Auriant Mining AB publishes 12m 2019 operational update
Tardan Operations and Production
During 2019, the Company’s main source of ore was the Pravoberezhniy deposit. Total stripping works amounted to 982 thousand m3. Ore mined amounted to 473 thousand tonnes with an average grade of 2.42 g/t (total gold in ore was 1,144 kg). In 2020, the Company will continue mining the Pravoberezhniy deposit. The Company will also undertake stripping works on Ore zone #3 and Ore body #26 of the Tardan deposit in order to secure access to ore on these ore bodies in 2021 and 2022.
Total 12m 2019 gold production was 635 kg (20,407 oz), an increase of 81% compared to 350 kg (11,267 oz) in 12m 2018. Heap leach ore stacking was 334 thousand tonnes with an average grade of 2.08 g/t. CIL ore processing started in November and amounted to 38 thousand tonnes with an average grade of 3.94 g/t. Heap leach operations were discontinued at the end of December.
Solcocon Production
In May 2019, alluvial production resumed at Solcocon. This production is 100% outsourced. In 2018, the Company engaged 2 contractors working on 2 placers, and the same contractors continued to work in 2019.
During 2019, the Company produced 54 kg (1,730 oz) of alluvial gold compared to 73 kg (2,337 oz) in the previous period.
Tardan CIL ramp up review
It was expected that the ramp up stage of the newly constructed CIL plant would take 2.5 months from inception. On November 18th, the Company began feeding high grade ore into the CIL plant, and it is expected to be fully ramped up by the end of January 2020.
Over the ramp up stage, the Company has been monitoring equipment operations, development of chemical processes, staff performance, materials and energy consumption, grades at all stages of processing, including residual grades in the tailings. Based on the results, the Company has upgraded the leaching tanks in order to improve ore oxidization to ensure stable processing results.
As a result of this work, the Company reached a stable projected processing capacity of 50 tonnes per working hour and projected gold recovery by the end of December.
In January 2020, the Company expects to process 31 thousand tonnes of ore and will continue to supply high grade ore to the CIL plant. Over last 10 days of January 2020, we will begin mixing high and low grade ore to ensure steady transition to year round average grades. It is expected that in January production will amount to 115 kg of gold.
Increase in wire electric power supply
Over the course of the ramp up, the CIL plant has demonstrated better than projected energy efficiency per tonne of processed ore.
In December 2019, the Company agreed a new energy deal to increase the power allocated to the Tardan CIL plant using a newly built 35kV power line from 2.0 MWt to 2.5 MWt. Coupled with better than expected energy efficiency, it will allow us to minimize the use of diesel generators or to cease their use entirely.
Production
Production unit | 12m 2019 | 12m 2018 | Change | ||||
kg | oz | kg | oz | kg | oz | % | |
Hard rock | |||||||
Tardan (heap leach) | 525 | 16,867 | 350 | 11,267 | 174 | 5,600 | 50% |
Tardan (CIL) | 110 | 3,540 | 0.0 | 0 | 110 | 3,540 | 100% |
Alluvial | |||||||
Solcocon | 54 | 1,730 | 73 | 2,337 | (19) | (608) | -26% |
Total gold produced | 689 | 22,137 | 423 | 13,604 | 265 | 8,532 | 63% |
Tardan
unit. | 12m 2019 | 12m 2018 | Change | ||
Mining | |||||
Waste stripping | 000 m3 | 982 | 358 | 625 | 175% |
Ore mined | 000 tonnes | 473 | 219 | 254 | 116% |
Average grade | g/t | 2.42 | 2.58 | (0.16) | -6% |
Heap leach | |||||
Ore stacking | 000 tonnes | 334 | 214 | 120 | 56% |
Grade | g/t | 2.08 | 2.59 | (0.51) | -20% |
Gold in ore stacked | kg | 694 | 554 | 140 | 25% |
Gold produced HL | kg | 525 | 350 | 174 | 50% |
CIL | |||||
Ore processing | 000 tonnes | 38 | - | - | - |
Grade | g/t | 3.94 | - | - | - |
Gold in ore | kg | 151 | - | - | - |
Gold produced CIL | kg | 110 | - | - | - |
Gold produced total | kg | 635 | 350 | 284 | 81% |
Warehouse on December 31 | |||||
Ore | 000 tonnes | 108 | 5 | 103 | 2055% |
Grade | g/t | 2.90 | 2.29 | 0.61 | 27% |
For more information, please contact:
Sergey Ustimenko, CEO Tel: +7 495 109 02 82
E-mail: sergey.ustimenko@auriant.com
Company name: Auriant Mining AB Short name: AUR
ISIN-code: SE0001337213
Website: www.auriant.com
www.facebook.com/AuriantMining/
Auriant Mining AB (AUR) is a Swedish junior mining company focused on gold exploration and production in Russia, primarily in Zabaikalye and the Republics of Khakassia and Tyva. The company has currently four assets, including two operating mines (Tardan and Solcocon), one early stage exploration asset and one development asset.
Since July 19, 2010, Auriant Mining´s shares are traded on Nasdaq First North Premier Growth Market under the short name AUR. For more information please visit www.auriant.com. Mangold Fondkommission is Certified Adviser to Auriant, for more information please call +46 8 503 015 50, e-mail CA@mangold.se or visit www.mangold.se.
This information is information that Auriant Mining AB is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact persons set out above, at 9.00 CET on January 20th, 2020.
Cautionary Statement: Statements and assumptions made in this report with respect to Auriant Mining AB’s (“AUR”) current plans, estimates, strategies and beliefs, and other statements that are not historical facts, are forward-looking statements about the future performance of AUR. Forward-looking statements include, but are not limited to, those using words such as "may", "might", "seeks", "expects", "anticipates", "estimates", "believes", "projects", "plans", strategy", "forecast" and similar expressions. These statements reflect management's expectations and assumptions in light of currently available information. They are subject to a number of risks and uncertainties, including, but not limited to, (i) changes in the economic, regulatory and political environments in the countries where AUR operates; (ii) changes relating to the geological information available in respect of the various projects undertaken; (iii) AUR’s continued ability to secure enough financing to carry on its operations as a going concern; (iv) the success of its potential joint ventures and alliances, if any; (v) exchange rates, particularly between the Russian rouble and the U.S. dollar. In the light of the many risks and uncertainties surrounding any gold production and exploration company at an early stage of its development, the actual results could differ materially from those presented and forecast in this report. AUR assumes no unconditional obligation to immediately update any such statements and/or forecasts. This press release shall not, directly or indirectly, be released, published or distributed in or to the United States, Australia Japan, Canada, New Zealand, Hong Kong, South Africa or other country where such action as a whole or in part is subject to legal restrictions. Nothing in this press release should be considered as an offer to invest or otherwise trade in shares of Auriant Mining AB (publ). The proposed issue will not be directed at residents or those living in the United States, Australia, Japan, Canada, New Zealand, Hong Kong, South Africa or other country where such action would require further prospectus, other offering documentation, registration or other measures beyond those required by Swedish law. No securities will be registered under the United States Securities Act of 1933, a similar law in any state in the United States, or under any provincial law in Canada, nor under the applicable law of another country.