• Freitag, 15 November 2024
  • 05:48 Uhr Frankfurt
  • 04:48 Uhr London
  • 23:48 Uhr New York
  • 23:48 Uhr Toronto
  • 20:48 Uhr Vancouver
  • 15:48 Uhr Sydney

Rupert Resources Drills 27g/t Gold Over 3.9m and 13.1g/t Gold Over 7m at the Pahtavaara Mine

21.05.2020  |  Business Wire

Rupert Resources Ltd. (“Rupert” or “the Company”) reports results from ongoing exploration activities at the 100% owned Pahtavaara Project in the Central Lapland Greenstone Belt, Finland.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20200521005372/en/

Figure 1: Plan view showing new results and location of T-Vein and East Vein zones (Photo: Business Wire)

The Company has completed 8,858m of exploration drilling at the Pahtavaara Mine, since October 2019, successfully defining multiple new high grade gold intersections outside of the current known resource, in areas of limited historic drilling and in close proximity to the existing open pits and underground infrastructure.

Highlights

T-Vein and East Vein lie to the south of main trend targeted by prior operators in a relatively underexplored area of the Pahtavaara mine. The strike length of this structure is 600m and potentially links to the Karoliina zones in the west.

  1. Hole 120501 intersected 15g/t over 1.7m from 55m (including 20.2g/t over 1m and 7.5g/t over 0.7m) and 9.7g/t over 4m from 85m (including 33g/t over 1m) representing the up-dip extension of two zones at the westward end of the T-Vein structure.
  2. Holes 120332, 120342 and 120350, drilled from underground, intersected 5.9g/t over 5m (including 25.6g/t over 1m) and 27g/t over 3.9m (including 51.3g/t over 2m) and 9.3g/t over 4.0m (including 34.5g/t over 1m) respectively. These define up-plunge extensions up to 80m eastward of known T-Vein mineralisation at vertical depth of 250m below surface.
  3. Holes 220022, 220026 and 220027 intersected 13.1g/t over 7m from 27m (including 21.4 g/t over 4m), 28.2g/t over 1m from 28m and 17g/t over 2m from surface (including 33.4g/t over 1m) respectively. These shallow holes drilled at the East Vein structure confirm historic intercepts in the area and potential for further high-grade plunging shoots that may extend to depth.

James Withall, CEO of Rupert Resources commented “The exploration at the mine since late 2019 demonstrates the effectiveness of systematic drill targeting based on our new geological model at the mine. The results show continuity of the gold mineralisation, define extensions to surface and very high-grade intersections compared to previous mining and resource statements. This drilling will contribute to an updated resource in the coming months. More importantly, it has provided the geological confidence to step out drilling further to explore potential extensions to the known deposit.”

Summary

The 2019/20 exploration program at the Pahtavaara mine has intersected some of the highest grades drilled since the acquisition in 2016. Figure 1 shows a plan view of the mine with highlights from this recent drilling program including the new T-Vein and East Vein zones (see also Figure 2). Table 1 shows a summary of the intercepts that exceed 20g/t and Table 2 shows all the significant intercepts since the last release on mine exploration dated January 16th, 2020. Also included in today’s release is an intersection of 10.8g/t over 4m from surface in the NFE zone.

Recent drilling has focussed on stepping out around historic high-grade intercepts at the margins of the mined deposit. Near-surface has been drilled using reverse circulation (RC) with deeper holes and all underground drilling using diamond drilling. Re-interpretation of geology has indicated targets in brittle fracture zones at lithological contacts and fold axes, and modelling of these zones has permitted systematic drill testing along strike and down plunge to expand the mineralised footprint.

Results to the date of this release will now be used for the preparation of an updated NI 43-101 resource statement that is expected to be completed by the end of the 3rd calendar quarter of 2020. Further drilling is planned in the coming months to explore potential extensions to the deposit and results will be released as they become available.

Table 1. Ranked intercepts from all 2019/20 drilling at the Pahtavaara mine (new results in bold)

Hole ID

Zone

From (m)

To (m)

Interval (m)

Au (g/t)

119507

NFE

150.0

155.0

5.0

220.3

119507

incl.

