• Donnerstag, 26 Dezember 2024
  • 18:29 Uhr Frankfurt
  • 17:29 Uhr London
  • 12:29 Uhr New York
  • 12:29 Uhr Toronto
  • 09:29 Uhr Vancouver
  • 04:29 Uhr Sydney

Nevada Gold Mines Commences Drill Program at Ridgeline Minerals's Swift Gold Project, Nevada

10.08.2023  |  Newsfile

Vancouver, August 10, 2023 - Ridgeline Minerals Corp. (TSXV: RDG) (OTCQB: RDGMF) (FSE: 0GC0) ("Ridgeline" or the "Company") is pleased to announce that Nevada Gold Mines LLC ("NGM" or "Nevada Gold Mines"), a joint venture between Barrick Gold and Newmont Corp., has mobilized a drill rig to the Swift Gold Project ("Swift") located in the Cortez District of the Battle Mountain - Eureka mine trend (Figure 1). Ridgeline entered into an exploration earn-in agreement with NGM on September 22, 2021 (see press release HERE) where NGM can incur a minimum of US$ 20 million (of which US$ 5 million has been spent to-date) in qualifying work expenditures over an initial five-year term to earn an initial 60% interest in Swift, and will have further options to increase its interest to a total 75% interest. Details of the proposed drill program are highlighted below.

Drill Program Highlights

  • Drill hole SW23-005 will target the intersection of proposed low-angle structures and favourable lower plate carbonate host rocks of the Wenban and Roberts Mountains Formations.

    • Drill hole will provide key litho-structural information between historical drill intercepts in hole MCK-99-5A (18.3 meters ("m") grading 0.64 grams per tonne ("g/t") gold ("Au")) and 2022 NGM drill intercepts in SW22-002 (41.9 m grading 0.26 g/t Au) and SW22-003 (48.8 m grading 0.45 g/t Au), (see Figure 2 and February 16, 2023 press release HERE)

  • Drill hole SW22-004 will be extended from a starting depth of 1,104 m where the hole was previously halted by NGM in January 2023 due to severe winter weather conditions.

    • Drilling returned up to 3.0 m grading 2.27 g/t Au in Upper Plate rocks prior to intersecting Lower Plate host rocks at 1,065 m (Figure 2).

    • Hole will be extended through prospective host rocks to an anticipated depth of 1,500+ meters.

Chad Peters, Ridgeline's President, CEO & Director commented, "To date, we are very encouraged by the exploration results at Swift with early results highlighting the potential to discover a large Carlin-Type gold system. The Nevada Gold Mines team has done an exceptional job generating a property-wide geologic model and SW23-005 will target a highly prospective structural corridor bounded by mineralized gold intercepts on both sides. We look forward to updating our shareholders as results are received."



Figure 1: Plan view map showing the location of the Swift exploration earn-in agreement with Nevada Gold Mines. Modified from Barrick Investor Day presentation¹ (November 18, 2022 Presentation HERE)

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7298/176708_79cf3f51c4ab1966_002full.jpg



Figure 2: Ridgeline's conceptual long section A-A' interpreted from drilling to-date highlights past exploration results and proposed 2023 drill holes

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7298/176708_79cf3f51c4ab1966_003full.jpg

Swift Project

Swift is located on the Cortez District of the historic Battle Mountain - Eureka Trend approximately 30 kilometers ("km") south of the town of Battle Mountain, in Lander County, Nevada. The district-scale 75 km² property is on trend to the Pipeline, Cortez Hills, and Goldrush deposits (View our Swift VRIFY Presentation), which comprise the multi-million ounce Cortez Complex owned by Nevada Gold Mines (a joint venture between Barrick Gold and Newmont Corp.). Ridgeline entered into an exploration earn-in agreement with NGM on September 22, 2021, where NGM can incur a minimum US$20 million (of which US$ 5 million has been spent to-date) in qualifying work expenditures over an initial five-year term to earn an initial 60% interest in the Swift gold project. NGM will have further options to increase its interest to a total 75% interest (subject to additional expenditures and commitments).

QAQC Procedures

Samples are submitted to ALS Minerals, Elko Nevada, which is a certified and accredited laboratory, independent of Nevada Gold Mines. Samples are prepared using industry-standard prep methods and analysed using Au-AA23 (Au; 30 g fire assay) and ME-MS61 (48 element Suite; 0.25 g 4-acid digestion/ICP-MS) methods. ALS also undertakes its own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment calibration. Nevada Gold Mines QAQC program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results completed internally by Nevada Gold Mines technical personnel.

Technical information contained in this news release has been reviewed and approved by Michael T. Harp, CPG. the Company's Vice President, Exploration, who is Ridgeline's Qualified Person under National Instrument 43-101 and responsible for technical matters of this release.

About Ridgeline Minerals Corp.

Ridgeline is a discovery focused gold-silver explorer with a proven management team and a 192 km² exploration portfolio across six projects in Nevada and Idaho, USA. More information about Ridgeline can be found at www.RidgelineMinerals.com.

On behalf of the Board
"Chad Peters"
President & CEO

Further Information:
Chad Peters, P.Geo.
President & CEO
Ridgeline Minerals Corp.
(775) 304-9773 | info@ridgelineminerals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

Cautionary Note regarding Forward-Looking Statements

Statements contained in this press release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward-Looking Information includes, but is not limited to, the anticipated benefits of the Earn-In Agreement and the transaction contemplated thereby. The words "potential", "anticipate", "meaningful", "discovery", "forecast", "believe", "estimate", "expect", "may", "will", "project", "plan", "historical", "historic" and similar expressions are intended to be among the statements that identify Forward-Looking Information. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results to be materially different from any future results expressed or implied by the Forward-Looking Information. In preparing the Forward-Looking Information in this news release, Ridgeline has applied several material assumptions, including, but not limited to, assumptions that TSX Venture Exchange approval will be granted in a timely manner subject only to standard conditions; the current objectives concerning the Project can be achieved and that its other corporate activities will proceed as expected; that general business and economic conditions will not change in a materially adverse manner; and that all requisite information will be available in a timely manner. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of Ridgeline to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. Such risks and other factors include, among others, risks related to dependence on key personnel; risks related to unforeseen delays; risks related to historical data that has not been verified by the Company; as well as those factors discussed in Ridgeline's public disclosure record. Although Ridgeline has attempted to identify important factors that could affect Ridgeline and may cause actual actions, events, or results to differ materially from those described in Forward-Looking Information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, Ridgeline does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/176708


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Ridgeline Minerals Corp.
Bergbau
A2QBQ4
CA7660871004
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.