------------
and 97.0 116.5 19.5 0.51
---------------------------------------------------------------------------
11-DDH-921 3.7 208.0 204.3 0.46
------------------------------------------------------------
including 3.7 56.4 52.8 0.74
------------------------------------------------------------
and 36.0 56.4 20.4 1.26
---------------------------------------------------------------------------
and 92.0 145.0 53.0 0.52
---------------------------------------------------------------------------
11-DDH-922 20.0 151.0 131.0 0.41
------------------------------------------------------------
including 20.0 38.0 18.0 0.98
---------------------------------------------------------------------------
11-DDH-923 21.0 127.0 106.0 0.38
------------------------------------------------------------
including 81.5 127.0 45.5 0.54
---------------------------------------------------------------------------
11-DDH-925 92.0 154.5 62.5 0.64
------------------------------------------------------------
including 95.0 110.0 15.0 1.14
------------------------------------------------------------
and 140.0 140.8 0.8 3.99
---------------------------------------------------------------------------
11-DDH-926 130.5 165.5 35.0 0.50
---------------------------------------------------------------------------
11-DDH-927 17.5 71.0 53.5 0.65
------------------------------------------------------------
including 28.8 30.3 1.5 15.25
---------------------------------------------------------------------------
11-DDH-928 27.5 239.9 212.4 0.37
including 125.5 174.5 49.0 0.71
------------------------------------------------------------
and 164.0 171.5 7.5 1.21
---------------------------------------------------------------------------
11-DDH-930 6.5 42.5 36.0 0.55
------------------------------------------------------------
including 27.3 29.0 1.8 2.06
------------------------------------------------------------
and 39.5 41.0 1.5 3.64
---------------------------------------------------------------------------
11-DDH-931 21.5 148.5 127.0 0.51
------------------------------------------------------------
including 49.5 54.0 4.5 1.53
------------------------------------------------------------
and 129.5 139.3 9.8 1.06
---------------------------------------------------------------------------
11-DDH-932 17.0 63.5 46.5 0.41
------------------------------------------------------------
including 18.5 21.5 3.0 1.46
------------------------------------------------------------
and 44.0 45.5 1.5 1.82
---------------------------------------------------------------------------
11-DDH-935 4.6 49.5 44.9 0.53
------------------------------------------------------------
including 4.6 9.5 4.9 1.15
---------------------------------------------------------------------------
11-DDH-934 3.7 16.6 12.9 0.53
------------------------------------------------------------
and 31.5 33.0 1.5 2.10
---------------------------------------------------------------------------
11-DDH-936 5.5 31.0 25.5 0.48
------------------------------------------------------------
including 23.5 25.0 1.5 1.44
---------------------------------------------------------------------------
11-DDH-937 4.6 266.7 262.1 0.33
------------------------------------------------------------
including 22.7 82.5 59.8 0.57
------------------------------------------------------------
and 22.7 27.5 4.8 1.43
------------------------------------------------------------
and 104.5 133.2 28.7 0.68
---------------------------------------------------------------------------
11-DDH-938 3.7 23.0 19.3 0.52
---------------------------------------------------------------------------
11-DDH-939 41.5 116.3 74.8 0.52
------------------------------------------------------------
including 59.5 68.5 9.0 1.72
---------------------------------------------------------------------------


The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

Contacts:

Spanish Mountain Gold Ltd.

Brian Groves

(604) 601-3651
info@spanishmountaingold.com
www.spanishmountaingold.com


B&D Capital Partners

(604) 685-6465



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Spanish Mountain Gold Ltd.
Bergbau
A0YJQF
CA8464811097
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.