150.0

152.0

2.0

550.0

119507

Incl.

151.0

152.0

1.0

935.0

119503

Harpoon

169.6

181.5

11.9

62.7

119503

incl.

177.0

178.0

1.0

8.5

119503

incl.

178.0

179.0

1.0

18.0

119503

incl.

180.0

181.5

1.5

468.0

119519

NFE

165.3

167.0

1.7

181.1

119519

incl.

165.3

166.0

0.7

438.0

120342

T-Vein

16.1

20.0

3.9

27.0

120342

incl.

16.1

18.0

2.0

51.3

220022

T-Vein

27.0

34.0

7.0

13.1

220022

incl.

29.0

33.0

4.0

21.4

119512

NFE

121.1

121.8

0.7

111.0

220008

NFE

29.0

31.0

2.0

26.1

220008

incl.

29.0

30.0

1.0

56.2

119519

NFE

82.4

93.6

11.2

4.3

220005

NFE

16.0

20.0

4.0

10.8

119519

incl.

84.0

85.3

1.3

10.1

119519

incl.

89.9

90.9

1.0

25.1

119503

Harpoon

83.0

86.0

3.0

13.8

119503

incl.

83.0

84.7

1.7

6.0

119503

incl.

84.7

86.0

1.3

24.1

120350

T-Vein

54.0

58.0

4.0

9.3

120350

incl.

54.0

55.0

1.0

34.5

120501

T-Vein

85.0

89.0

4.0

9.7

120501

incl.

85.0

86.0

1.0

33.1

220027

East Vein

3.0

5.0

2.0

17.0

220027

incl.

3.0

4.0

1.0

33.4

119503

Harpoon

69.0

75.0

6.0

5.6

119503

incl.

72.6

73.6

1.0

21.1

119503

incl.

73.6

75.0

1.4

8.1

120332

T-Vein

41.0

46.0

5.0

5.9

120332

incl.

45.0

46.0

1.0

25.6

220026

East Vein

28.0

39.0

1.0

28.2

120501

T-Vein

55.0

56.7

1.7

15.0

120501

incl.

55.0

56.0

1.0

20.2

120501

incl.

56.0

56.7

0.7

7.5

220022

East Vein

30.0

31.0

1.0

20.4

About the Pahtavaara Project

The project is located in the heart of the Central Lapland Greenstone Belt, northern Finland where the company owns the permitted Pahtavaara mine that is on active care & maintenance and 297km2. The company acquired the project for just USD2.5m in 2016 and is undertaking exploration both at the existing mine and across the region to demonstrate the potential for significant economic mineralisation.

The Pahtavaara Mine is an orogenic gold deposit hosted in an altered komatiitic sequence in the eastern part of the greenstone belt. Mineralisation is hosted by the predominantly pyroclastic, voluminous ultramafic volcanic rocks of the Sattasvaara komatiite complex (Savukoski group).

Mineralisation consists of structurally controlled sub-parallel lodes with steeply dipping ore shoots, comprising mostly free gold in quartz-dolomite vein stockwork. Mineralization is hosted predominantly by coarse-grained, non-schistose amphibole rocks with brittle dolomite ± quartz (± barite) veins, or biotite-talc (± chlorite) dominated schists with talc-carbonate ± pyrite ± magnetite veins, which are related to structural failure at the contact between the amphibolite rocks and the talc-chlorite schists. Coarse-grained amphibole dominated lithologies dip and plunge sub-vertically to the west-southwest within a wider, more diffuse, amphibole porphyroblast alteration domain which overprints the talc schists. Folding of the amphibole unit controls brittle fracture in hinges and associated gold mineralisation in places.

True widths cannot be determined in all circumstances from currently available information

Review by Qualified Person, Quality Control and Reports

Mr. Mike Sutton, P.Geo. Director and Dr Charlotte Seabrook, MAIG are the Qualified Persons as defined by National Instrument 43-101 responsible for the accuracy of scientific and technical information in this news release.

