• Freitag, 15 November 2024
  • 12:33 Uhr Frankfurt
  • 11:33 Uhr London
  • 06:33 Uhr New York
  • 06:33 Uhr Toronto
  • 03:33 Uhr Vancouver
  • 22:33 Uhr Sydney

Great Panther Announces High Grade Drilling Results from Exploration Program at the Tucano Gold Mine

30.07.2019  |  CNW

This news release constitutes a "designated news release" for the purposes of Great Panther's prospectus supplement dated July 9, 2019 to its short form base shelf prospectus dated July 2, 2019.

TSX: GPR  |  NYSE American: GPL

VANCOUVER, July 30, 2019 - Great Panther Mining Ltd. (TSX: GPR; NYSE American: GPL) ("Great Panther", the "Company") reports that the first results from in-mine exploration since the Company acquired the Tucano Gold Mine on March 5, 2019 are returning high gold grades over notable widths below the existing TAP AB3 ("AB3") open pit.  Results from 10 of the first 12 holes have returned intersections such as 15.35 g/t Au over 13.55 metres, including 30.94 g/t Au over 5.35 metres, in hole 19TABDD001; and 13.00 g/t Au over 25.50 metres, including 63.40 g/t Au over 5.00 metres, in hole 19TABDD010.  A summary table of drill results (uncut, undiluted) is presented below and plan maps and sections can be found on the Company website here.

Highlights of Mineralized Intervals From TAP-AB3 2019 Exploration Drill Holes

Hole ID

From

To

Interval*

Au (g/t)

Pit Outline

19TABDD001

127.00

140.55

13.55

15.352

Within Pit Outline

Incl: 127.65

133.00

5.35

30.940

Within Pit Outline

153.00

167.00

14.00

3.143

Outside Pit Outline

19TABDD002

127.65

134.00

6.35

3.461

Within Pit Outline

143.00

155.09

12.09

3.238

Within Pit Outline

19TABDD003

36.00

39.00

3.00

3.400

Within Pit Outline

97.00

109.00

12.00

3.045

Outside Pit Outline

19TABDD004

139.60

150.60

11.00

3.719

Within Pit Outline

19TABDD005

153.00

159.00

6.00

5.453

Outside Pit Outline

19TABDD007

108.40

116.00

7.60

4.741

Within Pit Outline

124.00

146.00

22.00

7.680

Within Pit Outline

19TABDD008

142.00

154.00

12.00

2.366

Within Pit Outline

19TABDD009

104.00

158.00

54.00

2.697

Within Pit Outline

19TABDD010

129.00

154.50

25.50

13.000

Within Pit Outline

Incl: 130.00

135.00

5.00

63.398

Within Pit Outline

*

Drill holes crossing subvertical ore lodes at dip angle 50-60°. True width is estimated at 70 to 95% of drilled interval. Results for drills holes 19TABDD006 and 19TABDD012 are pending.  Drill hole 19TABDD0011 was unmineralized.

 

"These first results from the in-mine drilling are highly encouraging and are the first step in unlocking the potential that we see at Tucano," stated Jim Bannantine, President & CEO.  "We have already made significant operational improvements and gold production is increasing.  Exploration of Tucano is a key focus for Great Panther with the objective of increasing the mine life and ultimately enhancing the economics and with the goal of returning significant value for our shareholders."

Tucano's in-mine exploration program (the "In-mine Program") is prioritized on infill drilling below the AB3 and Urucum pits where mineralized zones have demonstrated high potential for depth extension.  These high-grade results from AB3 will add more confidence to the mineral resource estimates and are expected to increase the life of mine of the final pit.  The drilling at AB3 covered a strike length of approximately 350 metres and has locally extended the mineralized zones by more than 100 metres below the existing pit.  Significantly, some of these intersections are below the final pit outline and indicate the potential for an underground resource at AB3.  At Urucum, a prefeasibility study has already been completed on an underground mining scenario below the existing pit.

