• Freitag, 15 November 2024
  • 19:56 Uhr Frankfurt
  • 18:56 Uhr London
  • 13:56 Uhr New York
  • 13:56 Uhr Toronto
  • 10:56 Uhr Vancouver
  • 05:56 Uhr Sydney

Monarch Gold Intersects 17.26 g/t Au Over 1.95 Metres, Including 50.10 g/t Au Over 0.6 Metres, at its Croinor Gold Project

04.02.2019  |  CNW
  • 2018 drilling program increases the size of the Croinor Gold deposit, which remains open in all directions

  • Highlights from the additional 6,645-metre diamond drill program:
    • Hole CR-18-685: 17.26 g/t Au over 1.95 metres, incl. 50.10 g/t Au over 0.60 metres
    • Hole CR-18-676: 10.33 g/t Au over 1.75 metres, incl. 25.40 g/t Au over 0.65 metres
    • Hole CR-18-678: 40.50 g/t Au over 1.00 metre
    • Hole CR-18-683: 23.61 g/t Au over 1.60 metres, incl. 43.70 g/t Au over 0.65 metres

MONTREAL, Feb. 4, 2019 -  MONARCH GOLD CORPORATION ("Monarch" or the "Corporation") (TSX: MQR) (OTCMKTS: MRQRF) (FRANKFURT: MR7) is pleased to report the last assay results from the 2018 diamond drill program at its wholly owned Croinor Gold project, 50 kilometres east of Val-d'Or, Québec.

"The 2018 diamond drilling program on the Croinor Gold property was a major success, as it enabled us to increase the size and gold content of the planned stopes, confirm and expand the two underground bulk sampling areas, extend the deposit to the east and west and at depth and establish that the deposit is still open in all directions," said Jean-Marc Lacoste, President and Chief Executive Officer of Monarch. "The next phase will focus on upgrading the deposit through infill drilling and drilling pure exploration holes to test high-potential targets on our 151-km2 property."  

The initial 20,000-metre program started in March 2018 and focused on expanding and upgrading the Croinor Gold deposit. The program was completed in early September, with a total of 19,935 metres of core drilled in 89 holes. Given the positive results from that drilling program, the Corporation decided to drill another 8,300 metres, and managed to complete 6,645 metres in 18 holes before the winter freeze (see longitudinal). All the assays for the original program and the additional 6,645 metres of drilling have been received (see table below and press releases dated July 10, 2018, September 5, 2018, October 4, 2018 and January 15, 2019, for a compilation of the 2018 drill results).

Hole CR-18-685 returned 17.26 g/t Au over 1.95 metres, including 50.10 g/t Au over 0.6 metre, 315 metres below surface. This hole was drilled 30 metres west of hole CR-18-676, and is 30 metres down dip from hole CR-11-407 and 45 metres up dip and to the east of hole CR-15-441. The two nearby historical holes combined with these two new holes will create a new stope in the western part of the deposit, extending the mineralization westward while keeping the deposit open to the west. The closest stope to these holes is 125 metres to the east.

Hole CR-18-676 returned 10.33 g/t Au over 1.75 metres, including 25.40 g/t Au over 0.65 metres. It was drilled to follow up on hole CR-18-583, drilled during the initial drilling program 20 metres west of hole CR-18-676 and 30 metres east of hole CR-18-685. CR-18-676 was drilled down dip, parallel to the host diorite, and intersected multiple mineralized zones within the diorite, as shown in the table below.

Hole CR-18-678 returned 40.50 g/t Au over 1.00 metre. It is located 20 metres west from a planned stope, 250 metres below surface and 25 metres west of hole CR-18-672, another hole added based on the positive results from the initial program.

Finally, hole CR-18-683 returned 23.61 g/t Au over 1.60 metres, including 43.70 g/t Au over 0.65 metres. It is located 8 metres west of a planned stope, thereby increasing the stope's size and gold content.

Results from the additional 6,645 metres of drilling on Croinor Gold








Hole

Length

From

To

Width*

Grade

Area

Number

(m)

(m)

(m)

(m)

(g/t Au)