Samples are prepared by ALS Finland in Sodankylä and assayed in ALS laboratories in Ireland, Romania or Sweden. All samples are under watch from the drill site to the storage facility. Samples are assayed using fire assay method with aqua regia digest and analysis by AAS for gold. Over limit analysis for >10 ppm Au is conducted using fire assay and gravimetric finish. For multi-element assays Ultra Trace Level Method by HF-HNO3-HClO4 acid digestion, HCl leach and a combination of ICP-MS and ICP-AES is used. The Company’s QA/QC program includes the regular insertion of blanks and standards into the sample shipments, as well as instructions for duplication. Standards, blanks and duplicates are inserted at appropriate intervals. Approximately five percent (5%) of the pulps and rejects are sent for check assaying at a second lab.

Base of till samples are prepared in ALS Sodankylä by dry-sieving method prep-41, and assayed by fire assay with ICP-AES finish for gold. Multi-elements are assayed in ALS laboratories in either of Ireland, Romania or Sweden by aqua regia with ICP-MS finish. Rupert maintains a strict chain of custody procedure to manage the handling of all samples. The Company’s QA/QC program includes the regular insertion of blanks and standards into the sample shipments, as well as instructions for duplication.

About Rupert

Rupert is a Canadian based gold exploration and development company that is listed on the TSX Venture Exchange under the symbol “RUP”. The Company owns the Pahtavaara gold mine, mill, and exploration permits and concessions located in the Central Lapland Greenstone Belt in Northern Finland (“Pahtavaara”). Pahtavaara previously produced over 420koz of gold and 474koz remains in an Inferred mineral resource (4.6 Mt at a grade of 3.2 g/t Au at a 1.5 g/t Au cut-off grade, see the technical report entitled “NI 43-101 Technical Report: Pahtavaara Project, Finland” with an effective date of April 16, 2018, prepared by Brian Wolfe, Principal Consultant, International Resource Solutions Pty Ltd., an independent qualified person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects). The Company also holds a 100% interest in two properties in Central Finland - Hirsikangas and Osikonmaki; the Gold Centre property, which consists of mineral claims located in the Balmer Township, Red Lake, Ontario; and the Surf Inlet Property in British Columbia.

Web: http://rupertresources.com/

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements

This press release contains statements which, other than statements of historical fact constitute “forward-looking statements” within the meaning of applicable securities laws, including statements with respect to: results of exploration activities, mineral resources. The words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar expressions, as they relate to the Company, are intended to identify such forward-looking statements. Investors are cautioned that forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made, and are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the general risks of the mining industry, as well as those risk factors discussed or referred to in the Company's annual Management's Discussion and Analysis for the year ended February 28, 2019 available at www.sedar.com. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements except as otherwise required by applicable law.

Table 2. New intercepts from Pahtavaara mine 2019/2020 drilling.

Hole ID

Zone

From
(m)

To (m)

Interval
(m)

Au (g/t)

Estimated
true width %*

119522

NFE

114.0

115.0

1.0

3.0

Unknown

119523

NFE

18.0

19.0

1.0

1.0

85

119523

56.0

57.0

1.0

0.8

85

119524

NFE

68.0

69.3

1.3

1.2

85

220001

NFE

13.0

14.0

1.0

0.7

85

220001

74.0

75.0

1.0

1.4

85

220002

NFE

7.00

12.0

5.0

1.5

85

220002

31.0

32.0

1.0

1.5

85

220003

Harpoon

97.0

99.0

2.0

1.2

90

220004

Harpoon

82.0

83.0

1.0

3.8

90

220004

99.0

100.0

1.0

0.5

90

220005

NFE

11.0

12.0

1.0

2.2

90

220005

16.0

20.0

4.0

10.8

90

220005

23.0

30.0

7.0

1.9

85

220005

incl.

23.0

24.0

1.0

7.4

85

220008

NFE

5.0

6.0

1.0

0.7

85

220008

21.0

25.0

4.0

0.7

85

220008

29.0

31.0

2.0

26.1

85

220008

incl.

29.0

30.0

1.0

51.6

85

220009

21.0

22.0

1.0

0.5

85

220009

37.0

38.0

1.0

1.7

90

220010

NFE

6.00

7.00

1.0

0.6

90

220018

NFE

21.0

25.0

4.0

0.7

Unknown

220019

NFE

20.0

21.0

1.0

0.6

Unknown

220022

East Vein

20.0

24.0

4.0

3.2

Unknown

220022

incl.