The In-mine Program contemplates approximately 7,450 metres in 36 holes from two rigs.  To date a total of 12 holes totaling approximately 2,400 metres have been drilled.  The In-mine Program is designed to convert Inferred Resources to Measured & Indicated, while an additional medium-term program will test other near-mine targets.  A further regional exploration program is in the planning stages and will focus on regional exploration of the extensive land package surrounding the Tucano Gold Mine.

The Tucano Gold Mine is located in the Guyana Shield, which was once connected to West Africa and contains many world-class deposits.  Tucano belongs to the sub-category of greenstone-hosted gold deposits known as Iron Formation Hosted Gold Deposits, which includes notable mines such as the historic Homestake Mine, South Dakota (44 million gold ounces produced) and the Musselwhite Mine, northern Ontario (>7 million gold ounces in past production and reserves).

Sample Preparation, Analysis and Security

Drill cores were sampled and logged on-site, then shipped to the independent SGS-Geosol lab in Vespasiano, near Belo Horizonte (Brazil) for preparation and analyzed for gold using a 30-gram sub-sample and fire assay with AAS finish (FAA313 method).  Over-limit samples, 100 g/t gold, are re-analyzed for gold using a 30-gram sub-sample and fire assay with gravimetric finish (FAG323 method).  Control samples, comprising 14% of the sample shipment include standards (5%), lab duplicates (5%), field duplicates (2.5%), and blanks (1.5%).  Drill program design, Quality Assurance/Quality Control ("QA/QC") and interpretation of results were performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. 

Qualified Persons

The foregoing technical information contained in this new release has been reviewed and approved by Fernando A. Cornejo, P.Eng., Vice-President Projects & Technical Services and Marcelo Batelochi, Director Exploration Brazil, both Qualified Persons (QPs) for the purpose of National Instrument 43-101.

ABOUT GREAT PANTHER

Great Panther Mining Ltd. is an intermediate gold and silver mining and exploration company listed on the Toronto Stock Exchange trading under the symbol GPR, and on the NYSE American under the symbol GPL.  Great Panther operates three mines including the Tucano Gold Mine in Amapá State, Brazil, and two primary silver mines in Mexico: the Guanajuato Mine Complex and the Topia Mine.  Great Panther also owns the Coricancha Mine in Peru, which is expected to restart operations in 2020.

CAUTIONARY STATEMENT ON FORWARD-LOOKING STATEMENTS

This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of Canadian securities laws (together, "forward-looking statements").  Such forward-looking statements include, but are not limited to, statements with respect the significance of the results of the drill program, the intent of the drill program to convert resources, increase mine life, and improve economics at Tucano, and future plans for in mine and regional exploration at the Tucano Gold Mine, and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward-looking statements to be materially different. 

These forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements expressed or implied by such forward-looking statements to be materially different.  Such factors include, among others, risks and uncertainties relating to potential political and social risks involving Great Panther's operations in a foreign jurisdiction, the potential for unexpected costs and expenses, fluctuations in metal prices, fluctuations in currency exchange rates, physical risks inherent in mining operations, operating or technical difficulties in mineral exploration, changes in project parameters as plans continue to be refined, the Company having sufficient funds to undertake exploration programs, and other risks and uncertainties, including those described in respect of Great Panther, in its annual information form for the year ended December 31, 2018 and material change reports filed with the Canadian Securities Administrators available at www.sedar.com and reports on Form 40-F and Form 6-K filed with the Securities and Exchange Commission and available at www.sec.gov.

There is no assurance that such forward looking statements will prove accurate; results may vary materially from such forward-looking statements; and there is no assurance that the Company will be able to identify and acquire additional projects or that any projects acquired will be successfully developed.  Readers are cautioned not to place undue reliance on forward looking statements.  The Company has no intention to update forward looking statements except as required by law.

View original content to download multimedia:http://www.prnewswire.com/news-releases/great-panther-announces-high-grade-drilling-results-from-exploration-program-at-the-tucano-gold-mine-300893042.html

SOURCE Great Panther Mining Ltd.



Contact
Alex Heath, CFA, Director, Corporate Development & Investor Relations, Toll free: 1 888 355 1766, Tel: +1 604 638 8956, aheath@greatpanther.com, www.greatpanther.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Great Panther Mining Ltd.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.