Targeted

CR-18-672

340

239.3

240.0

0.7

5.17

Deposit



251.4

252.0

0.6

9.37




261.6

263.6

2.0

11.24


Including


261.6

262.6

1.0

22.00


CR-18-673

424

264.7

266.7

2.0

10.46

Deposit

Including


264.7

265.7

1.0

19.25




273.0

273.7

0.7

9.67




305.8

306.3

0.5

9.31


CR-18-674

319

298.5

299.6

1.1

1.72

Deposit

CR-18-675

319

260.6

261.6

1.0

10.15

Deposit

CR-18-676**

751

27.4

30.25

2.85

2.20

Deposit



55.75

58.5

2.75

7.46


Including


55.75

56.3

0.55

10.75


Including


58.0

58.5

0.5

12.30




62.5

64.1

1.6

6.01


Including


63.6

64.1

0.5

11.15




76.3

76.8

0.5

5.78




84.7

85.3

0.6

22.20




255.6

256.1

0.5

8.47




274.95

278.9

1.8

6.12


Including


274.95

275.55

0.6

11.85




286.6

288.2

1.6

3.80




298.0

298.5

0.5

5.82




300.75

301.35

0.6

11.25




368.1

369.85

1.75

10.33


Including


368.6

369.25

0.65

25.40




374.15

377.0

2.85

7.64


Including


376.0

376.5

0.5

16.25




378.2

379.4

1.2

4.38


CR-18-678

325

265.5

268.4

2.9

15.07

Deposit

Including


266.4

267.4

1.0

40.50


CR-18-679

400

252.2

254.8

2.6

3.17

Deposit

CR-18-680

280

181.5

182.6

1.1

2.36

Deposit

CR-18-681

352

214.2

216.2

2.0

6.26

Deposit

Including


215.2

216.2

1.0

10.55




255.8

256.3

0.5

5.29


CR-18-683

301

216.15

217.85

1.6

23.61

Deposit

Including


216.15

216.8

0.65

43.70


Including


217.35

217.85

0.5

18.70




233.15

234.2

1.05

9.43


Including


233.65

234.2

0.55

14.00


CR-18-684

502

374.1

375.15

1.05

1.21

Deposit

CR-18-685

352

257.0

258.95

1.95

17.26

Deposit

Including


258.35

258.95

0.6

50.10


CR-18-686

460

360.0

361.0

1.0

2.07

Deposit

CR-18-687

400

318.6

320.6

2.0

1.98

Deposit

CR-18-690

352

298.7

299.2

0.5

0.08

Exploration

CR-18-691

262

No significant values

Exploration

CR-18-693

250

94.4

94.9

0.5

0.37

Exploration

CR-18-694

256

70.9

71.5

0.6

0.61

Exploration


*The width shown is the core length. True width is estimated to be 90-95% of the core length.

**Hole CR-18-676 was drilled down dip, parallel to the diorite, to test for the presence of multiple directions of quartz veining. The width shown is the core length. True width is estimated to be 30-35% of the core length.

 

The Croinor Gold deposit is hosted in a sheared diorite sill three kilometres long by 60-120 metres wide, striking 295 degrees north and dipping 50-65 degrees to the north. The mineralization is associated with pyrite found within and adjacent to quartz-tourmaline veins.

Sampling normally consists of sawing the core into equal halves along its main axis and shipping one of the halves to the ALS Minerals laboratory in Val-d'Or, Quebec for assaying. The samples are crushed, pulverized and assayed by fire assay, with atomic absorption finish. Results exceeding 3.0 g/t Au are re-assayed using the gravity method, and samples containing visible gold grains are assayed using the metallic sieve method. Monarch uses a comprehensive QA/QC protocol, including the insertion of standards, blanks and duplicates.

The technical and scientific content of this press release has been reviewed and approved by Ronald G. Leber, P.Geo., the Corporation's qualified person under National Instrument 43-101.

ABOUT MONARCH GOLD CORPORATION

Monarch Gold Corporation (TSX: MQR) is an emerging gold mining company focused on pursuing growth through its large portfolio of high-quality projects in the Abitibi mining camp in Quebec, Canada. The Corporation currently owns close to 300 km² of gold properties (see map), including the Wasamac deposit (measured and indicated resource of 2.6 million ounces of gold), the Beaufor Mine, the Croinor Gold (see video), McKenzie Break and Swanson advanced projects and the Camflo and Beacon mills, as well as other promising exploration projects. It also offers custom milling services out of its 1,600 tonne-per-day Camflo mill.

Forward-Looking Statements
The forward-looking statements in this press release involve known and unknown risks, uncertainties and other factors that may cause Monarch's actual results, performance and achievements to be materially different from the results, performance or achievements expressed or implied therein. Neither TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX accepts responsibility for the adequacy or accuracy of this press release.

View original content to download multimedia:http://www.prnewswire.com/news-releases/monarch-gold-intersects-17-26-gt-au-over-1-95-metres-including-50-10-gt-au-over-0-6-metres-at-its-croinor-gold-project-300787811.html

SOURCE Corporation Aurifère Monarques



Contact
Jean-Marc Lacoste, President and Chief Executive Officer, 1-888-994-4465, jm.lacoste@monarquesgold.com, www.monarquesgold.com; Elisabeth Tremblay, Senior Geologist - Communications Specialist, 1-888-994-4465, e.tremblay@monarquesgold.com, www.monarquesgold.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Monarch Gold Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.