21.0

22.0

1.0

6.7

Unknown

220022

27.0

34.0

7.0

13.1

Unknown

220022

incl.

29.0

33.0

4.0

21.4

Unknown

220023

East Vein

29.0

30.0

1.0

5.0

85

220025

East Vein

41.0

46.0

5.0

0.8

85

220026

East Vein

28.0

39.0

1.0

28.2

85

220027

East Vein

3.0

5.0

2.0

16.9

85

220027

incl.

3.0

4.0

1.0

33.4

85

220029

Karoliina

37.0

38.0

1.0

0.6

85

220029

49.0

55.0

6.0

0.9

85

220030

Karoliina

46.0

48.0

2.0

10.9

90

220030

incl.

46.0

47.0

1.0

19.3

90

220032

Karoliina

23.0

28.0

5.0

2.8

90

220032

incl.

26.0

27.0

1.0

10.3

90

220032

112.0

114.0

2.0

1.7

90

120304

Decline

14.0

15.4

1.4

2.0

Unknown

120309

Decline

18.0

19.0

1.0

2.1

Unknown

120311

Decline

0.2

1.1

0.9

2.8

Unknown

120311

8.5

9.5

1.0

0.7

Unknown

120316

T-Vein

23.7

24.6

0.9

0.7

95

120327

4.0

5.0

1.0

1.2

Unknown

120327

29.0

30.0

1.0

0.6

Unknown

120332

T-Vein

20.6

21.9

1.3

0.8

95

120332

27.6

28.3

0.7

0.5

95

120332

41.0

46.0

5.0

5.9

95

120332

incl.

45.0

46.0

1.0

25.6

95

120333

T-Vein

32.0

36.0

4.0

2.3

100

120333

incl.

35.0

36.0

1.0

6.0

100

120334

T-Vein

28.0

32.0

4.0

1.4

85

120334

47.0

49.0

2.0

1.4

85

120334

52.0

53.0

1.0

4.8

85

120341

T-Vein

7.40

8.70

1.30

0.6

95

120342

T-Vein

0.0

1.70

1.70

1.1

90

120342

16.1

20.0

3.9

27.0

90

120342

incl.

16.1

17.0

0.9

45.5

90

120342

incl.

17.0

18.0

1.0

61.6

90

120342

24.0

26.4

2.4

1.7

90

120343

Harpoon

37.0

38.0

1.0

9.8

50

120344

Gap

120.0

121.0

1.0

1.1

Unknown

120344

T-Vein

123.0

124.0

1.0

0.8

Unknown

120344

124.6

125.6

1.0

6.4

Unknown

120344

155.5

156.2

0.7

1.4

Unknown

120345

T-Vein

68.4

69.2

0.8

0.6

80

120346

T-Vein

22.0

28.0

6.0

1.3

75

120348

T-Vein

38.0

39.0

1.0

1.4

100

120348

51.5

52.5

1.0

5.2

100

120349

T-Vein

44.0

45.0

1.0

0.6

95

120349

49.0

55.0

6.0

1.4

95

120349

incl.

49.0

50.0

1.0

5.2

95

120349

62.0

63.3

1.3

0.5

95

120350

T-Vein

44.0

49.3

5.3

1.1

95

120350

54.0

58.0

4.0

9.3

95

120350

incl.

54.0

55.0

1.0

34.5

95

120350

87.3

88.0

0.7

1.3

95

120501

T-Vein

55.0

56.7

1.7

15.0

Unknown

120501

62.0

63.0

1.0

4.3

Unknown

120501

71.0

72.0

1.0

0.5

Unknown

120501

81.0

82.0

1.0

0.6

Unknown

120501

85.0

89.0

4.0

9.7

Unknown

120501

incl.

