• Donnerstag, 26 Dezember 2024
  • 05:40 Uhr Frankfurt
  • 04:40 Uhr London
  • 23:40 Uhr New York
  • 23:40 Uhr Toronto
  • 20:40 Uhr Vancouver
  • 15:40 Uhr Sydney

Notice of Public Consultation for the Marban Engineering Project

04.01.2023  |  CNW
VAL-D'OR, Jan. 4, 2023 - O3 Mining Inc. (TSXV: OIII) (OTCQX: OIIIF) ("O3 Mining" or the "Company"), in accordance with section 31.3.1 of the Environment Quality Act (chapter Q-2), announces the start of the environmental assessment of the Marban Engineering Project and issues a notice of public consultation for the project filed with the Minister of the Environment and the Fight Against Climate Change, Wildlife and Parks.

O3 Mining is a gold explorer and mining developer in the process of becoming a gold producer. The Company's Marban mine project is located approximately 15 km northwest of Val-d'Or, in the administrative region of Abitibi-Témiscamingue.

The Marban gold mine project includes the operation of an open pit mine with a 10-year mine life, including two (2) main pits and four (4) secondary pits; surface infrastructure dedicated to the transportation of ore,waste rock and tailings; an ore processing plant; accumulation areas for waste rock, tailings and overburden; related infrastructure (power supply, telecommunications, heating, ventilation, water treatment, etc.); the diversion of an existing road and the creation of a new access road to the project from Highway 117; the diversion of a creek currently flowing over the mineral deposits covered by the project; and the development of a site rehabilitation plan to be implemented at the end of mining operations.

For more information, the public may consult the notice of project filed by the Company (the project proponent) with the minister from Québec's Ministère l'Environnement et de la Lutte contre les changements climatiques, de la Faune et des Parcs which contains, in particular, a description of the project and the site, and a description of the main issues identified and the anticipated impacts on the receiving environment.

The project notice and the Minister's directive on carrying out the project impact study are available for consultation in the public register of projects subject to the environmental impact assessment and review procedure, using the following link: Registre des évaluations environnementales or at the address: ree.environnement.gouv.qc.ca/index.asp

Any person, group or municipality may send the Minister, in writing and no later than February 3, 2023, their comments about issues they believe the project impact assessment statement should address. Such comments may be sent to the Minister through the public register at the above-mentioned Web address.

Additional information on the environmental assessment process for this project can be obtained by calling (418) 521-3933 and by visiting the website of the Ministère, de l'Environnement et de la Lutte contre les changements climatiques, de la Faune et des Parcs using the following link: Environmental Assessments or the following Web address: environnement.gouv.qc.ca/evaluations/inter_en.htm

About O3 Mining Inc.

O3 Mining Inc., an Osisko Group company, is a gold explorer and mine developer on the road to produce from its highly prospective gold camps in Québec, Canada. O3 Mining benefits from the support, previous mine-building success, and expertise of the Osisko team as it grows towards being a gold producer with several multi-million-ounce deposits in Québec.

O3 Mining is well-capitalized and owns a 100% interest in all its properties (66,000 hectares) in Québec. O3 Mining trades on the TSX Venture Exchange (TSXV: OIII) and OTC Markets (OTCQX: OIIIF). The Company is focused on delivering superior returns to its shareholders and long-term benefits to its stakeholders. Further information can be found on our website at https://o3mining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

SOURCE O3 Mining Inc.



Contact
Jose Vizquerra Benavides, President, CEO and Director, Toll-Free: +1 (833) 979-3516, Telephone: +1 (873) 381-2014

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
O3 Mining Inc.
Bergbau
A2PNTH
CA67113B1085
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.