• Freitag, 15 November 2024
  • 03:47 Uhr Frankfurt
  • 02:47 Uhr London
  • 21:47 Uhr New York
  • 21:47 Uhr Toronto
  • 18:47 Uhr Vancouver
  • 13:47 Uhr Sydney

Discovery of a New Copper Zone, Irene, 550 m North of Sherlock

17.09.2018  |  GlobeNewswire
  • Extension of the fertile sedimentary units 550 m to the north of Sherlock
  • MS-18-19: 45m @ 0.31% Cu & 3.14 g/t Ag including: 15m @ 0.56% Cu & 6.31 g/t Ag
  • Geophysical survey on the Hispana corridor is complete
  • Summer drilling program completed with a total of 44 drill holes and 8,293 meters on both Sherlock and Nasigon corridors

MONTREAL, Sept. 17, 2018 - Kintavar Exploration Inc. (the “Corporation” or “Kintavar”) (TSX-V: KTR) (FRANKFURT: 58V) is pleased to announce the assays from the June drilling program at the Sherlock corridor. Four (4) of the report six (6) drill holes were investigating the area north of Sherlock where multiple marble and calc-silicate boulders of several meters in size were identified and returned grades of up to 0.80% Cu and 6.34 g/t Ag.

Location of the June 2018 drillings and their mineralized intersections.


The intersections in drill holes MS-18-18 and 19 of the fertile units over tens of meters is very promising and remain open in all direction. This new “Irene” zone is located 550 m north of the Sherlock zone and was identified by following a bolder field of mineralized marbles. The same units were intersected in drill holes MS-18-20 and 21 but the presence of late faults affects the continuity of these horizons. Initial follow up by drilling in late August intersected the same mineralization and more follow up is now planned in the fall and winter. Drill holes MS-18-22 and MS-18-23 successfully intersected over several meters the fertile sedimentary units in the Sherlock and Watson zones respectively. Table 1 shows the summary of all the intersections from the most recent drilling from June 2018 and figure 1 shows the location of the new discovery.

In total, assays are pending for another 13 drill holes from the Sherlock corridor testing the new Irene zone, Toby, Elementary and other surface and geophysical anomalies. One (1) drill hole from the Sherlock zone was drilled to begin initial metallurgical studies on the recoveries of copper mineralization. Results are expected in Q1/2019.

In the Nasigon corridor, full assays are pending from 20 drill holes which were testing all the zone that were discovered this summer.

The geophysical survey in the Hispana corridor has now been completed. Compilation and follow up of anomalies will be the priority focus of the trenching and drilling program which is expected to restart in October.

DDH UTM X N83Z18 UTM Y Azimut /Dip Length (m) From To Thickness (1) Cu % Ag (g/t)
MS-18-18 483325 5253351 180/-45 156 12.1 23.0 10.9 0.14 % 0.89
MS-18-19 483324 5253351 357/-46 210 59.0 104.0 45.0 0.31 % 3.14
incl. 61.25 68.0 6.75 0.56 % 6.48
and 78.0 93.0 15.0 0.56 % 6.31
MS-18-20 483185 5253408 180/-45 264 10.0 17.0 7.0 0.27 % 2.61
and 39.0 54.0 15.0 0.15 % 0.87
MS-18-21 483182 5253395 3/-45 199 - - - - NSV NSV
MS-18-22 483515 5253136 154/-44 282 113.0 123.2 10.2 0.67 % 5.19
and 154.0 187.8 33.8 0.29 % 2.28
Incl. 182.0 187.8 5.8 0.56 % 6.18
MS-18-23 483188 5253096 267/-44 156 6.5 14.0 7.5 0.10 % 0.63
22.0 27.25 5.25 0.23 % 1.31
(1): True thickness is estimated to be 60-85% of the intersected thickness
Table 1: Summary of copper intersections from drill holes MS-18-18 to 23 on the Sherlock corridor.