85.0

86.0

1.0

33.1

Unknown

120501

98.0

99.0

1.0

4.2

Unknown

120502

T-Vein

60.5

61.4

0.9

0.8

Unknown

Notes to table: A lower cut of 0.5g/tonne Au has been used for all intervals. No upper cut-off grade was applied. Maximum two metre interval of less than cut-off used for reporting. Unless specified, true widths cannot be accurately determined from the information available. NSI – 22006-007, 220011-017, 220020-021, 220024, 220028, 220031, 120301-303, 120305-308, 120310, 120312-317, 120325-326, 120335-37, 120347, 119520-521. *estimated true width as a percentage of downhole intercept

Table 3. Drill collar locations of drilling at Pahtavaara Mine since December 2019

Hole ID

Type

Zone

Easting

Northing

Elevation

Azimuth

Dip

EOH (m)

119522

DD

NFE

475009.3

7502010.5

252.3

33.74

-59.8

33.7

119523

DD

NFE

474976.1

7502034.3

251.8

32.34

-49.5

32.3

119524

DD

NFE

475184.2

7501880.3

249.7

34.6

-59.3

34.6

220001

RC

NFE

475115.7

7501966.8

253.8

29.2

-67.0

111

220002

RC

NFE

475153.1

7501951.6

254.8

30.0

-45.0

50

220003

RC

Harpoon

474748.7

7502090.9

248.6

169.5

-42.3

120

220004

RC

Harpoon

474733.2

7502088.1

249.1

172.0

-46.6

120

220005

RC

NFE

475230.2

7501956.1

260.7

30.0

-60.0

60

220006

RC

NFE

475233.3

7501970.3

262.4

30.0

-50.0

52

220007

RC

NFE

475239.5

7501977.3

264.3

30.0

-50.0

32

220008

RC

NFE

475206.3

7501963.9

259.3

33.0

-47.0

52

220009

RC

NFE

475251.2

7501961.3

263.0

30.0

-50.0

40

220010

RC

NFE

475256.0

7501969.7

265.3

30.0

-50.0

32

220011

RC

NFE

475226.6

7501999

265.6

32.7

-48.9

32

220012

RC

NFE

475303.9

7501972.4

270.4

39.2

-48.0

28

220013

RC

NFE

475296.9

7501957.8

269.4

30.5

-51.1

40

220014

RC

NFE

475282.1

7501935.3

263.8

39.0

-50.1

40

220015

RC

NFE

475319.1

7501917.8

267.6

29.3

-51.1

80

220016

RC

NFE

475175.5

7501949.0

255.1

24.8

-51.5

50

220017

RC

NFE

475166.8

7501977.0

257.9

27.2

-45.2

50

220018

RC

NFE

475144.5

7501999.0

260.1

29.9

-45.5

101

220019

RC

NFE

475122.2

7502000.0

258.3

36.1

-45.3

101

220020

RC

East Vein

475407.0

7501726.2

260.4

165.9

-46.8

28

220021

RC

East Vein

475404.2

7501736.5

260.8

165.0

-45.0

40

220022

RC

East Vein

475392.4

7501734.3

261.1

164.7

-46.1

40

220023

RC

East Vein

475315.0

7501753.7

251.9

148.0

-52.6

50

220024

RC

East Vein

475314.7

7501754.1

251.8

142.1

-69.4

92

220025

RC

East Vein

475333.1

7501769.0

254.5

156.1

-64.0

101

220026

RC

East Vein

475351.0

7501792.2

257.5

162.1

-44.8

62

220027

RC

East Vein

475357.8

7501766.0

256.6

165.2

-46.1

104

220028

RC

Karoliina

474225.6

7501614.2

250.9

177.1

-46.7

50

220029

RC

Karoliina

474245.7

7501640.5

250.3

179.6

-46.1

80

220030

RC

Karoliina

474377.1

7501709.1

251.6

177.6

-44.9

148

220031

RC

Karoliina

474377.0

7501686.5

250.3

180.8

-46.2

122

220032

RC

Karoliina

474357.9

7501694.5

250.8

183.4

-46.3

116

120301

UG DD

Decline

474910.0

7501893.0

-139.1

340.19

-0.2

42.1

120302

UG DD

Decline

474879.5

