• Mittwoch, 25 Dezember 2024
  • 06:25 Uhr Frankfurt
  • 05:25 Uhr London
  • 00:25 Uhr New York
  • 00:25 Uhr Toronto
  • 21:25 Uhr Vancouver
  • 16:25 Uhr Sydney

Bayridge Resources Commences Drilling at Waterbury East Project

02.10.2024  |  Newsfile

Vancouver, October 2, 2024 - Bayridge Resources Corp. (CSE: BYRG) ("Bayridge") has commenced its fall 2024 drilling program at its 1,337 ha Waterbury East uranium project in Canada's Athabasca Basin. This phase of drilling will total 2,100 metres and consist of 4 to 6 holes, testing multiple targets.

"Our fully-funded fall 2024 program is the first drilling at Waterbury East since 2007," commented President and CEO, Saf Dhillon. "We will be following up on the best intersection from 2006/2007, guided by the spring 2024 VTEM survey, as well as testing target areas along the VTEM conductor," he continued. "We anticipate a 30 to 45 day program with results expected later in Q4," he concluded.

VTEM interpretation by in3D Geoscience suggests 2006/2007 drilling of the VTEM conductor was actually short of the conductor and also the strength of the conductor may be stronger than previously thought.

CanAlaska Uranium Ltd. ("CanAlaska") reported encouraging results from the 2006/2007 drill program, with an intersection of 17.0 m of anomalous basement-hosted uranium enrichment, containing a highlight value of 324 ppm U over 0.6 m in a structurally controlled zone in DDH-WAT005. *Readers are cautioned that Bayridge has not verified these historical results.

The Waterbury East project is underlain by geology favourable to hosting both unconformity-hosted and basement-hosted uranium deposits. These deposits are typically associated with graphitic metasediments and structural zones that exhibit strong EM conductor responses. Historical airborne EM surveys have defined an ENE-striking conductor across the property, with a depth to unconformity of ~200m. Most of the uranium discoveries in the Athabasca Basin are concentrated along the unconformity edge, where the sedimentary cover is the thinnest (<300m).

Bayridge holds a staged option to earn up to an 80% interest in Waterbury East from CanAlaska through a series of cash payments, share issuances and exploration expenditures over the next 4 years. Waterbury East is located 25 km northeast of the Cigar Lake Mine, 15 km south of Points North and is accessible from the Cigar Lake winter road.

R. Tim Henneberry, P.Geo. (BC) and a consultant to the Company, is the Qualified Person under National Instrument 43-101 who has reviewed and approved the technical content of this release.

About Bayridge Resources Corp.

Bayridge Resources Corp. is a green energy company advancing its portfolio of Canadian uranium and lithium projects. The 1,337 ha Waterbury East project is located 25 km northeast of the Cigar Lake Mine in the northeastern Athabasca Basin region. Geophysical surveys have identified a 7km long conductivity corridor where mid-2000's drilling highlighted faulted and altered basement rock with local uranium enrichment. Large sections of this corridor remain untested. The 11,142 ha Constellation project is located 60 km south of the present-day Athabasca Basin edge in an area of significant exploration activity for basement hosted uranium. Historic airborne radiometric, electromagnetic, and magnetic surveys identified electromagnetic conductors associated with magnetic lows. The 4,413 ha Sharp Lake project, located in the Red Lake Mining District of Northern Ontario, hosts peraluminous S-type muscovite bearing pegmatite bearing granites in contact with metasediments. Preliminary sampling has highlighted anomalous rare-element values, potentially indicative of lithium mineralization.

For more information, please contact:

Saf Dhillon, President & Chief Executive Officer
E-mail: saf@bayridgeresources.com
Tel: 604-484-3031

Forward-Looking information

Certain statements in this news release are forward-looking statements, which reflect the expectations of management regarding drilling at the Waterbury East uranium project and the expected results of the drilling. Forward-Looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. Such statements are subject to risks and uncertainties that may cause actual results, performance, or developments to differ materially from those contained in the statements. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what benefits the Company will obtain from them. Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change.

The CSE has not reviewed, approved, or disapproved the contents of this press release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/225318


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Bayridge Resources Corp.
Bergbau
A3EU56
CA07309M1041
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.