• Donnerstag, 26 Dezember 2024
  • 19:57 Uhr Frankfurt
  • 18:57 Uhr London
  • 13:57 Uhr New York
  • 13:57 Uhr Toronto
  • 10:57 Uhr Vancouver
  • 05:57 Uhr Sydney

Resouro Gold Inc. Reports High Grade Initial Results at Tiros Rare Earths and Titanium Project

12.09.2023  |  Newsfile
Toronto, Sept. 12, 2023 - Resouro Gold Inc. (TSXV: RAU) (FSE: BU9) ("Resouro" or the "Company") is pleased to announce significant initial exploration results as part of the previously announced exploration campaign at Tiros Rare Earths and Titanium Project in Brazil (the "Tiros Project").

Key Highlights

- Initial follow up Auger drilling at Tiros delivers compelling assay results, including:

  • 11m of 7,197ppm TREO (1,444 ppm NdPr) and 20.56% TiO2 from 4m; and
  • 11m of 5,253ppm TREO (1,056 ppm NdPr) and 15.26% TiO2 from surface.
  • All 5 initial holes hit mineralization, averaging 5,134 ppm TREO, at an average NdPr of over 1,038 ppm, from surface to a maximum depth of 15m.

- A total of 227 m was drilled in the initial program, awaiting assays on remaining 18 holes

- A composited metallurgical sample, made from new Auger samples, were sent to ANSTO, Dofner Anzaplan and Prosper Laboratory for further analysis

- Drilling contract signed for 12,000m AC drill program at Tiros Project to commence mid-September

Chris Eager, CEO of Resouro, commented:

"We are extremely pleased with results from the initial follow up drill program at Tiros and look forward to receiving further assay results from this program currently sitting with the lab, as well as accelerating our drill campaign at the project. Additionally, initial metallurgical results from the Brazilian lab have been encouraging, and we eagerly await results from world-class labs in Australia and Germany to further demonstrate the metallurgical characteristics of Tiros. On both fronts, we look forward to updating the market as results materialize."

Auger Drilling Progress and Initial Assay Results

Resouro commenced its initial follow up program at Tiros in July. 23 new Auger drill holes for a total of 227 m have been completed by Resouro's exploration team at the Tiros Rare Earths and Titanium Project. The Auger holes were drilled into near surface areas of severely oxidized zone, which lies at the top of the Capacete formation. Highlights of the initial assay results are shown in Table 1 (Also see Figure 1 for Locations).

The Capacete formation averages approximately 40 meters in thickness, with Auger drilling limited to a maximum of 15 meters in depth. All auger holes ended in high grade TREO (over 3,000ppm) and Ti02 (over 10%) mineralization.

Samples from an additional 18 Auger holes are currently being analyzed at SGS Brazil. 203 assay are expected to be received in the coming weeks. 20% of the assays are QA/QC samples (blanks, duplicates and standards).

Table 1 - Auger drill sample highlights

Hole ID FROM TO THICKNESS (m) TiO2 % Nd+Pr oxide ppm TREO ppm
FT-01 0 6 6 20.56 501 4,189
FT-02 0 11 11 15.26 1,056 5,253
FT-03 0 6 6 15.03 1,103 4,058
FT-04 4 15 11 20.56 1,444 7,197
FT-05 2 9 7 10.92 774 3,455

The average TREO grade was 5,134 ppm and the average Nd+Pr ox grade was 1,038 ppm.

In addition, anomalous Niobium grades were observed, with average grade of 860 ppm Nb over the same mineralized intervals, with significant intervals over 1,200 ppm Nb. Resouro will investigate this further, given the proximity to the world's largest Niobium Mine in Araxa, 120 km to the southwest of Tiros.

Figure 1: Auger drillholes Map



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5944/180375_220cc62ce4bf79b5_001full.jpg

Metallurgical Test Work

A Composite sample was produced. Samples have been sent to globally recognized labs in Australia and Germany to determine the leachability of the Rare Earths Elements. A 207 kg composite sample made up from historic drill samples was previously sent to Prosper Laboratory in Brazil for analysis for Rare Earths Leachability and TiO2 Concentration. Results from this work in Brazil were encouraging. Resouro expects to complete a full interpretation of these results combined with findings of current test-work from the new auger samples being completed at internationally accredited laboratories specialized in Rare Earth Elements.

A 200kg Metallurgical Composite Sample was produced from auger samples:

  • 50kg has been shipped to ANSTO in Australia:
  • 50kg to Dofner Anzaplan in Germany and
  • An additional 100kg to Prosper Laboratory in Brazil.

Resouro plans to announce the full suite of metallurgical testwork upon before completion of the 2023 exploration program.

Drilling (AC)

Additionally, the Company a signed a contract with Drillbell Sondagens Ltda to begin a 12.000m Air Core drill program at the Tiros Project mid-September 2023.

Up to three drill rigs will be mobilized to accelerate the sampling and results. This first drilling campaign should be completed by Q1 2024 and environmental permitting for part of this campaign has already been obtained by the Company.

The drill program aims to confirm continuity and depth of the mineralized zones within the Capacete Formation as well as to test the grades and recovery of the TREO elements and TiO2 via chemical and metallurgical tests.

Qualified Person ("QP")

The technical content of this news release has been reviewed and approved by Rodrigo Mello BE Geology, AUSIMM and a qualified person as defined by National Instrument 43-101.

About Resouro Gold Inc.

Resouro is a Canadian-based mineral exploration and development company focused on the discovery and advancement of economic mineral projects in Brazil, including the Tiros Project in Minas Gerais and the Novo Mundo Gold Project in Mato Grosso. Learn more about the Company on its website: https://resouro.com.

On behalf of the Board of Directors,
Chris Eager, President & CEO
Resouro Gold Inc.

For further information, please contact the Company at:

Chris Eager, CEO
chris.eager@resouro.com

For Investor inquiries
nick@grovecorp.ca
416-642-1807

Forward-Looking Information

This news release contains certain "forward-looking information" within the meaning of applicable securities law. Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. In particular, forward-looking information in this press release includes, but is not limited to, statements with respect to the completion of the respective transactions contemplated in the Resmin Agreement and Tiros Agreement, including the completion of the Tiros PFS, the Test Work, and the Tiros DFS, along with completion of the earn-ins and share transfers. Although we believe that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. We cannot guarantee future results, performance or achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or in part, as those set out in the forward-looking information.

Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking information. Some of the risks and other factors that could cause the results to differ materially from those expressed in the forward-looking information include, but are not limited to: general economic conditions in Canada and globally; industry conditions, including governmental regulation and environmental regulation; failure to obtain industry partner and other third party consents and approvals, if and when required, including obtaining conditional and final acceptance of the TSXV; the need to obtain required approvals from regulatory authorities; stock market volatility; liabilities inherent in the mining industry; competition for, among other things, skilled personnel and supplies; incorrect assessments of the value of acquisitions; geological, technical, processing and transportation problems; changes in tax laws and incentive programs; failure to realize the anticipated benefits of acquisitions and dispositions; and the other factors. Readers are cautioned that this list of risk factors should not be construed as exhaustive.

The forward-looking information contained in this news release is expressly qualified by this cautionary statement. We undertake no duty to update any of the forward-looking information to conform such information to actual results or to changes in our expectations except as otherwise required by applicable securities legislation. Readers are cautioned not to place undue reliance on forward-looking information.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Resouro Strategic Metals Inc.
Bergbau
A3EVCJ
CA76134C1023
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.