7501881.0

-142.4

169.37

-5.2

42.1

120303

UG DD

Decline

474879.5

7501881.0

-141.6

169.87

10.0

30.4

120304

UG DD

Decline

474879.3

7501881.0

-141.5

107.14

19.8

30.4

120305

UG DD

Decline

474867.8

7501871.0

-143.4

168.89

19.6

30.1

120306

UG DD

Decline

474867.7

7501871.0

-143.7

179.91

9.9

42.3

120309

UG DD

Decline

474914.3

7501890.0

-137.9

14.16

9.7

42.2

120310

UG DD

Decline

474914.2

7501890.0

-136.7

14.58

30.0

42.4

120311

UG DD

Decline

474910.0

7501893.0

-138.4

336.27

9.8

40.3

120312

UG DD

Decline

474922.2

7501868.0

-136.3

19.77

-0.1

51.4

120313

UG DD

Decline

474922.3

7501868.0

-136.7

20.05

-20.1

51.2

120314

UG DD

T-Vein

474977.7

7501648.0

-28.7

350.23

-30.2

42.2

120315

UG DD

T-Vein

474977.6

7501648.0

-28.7

348.46

-50.1

51.4

120316

UG DD

T-Vein

474977.9

7501647.0

-26.5

349.66

29.9

42.4

120317

UG DD

T-Vein

475048.6

7501744.0

-26.5

140.37

-30.0

90.3

120325

UG DD

Decline

474903.5

7501850.0

-133.5

70.53

-22.1

60.1

120326

UG DD

Decline

474906.9

7501853.0

-132.4

70.34

19.7

72.5

120327

UG DD

Decline

474868.3

7501879.0

-144.5

20.24

-20.1

50.8

120328

UG DD

Twin

474951.7

7501758.0

-59.9

165.56

9.7

14.6

120332

UG DD

T-Vein

474939.2

7501670.7

-0.3

169.8

-0.1

51.2

120333

UG DD

T-Vein

474939.2

7501670.8

-0.8

169.5

-20.0

51.2

120334

UG DD

T-Vein

474939.1

7501670.8

0.7

169.8

19.6

66.4

120335

UG DD

T-Vein

474939.0

7501671.0

-1.1

168.9

-50.3

60.3

120336

UG DD

T-Vein

475131.3

7501704.4

157.6

180.1

19.8

50.8

120337

UG DD

T-Vein

475131.5

7501704.2

156.0

180.2

39.5

50.8

120341

UG DD

T-Vein

475022.9

7501655.8

11.6

349.9

-4.7

51.3

120342

UG DD

T-Vein

475023.0

7501655.6

12.9

350.9

24.6

51.4

120343

UG DD

Harpoon

474783.8

7501985.0

113.6

215.0

35.0

50.7

120344

UG DD

Gap

474896.0

7501873.0

108.1

238.6

29.6

163.9

120345

UG DD

T-Zone

475156.2

7501753.4

79.7

161.1

-59.3

126.3

120346

UG DD

T-Zone

475097.8

7501695.5

90.1

162.3

-60.0

111.0

120347

UG DD

T-Zone

475022.7

7501676.5

69.4

169.2

-49.7

60.3

120348

UG DD

T-Zone

474936.7

7501681.2

27.3

170.2

-10.2

72.5

120349

UG DD

T-Zone

474936.6

7501681.2

28.5

170.8

14.6

90.1

120350

UG DD

T-Zone

474936.2

7501681.3

29.1

169.4

29.8

90.3

120351

UG DD

T-Zone

474975.8

7501681.0

19.5

170.3

-39.9

60.4

120501

DD

T-Vein

474804.2

7501606.9

246.6

262.8

-44.3

121.7

120502

DD

T-Vein

474816.7

7501589.8

246.2

265.2

-46.2

100.2

120503

DD

T-Vein

474842.9

7501588.0

245.9

263.8

-45.7

95.2

Notes to table: DD – Diamond drilling, UG – Underground, RC – Reverse Circulation



Contact

James Withall
Chief Executive Officer
jwithall@rupertresources.com

Thomas Credland Head of Corporate Development
tcredland@rupertresources.com

Rupert Resources Ltd.
82 Richmond Street East, Suite 203, Toronto, Ontario M5C 1P1
Tel: +1 416-304-9004


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Rupert Resources Ltd.
Bergbau
A0KFZ6
CA78165J1057
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.