Auriant Mining AB publishes 12m 2019 operational update

20.01.2020  |  Globenewswire Europe

Tardan Operations and Production

During 2019, the Company’s main source of ore was the Pravoberezhniy deposit. Total stripping works amounted to 982 thousand m3. Ore mined amounted to 473 thousand tonnes with an average grade of 2.42 g/t (total gold in ore was 1,144 kg). In 2020, the Company will continue mining the Pravoberezhniy deposit. The Company will also undertake stripping works on Ore zone #3 and Ore body #26 of the Tardan deposit in order to secure access to ore on these ore bodies in 2021 and 2022.

Total 12m 2019 gold production was 635 kg (20,407 oz), an increase of 81% compared to 350 kg (11,267 oz) in 12m 2018. Heap leach ore stacking was 334 thousand tonnes with an average grade of 2.08 g/t. CIL ore processing started in November and amounted to 38 thousand tonnes with an average grade of 3.94 g/t. Heap leach operations were discontinued at the end of December.

Solcocon Production

In May 2019, alluvial production resumed at Solcocon. This production is 100% outsourced. In 2018, the Company engaged 2 contractors working on 2 placers, and the same contractors continued to work in 2019.

During 2019, the Company produced 54 kg (1,730 oz) of alluvial gold compared to 73 kg (2,337 oz) in the previous period.

Tardan CIL ramp up review

It was expected that the ramp up stage of the newly constructed CIL plant would take 2.5 months from inception. On November 18th, the Company began feeding high grade ore into the CIL plant, and it is expected to be fully ramped up by the end of January 2020.
Over the ramp up stage, the Company has been monitoring equipment operations, development of chemical processes, staff performance, materials and energy consumption, grades at all stages of processing, including residual grades in the tailings. Based on the results, the Company has upgraded the leaching tanks in order to improve ore oxidization to ensure stable processing results.
As a result of this work, the Company reached a stable projected processing capacity of 50 tonnes per working hour and projected gold recovery by the end of December.
In January 2020, the Company expects to process 31 thousand tonnes of ore and will continue to supply high grade ore to the CIL plant. Over last 10 days of January 2020, we will begin mixing high and low grade ore to ensure steady transition to year round average grades. It is expected that in January production will amount to 115 kg of gold.

Increase in wire electric power supply

Over the course of the ramp up, the CIL plant has demonstrated better than projected energy efficiency per tonne of processed ore.

In December 2019, the Company agreed a new energy deal to increase the power allocated to the Tardan CIL plant using a newly built 35kV power line from 2.0 MWt to 2.5 MWt. Coupled with better than expected energy efficiency, it will allow us to minimize the use of diesel generators or to cease their use entirely.

Production

Production unit 12m 2019 12m 2018 Change
kg oz kg oz kg oz %
Hard rock
Tardan (heap leach) 525 16,867 350 11,267 174 5,600 50%
Tardan (CIL) 110 3,540 0.0 0 110 3,540 100%
Alluvial
Solcocon 54 1,730 73 2,337 (19) (608) -26%
Total gold produced 689 22,137 423 13,604 265 8,532 63%

Tardan

unit. 12m 2019 12m 2018 Change
Mining
Waste stripping 000 m3 982 358 625 175%
Ore mined 000 tonnes 473 219 254 116%
Average grade g/t 2.42 2.58 (0.16) -6%
Heap leach
Ore stacking 000 tonnes 334 214 120 56%
Grade g/t 2.08 2.59 (0.51) -20%
Gold in ore stacked kg 694 554 140 25%
Gold produced HL kg 525 350 174 50%
CIL
Ore processing 000 tonnes 38 - - -
Grade g/t 3.94 - - -
Gold in ore kg 151 - - -
Gold produced CIL kg 110 - - -
Gold produced total kg 635 350 284 81%
Warehouse on December 31
Ore 000 tonnes 108 5 103 2055%
Grade g/t 2.90 2.29 0.61 27%

For more information, please contact:

Sergey Ustimenko, CEO Tel: +7 495 109 02 82
E-mail: sergey.ustimenko@auriant.com

Company name: Auriant Mining AB Short name: AUR
ISIN-code: SE0001337213

Website: www.auriant.com
www.facebook.com/AuriantMining/

Auriant Mining AB (AUR) is a Swedish junior mining company focused on gold exploration and production in Russia, primarily in Zabaikalye and the Republics of Khakassia and Tyva. The company has currently four assets, including two operating mines (Tardan and Solcocon), one early stage exploration asset and one development asset.

Since July 19, 2010, Auriant Mining´s shares are traded on Nasdaq First North Premier Growth Market under the short name AUR. For more information please visit www.auriant.com. Mangold Fondkommission is Certified Adviser to Auriant, for more information please call +46 8 503 015 50, e-mail CA@mangold.se or visit www.mangold.se.

This information is information that Auriant Mining AB is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact persons set out above, at 9.00 CET on January 20th, 2020.

Cautionary Statement: Statements and assumptions made in this report with respect to Auriant Mining AB’s (“AUR”) current plans, estimates, strategies and beliefs, and other statements that are not historical facts, are forward-looking statements about the future performance of AUR. Forward-looking statements include, but are not limited to, those using words such as "may", "might", "seeks", "expects", "anticipates", "estimates", "believes", "projects", "plans", strategy", "forecast" and similar expressions. These statements reflect management's expectations and assumptions in light of currently available information. They are subject to a number of risks and uncertainties, including, but not limited to, (i) changes in the economic, regulatory and political environments in the countries where AUR operates; (ii) changes relating to the geological information available in respect of the various projects undertaken; (iii) AUR’s continued ability to secure enough financing to carry on its operations as a going concern; (iv) the success of its potential joint ventures and alliances, if any; (v) exchange rates, particularly between the Russian rouble and the U.S. dollar. In the light of the many risks and uncertainties surrounding any gold production and exploration company at an early stage of its development, the actual results could differ materially from those presented and forecast in this report. AUR assumes no unconditional obligation to immediately update any such statements and/or forecasts. This press release shall not, directly or indirectly, be released, published or distributed in or to the United States, Australia Japan, Canada, New Zealand, Hong Kong, South Africa or other country where such action as a whole or in part is subject to legal restrictions. Nothing in this press release should be considered as an offer to invest or otherwise trade in shares of Auriant Mining AB (publ). The proposed issue will not be directed at residents or those living in the United States, Australia, Japan, Canada, New Zealand, Hong Kong, South Africa or other country where such action would require further prospectus, other offering documentation, registration or other measures beyond those required by Swedish law. No securities will be registered under the United States Securities Act of 1933, a similar law in any state in the United States, or under any provincial law in Canada, nor under the applicable law of another country.

Attachment

  • Q4_2019_Press release (Operational)_ENG

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Auriant Mining AB
Bergbau
A0EACA
SE0001337213
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.