• Samstag, 16 November 2024
  • 09:28 Uhr Frankfurt
  • 08:28 Uhr London
  • 03:28 Uhr New York
  • 03:28 Uhr Toronto
  • 00:28 Uhr Vancouver
  • 19:28 Uhr Sydney

Nevada Copper Intersects 1,164 Feet of 0.49% Copper in the Pumpkin Hollow North Deposit

03.05.2011  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 05/03/11 -- Nevada Copper Corp. (TSX: NCU) ('Nevada Copper')is pleased to announce further positive drill results from the Western Deposits at the 100% owned Pumpkin Hollow Property located in Nevada. The holes reported below represent assay results from geotechnical drilling related to the Definitive Feasibility Study ('DFS') and initial drill results from the current 20,000 meter step-out and expansion program. Geotechnical drilling and data collection is now complete with all three (3) drilling rigs focused on the expansion drilling program.


In the North Deposit, NC10-GT09 was drilled to collect geotechnical data in the southwestern portion of this deposit. A very large mineralized zone was intersected, the upper portion of the hole confirmed existing mineralization and the lower portion continued in new mineralization. The southwestern boundary of the deposit remains open. Drill hole NC-GT-09 intersected 1,191 feet (363 meters), 1,164 feet (355 meters) true thickness, averaging 0.49% copper.


NC10-75 and 76 were drilled to extend mineralizationin the northwestern portion of the open pit North Deposit. These holes were pre-collared in 2010 and later completed and assayed in 2011.


'Drilling in the North Deposit continues to intersect significant zones of mineralization. NC10-GT09 intersected one of the largest mineralized zones to date. The hole proved very positive as not only was necessary geotechnical data collected and mineral continuity confirmed, the hole was successful in expanding mineralization along the southern boundary of the deposit. Follow up holes are planned and will be added to 2011 program', commented Gregory French, Vice President, Senior Project Manager of Nevada Copper.



NORTH DEPOSIT - Assays greater than 0.2% Cu
----------------------------------------------------------------------------
----------------------------------------------------------------------------
True Sil-
Drill From To Length Length Length Copper Gold ver Mo
Hole # (m) (m) (m) (ft) (m) (%) (g/t) (g/t) (%)
----------------------------------------------------------------------------
NC10-GT09 165.9 528.8 362.9 1,190.6 354.9 0.49 0.073 1.9 0.007
----------------------------------------------------------------------------
Including 176.8 272.8 96.0 315.0 93.9 0.80 0.104 3.1 0.007
----------------------------------------------------------------------------
356.6 408.4 51.8 170.0 50.7 0.52 0.075 2.3 0.012
----------------------------------------------------------------------------
429.8 518.2 88.4 290.0 86.5 0.60 0.114 1.7 0.007
----------------------------------------------------------------------------
less
than
NC10-75 266.7 281.9 15.2 50.0 10.7 1.09 0.032 0.8 0.001
----------------------------------------------------------------------------
294.1 317.0 22.9 75.0 16.2 0.20 0.004 0.6 0.004
----------------------------------------------------------------------------
371.9 376.4 4.5 15.0 3.2 0.54 0.019 1.3 0.002
----------------------------------------------------------------------------
NC10-76 189.0 205.1 16.1 53.0 11.4 0.49 0.024 0.9 0.001
----------------------------------------------------------------------------
214.9 221.0 6.1 20.0 4.3 0.97 0.024 1.3 0.001
----------------------------------------------------------------------------
357.7 389.9 32.2 105.8 22.8 0.75 0.021 1.0 0.003
----------------------------------------------------------------------------


Geotechnical holes NC10-GT06, GT08, and GT11 were drilled in the South Deposit. NC10-GT06 and GT11 were drilled predominantly in footwall lithologies of the northwest and south portions of the deposit. NC10-GT08 was drilled though mineralization to the northwest. The hole intersected a large zone that confirmed the mineralization, intersecting 614 feet (187 meters), 470 feet (143 meters) true thickness averaging 0.43% copper.



SOUTH DEPOSIT - Assays greater than 0.2% Cu
----------------------------------------------------------------------------
----------------------------------------------------------------------------
True
Drill From To Length Length Length Copper Gold Silver Fe
Hole # (m) (m) (m) (ft) (m) (%) (g/t) (g/t) (%)
----------------------------------------------------------------------------
NC10-GT06 125.0 152.4 27.4 90.0 23.0 0.57 0.103 4.3 25.7
----------------------------------------------------------------------------
285.3 292.8 7.5 24.7 6.3 0.32 0.131 2.8 16.8
----------------------------------------------------------------------------
NC10-GT08 127.1 314.2 187.1 614.0 143.3 0.43 0.054 1.3 30.8
----------------------------------------------------------------------------
NC10-GT11 163.1 294.4 131.3 431.0 100.6 0.39 0.092 1.0 2.5
----------------------------------------------------------------------------


Plan maps with recent drill locations are available at http://www.nevadacopper.com/i/pdf/NO_section_48100E.pdf.


About Nevada Copper


Nevada Copper has 59.0 million shares outstanding and is well funded with no debt and approximately $21 million in cash. The DFS is being prepared by Tetra Tech and targeted for completion by June 30, 2011. Further drill results from its resource step-out and expansion drilling program will be released as they become available.


The Pumpkin Hollow drilling program is under the supervision of Gregory French, CPG #10708, and a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. All assaying and whole rock geochemistry is processed at the American Assay Laboratories (AAL) in Reno, Nevada. Samples are delivered from the project core logging facility to AAL by Nevada Copper or AAL personnel. A Quality Assurance and Quality Control Assay Protocol have been implemented whereby blanks and standards are inserted into the assay stream and check samples are sent to Chemex-Reno and Inspectorate-Reno laboratories.


For additional information about Nevada Copper please visit our website at www.nevadacopper.com.


To see additional maps, please visit the following link: http://media3.marketwire.com/docs/nc52.pdf.


NEVADA COPPER CORP.


Giulio T. Bonifacio, President & CEO


We seek safe harbour.

Contacts:

Nevada Copper Corp.

Eugene Toffolo

Corporate Communications

604-683-8266 or Toll free: 1-877-648-8266
etoffolo@nevadacopper.com


Nevada Copper Corp.

Robert McKnight, P.Eng.

Executive Vice President

604-683-1309
bmcknight@nevadacopper.com
www.nevadacopper.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Nevada Copper Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.