• Donnerstag, 26 Dezember 2024
  • 08:44 Uhr Frankfurt
  • 07:44 Uhr London
  • 02:44 Uhr New York
  • 02:44 Uhr Toronto
  • 23:44 Uhr Vancouver
  • 18:44 Uhr Sydney

Baru Gold Commences 25,000 Meters Drilling Development Program at Sangihe Binebase-Bawone Area

14.09.2021  |  The Newswire
Vancouver, September 14, 2021 - Baru Gold Corp. ("Baru") or the ("Company") (TSXV:BARU) | (OTC: BARUF) is pleased to announce, it has now approved the budget, signed the drilling contract, and embarked on a 25,000-meter drilling program.

This Resource Development program will incorporate the use of a track mounted Reverse Circulation (RC) drilling rig and is expected to take 12 months to complete. The Company has selected Indodrill of Bogor, Indonesia as the drilling contractor to complete the work.

The initial area targeted for this drilling is covered in the Sangihe 2010 NI 43-101 report which identified 835,000 ounces of gold as an inferred resource between Binebase and Bawone villages over approximately 1.2 kilometres. An infill drilling program will be conducted in this area to upgrade some of the inferred resources into indicated and measured resource status.

Thereafter, exploration drilling will continue over an additional 1.45 kilometres from Bawone to South of Salurang village following the continuation of this geochemical anomaly. Once the initial exploration drilling in this area has been completed, the identified resources will then be infill drilled to bring some of these resources into indicated and measured status as well.

Terry Filbert, Chairman and CEO of Baru Gold, commented, "With a pre-feasibility in progress and mine construction commencing soon, the Company's activities will ramp up now that we are moving past the latest wave of pandemic and administration delays. This drilling program plan will prove up and add ounces, and exploration upside, to the Sangihe area which has only seen 10% of the land package of 42,000 hectares explored and sampled with modern techniques."

Note: The Company cautions readers that the any production decision made by the Company will not be based on a NI 43-101 feasibility study of mineral reserves that demonstrates economic and technical viability and as such, there may be involved increased uncertainty and various technological and economic risks such as the interpretation of drill results; the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with our expectations; commodity and currency price fluctuation; failure to obtain adequate financing; regulatory, recovery rates, refinery costs, and other relevant conversion factors, permitting and licensing risks; general market and mining exploration risks and production and economic risks related to design and engineering, manufacturing, technological processes and test procedures and the risk that the project's output will not be salable at a price that will cover the project's operating and maintenance costs.

ABOUT SANGIHE GOLD PROJECT

The Sangihe Gold Project ("Sangihe") is located on the Indonesian island of Sangihe, off the northern coast of Sulawesi. Sangihe has an existing National Instrument 43-101 inferred mineral resource of 114,700 indicated and 105,000 inferred ounces of gold, as reported in the Company's "Independent Technical Report on the Mineral Resource Estimates of the Binebase and Bawone Deposits, Sangihe Project, North Sulawesi, Indonesia" (May 30, 2017). Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. The Company intends to proceed to production without the benefit of first establishing mineral reserves supported by a feasibility study.

The Company's 70-percent interest in the Sangihe-mineral-tenement Contract of Work ("CoW") is held through PT. Tambang Mas Sangihe ("TMS"). The remaining 30-percent interest in TMS is held by three Indonesian corporations. The term of the Sangihe CoW agreement is 30 years upon commencement of the production phase of the project.

Baru has met all the requirements of the Indonesian government and has been granted its environmental permit. The Company has received approval for the upgrade of its licence to advance the Sangihe project to construction and production in late 2021/early 2022.

ABOUT BARU GOLD CORP.

Baru Gold Corp. is a dynamic junior gold developer with NI 43-101 gold resources in Indonesia, one of the top ten gold producing countries in the world. Based in Indonesia and North America, Baru's team of mining and finance professionals boasts extensive experience in starting and operating small-scale gold and coal assets. With sufficient funds and strong retail and institutional shareholder support, Baru is positioned to become Indonesia's next gold producer.

Qualified Person

Frank Rocca, BAppSc.(Geology), MAusIMM, MAIG, Chief Geologist of Baru Gold Corp. is the Qualified Person as defined under NI 43-101 who has reviewed and approves the content of this release.

Baru Gold Corp.

Per: "Terry Filbert"

Terry Filbert, Director
President & CEO

info@barugold.com
+1-206-890-8285

For investor contacts more information, please contact:

Kevin Shum

Investor Relations

kevin@jeminicapital.com
647-725-3888 ext 702

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Certain statements in this News Release, which are not historical in nature, constitute "forward looking statements" within the meaning of that phrase under applicable Canadian securities law. These statements include, but are not limited to, statements or information concerning future work programs, results and timing of any work programs, the Company's performance, or events as of the date hereof. These statements reflect management's current assumptions and expectations and by their nature are subject to certain underlying assumptions, known and unknown risks and uncertainties and other factors which may cause actual results, performance, or events to be materially different from those expressed or implied by such forward looking statements. Those risks include the interpretation of drill results; the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with our expectations; commodity and currency price fluctuation; failure to obtain adequate financing; regulatory, recovery rates, refinery costs, and other relevant conversion factors, permitting and licensing risks; general market and mining exploration risks and production and economic risks related to design and engineering, manufacturing, technological processes and test procedures and the risk that the project's output will not be salable at a price that will cover the project's operating and maintenance costs. Forward-looking statements should not be construed as investment advice. Readers should perform a detailed, independent investigation and analysis of the Company and are encouraged to seek independent professional advice before making any investment decision. Accordingly, readers should not place undue reliance on any forward-looking statement. Except as required by applicable securities laws, the Company disclaims any obligation to update or revise any forward-looking statements to reflect events or changes in circumstances that occur after the date hereof.

Copyright (c) 2021 TheNewswire - All rights reserved.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Baru Gold Corp.
Bergbau
A2QFCL
CA06968L1004
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.