“The Irene zone is a major success for the exploration team. First it demonstrates again the efficiency of our exploration approach and following boulder fields to identify mineralization on the Mitchi project. This was a hidden target until the boulder field and the IP survey generated a drilling target. Second, it extends our exploration horizons more to the north where the favorable stratigraphy was not believed to be present based on historical mapping. And finally, this is a new, mineralized, near surface horizon, that appears to be parallel to the main Sherlock zone with similar grades and same style of mineralization, which means more mineralized material in the Mitchi basin. This type of parallel zones will be key in growing the size of the Mitchi project which shows more and more potential of becoming a major copper project.” comments Kiril Mugerman. president and CEO of Kintavar.

Figure 1 (http://www.globenewswire.com/NewsRoom/AttachmentNg/95020d61-0a0c-465d-91ef-59b4d5de438b): Localisation des forages de la campagne de juin 2018 et de leurs intersections minéralisées. Full size map can be viewed here.

All samples have been sent and prepared (PREP-31) by ALS Global laboratory in Val-d’Or. The pulp was sent to ALS Global laboratory in Vancouver for copper assays (CU-ICP61). silver assays (AG-ICP61) or a multi-elemental analysis by four acid digestion (ME-ICP61) and spectroscopy (ICP-AES/MS). Samples with assays higher than 10.000 ppm Cu were reanalyzed by atomic absorption (CU-OG62) at the ALS Global Vancouver laboratory. Quality controls include systematic addition of blank samples and certified copper standards to each batch of samples sent to the laboratory.

About the Mitchi Property

The Mitchi property (approx. 30,000 hectares, 100% owned) is located west of the Mitchinamecus reservoir, 100 km north of the town of Mont-Laurier. The property covers an area of more than 300 km2 accessible by a network of logging and gravel roads with a hydro-electric power substation located 14 km to the east. The property is located in the north-western portion of the central metasedimentary belt of the Grenville geological province. Many gold, copper, silver and/or manganese mineralized showings have been identified to date, with many characteristics suggesting of a sediment-hosted stratiform copper type deposit (SSC) in the Eastern portion of the property and Iron Oxide Copper Gold ore (IOCG) and skarn type deposits in the Western portion. Osisko holds a 2% NSR on 27 claims of the southern portion of the Mitchi property, outside of the sedimentary basin.

NI-43-101 Disclosure

Alain Cayer, P.Geo., MSc., Vice-President Exploration of Kintavar, is Qualified Person under NI 43‐101 guidelines who supervised and approved the preparation of the technical information in this news release.

For further information contact:
Kiril Mugerman,
President and CEO
Telephone: +1 450 641 5119 #5653
Email: kmugerman@kintavar.com
Web: www.kintavar.com

Forward looking Statements:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains statements that may constitute “forward-looking information” or “forward looking statements” within the meaning of applicable Canadian securities legislation. Forward-looking information and statements may include, among others, statements regarding future plans, costs, objectives or performance of the Corporation, or the assumptions underlying any of the foregoing. In this news release, words such as “may”, “would”, “could”, “will”, “likely”, “believe”, “expect”, “anticipate”, “intend”, “plan”, “estimate” “target” and similar words and the negative form thereof are used to identify forward-looking statements. Forward-looking statements should not be read as guarantees of future performance or results, and will not necessarily be accurate indications of whether, or the times at or by which, such future performance will be achieved. No assurance can be given that any events anticipated by the forward-looking information will transpire or occur, including additional closings of the private placement referred to above, or if any of them do so, what benefits the Corporation will derive. Forward-looking statements and information are based on information available at the time and/or management's good-faith belief with respect to future events and are subject to known or unknown risks, uncertainties, assumptions and other unpredictable factors, many of which are beyond the Corporation’s control. These risks, uncertainties and assumptions include, but are not limited to, those described under “Risk Factors” in the Corporation’s management’s discussion and analysis for the fiscal year ended December 31, 2017, which is available on SEDAR at www.sedar.com; they could cause actual events or results to differ materially from those projected in any forward-looking statements. The Corporation does not intend, nor does the Corporation undertake any obligation, to update or revise any forward-looking information or statements contained in this news release to reflect subsequent information, events or circumstances or otherwise, except if required by applicable laws.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Kintavar Exploration Inc.
Bergbau
A2DQ5K
CA49720T1021
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.