• Mittwoch, 25 Dezember 2024
  • 18:18 Uhr Frankfurt
  • 17:18 Uhr London
  • 12:18 Uhr New York
  • 12:18 Uhr Toronto
  • 09:18 Uhr Vancouver
  • 04:18 Uhr Sydney

Ashanti Broadens Main Zone at Gourbassi East, Kossanto East Project, Mali

26.07.2018  |  GlobeNewswire
48m of 1.34 g/t gold (including 3m of 3.57 g/t gold) and 34m of 1.80 g/t gold (including 4m of 8.48 g/t gold)

VANCOUVER, July 26, 2018 - Ashanti Gold Corp. (“Ashanti” or the “Company”) - (TSXV:AGZ) is pleased to announce additional results from the recently completed 105 hole Reverse Circulation (“RC”) and Diamond Drill (“DD”), 12,283 metre drill program that tested mineralization on the Kossanto East Project (the “Property”) in western Mali (Figure 1). Results presented here and previously demonstrate strong positive results from drill holes at Gourbassi East. Results reported here broaden the width and increase the down-dip extent of known gold mineralization of the ≤75m wide Main Zone, Gourbassi East. In addition, drill hole GERC238 in combination with last year’s GERC151 extends the strike length of new zones ≤7m wide of gold mineralization parallel to the Main Zone. The Company awaits further results from the Gourbassi East Main Zone and from Gourbassi West.

Overview of the Kossanto East property showing the location of Gourbassi East and Gourbassi West mineralized zones. Yellow dashed lines outline areas of anomalous soil samples (see March 18, 2018 Press Release). The Faleme River marks the southern boundary of the concession.


Gourbassi East Main Zone with location of holes and sections reported here. Yellow dots show AGZ’s 2018 drill holes. Red dotted lines outline soil anomalies shown in Figure 1.


East-west cross section at 1483700 north shows mineralization intersected in Ashanti 2018 drill holes GERC208, GERC223, GERC241, GERC242, and GERC243 along with historic data (2018 drill program in light boxes reported here along with important previous Ashanti and historic drilling and trenching in dark grey Au histograms). The lower panel shows the drill holes in plain view.


East-west cross section at 1483850 north shows mineralization intersected in Ashanti 2018 drill holes GERC238, GERC239, and GERD284 along with historic data (2018 drill program in light boxes reported here along with important previous Ashanti and historic drilling and trenching in dark grey Au histograms). The lower panel shows the drill holes in plain view.


The holes presented below were drilled to test Gourbassi East Main Zone mineralization down dip, along strike and along section fences to provide sufficient data for a resource estimate later this year. Importantly, mineralized intervals reported here lie along multiple mineralized zones of mineralization interpreted and predicted from previous drilling and thereby will support favorably geologic and resource modeling.

Section Hole From (m) To (m) Interval (m)* Grade (g/t)
1483700 GERC223 90 102 12 0.72
incl. 97 101 4 1.65
122 134 12 0.82
incl. 132 134 2 2.29
198 200 2 1.49
GERC241 100 104 4 0.98
116 132 16 0.67
incl. 118 121 3 1.48
144 147 3 1.82
incl. 144 145 1 3.92
178 183 5 0.68
GERC242 14 62 48 1.34
incl. 17 20 3 3.57
incl. 37 41 4 2.98
GWRC243 6 19 13 1.17
40 45 5 1.77
89 97 8 3.34
110 144 34 1.80
incl. 126 130 4 8.38
incl. 139 143 4 2.82
1483850 GERC238 16 18 2 5.00
84 87 3 2.04
GERC239 0 1 1 0.76
GERD284 0 24 24 0.84
incl. 0 11 11 1.06
41 45 4 0.73
51 59 8 1.51
incl. 54 59 5 2.14

*Intervals indicated are not true widths as there is insufficient geologic information to calculate true widths. However, drill holes have been drilled to cross interpreted mineralized zones as close to perpendicular as possible.

Tim McCutcheon, CEO, said “We are very pleased with these results as they support and expand known mineralization with key areas of higher grade material (5 – 12 g/t Au). We are looking forward to the contribution this mineralization will make to the planned resource estimate to be undertaken once we receive all assay results.”

Graphics accompanying this announcement are available at
http://www.globenewswire.com/NewsRoom/AttachmentNg/fa464430-dee6-4740-8c1b-bf9067032126

http://www.globenewswire.com/NewsRoom/AttachmentNg/8513b32d-f451-47b5-89de-791e73722dca

http://www.globenewswire.com/NewsRoom/AttachmentNg/a1560a73-5612-4410-8589-6e29314cd392

http://www.globenewswire.com/NewsRoom/AttachmentNg/b98dc40a-d310-4360-ae55-99dc2184223c

About Kossanto East Project

The Kossanto East Project is a 66.41 km2 concession in the prolific Kedougou - Kenieba Inlier, the northwestern most exposure of Birimian rocks in West Africa and host to the Loulo and Sadiola group of world class gold deposits. The Property hosts two principle historically drill-tested targets, Gourbassi East and Gourbassi West and several surface anomalies identified in historic surface samples and Rotary Airblast (RAB) drill holes. Geochemical anomalies identified by previous explorers led to drill testing and successful intersection of gold mineralization. The results reported here are from Gourbassi East. Further results from Gourbassi East and Gourbassi West are anticipated in the coming weeks.

ABOUT ASHANTI GOLD
Ashanti is a gold-focused, exploration and development company that targets projects where it has a competitive advantage due to past work experience of the team and specific project know-how. The Company is driving forward its 100%-owned Kossanto East project in Mali on the prolific Kenieba Belt, which hosts such deposits as Loulo, Fekola and Sadiola. Ashanti is also working to advance, together with its earn-in partners, the Anumso project and the Ashanti Belt project in Ghana, which are near-adjacent to the Akyem deposit.

On Behalf of the Board of Directors of
Ashanti Gold Corp.

"Tim McCutcheon"

Tim McCutcheon
CEO

For further information, please contact:
Ashanti Gold Corp.
2300 – 1177 West Hastings Street
Vancouver BC, V6E 2K3
Phone: 604-638-3847

Qualified Person and Quality Assurance / Quality Control

Dr. Paul Klipfel, CPG (AIPG certification #10821), Ashanti’s COO and Chief Geologist is a Qualified Person as defined by Canadian NI 43-101 and has supervised the preparation of the scientific and technical information that forms the basis for this news release. Dr. Klipfel is responsible for all aspects of the work including the Quality Control/Quality Assurance programs. Dr. Klipfel is not an Independent Person, as he is a shareholder of Ashanti.

Certified Reference Materials and Blanks are inserted into the sample stream at the rate of 1:20 samples. Field duplicates are collected at the rate of 1:50 samples. All samples have been analyzed by SGS Laboratories in Bamako with standard preparation methods and 50g fire assay with atomic absorption finish. SGS does their own introduction of QA/QC samples into the sample stream and reports them to Ashanti for double checking. Higher grade samples are reanalyzed from pulp or reject material or both.

Cautionary Statement on Forward-Looking Information

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
This press release contains forward-looking statements and forward-looking information (collectively, "forward looking statements") within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding the anticipated content, commencement, timing and cost of exploration programs, anticipated exploration program results, the discovery and delineation of mineral deposits/resources/reserves, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, the state of the financial markets for the Company's equity securities, the state of the commodity markets generally, variations in the nature, quality and quantity of any mineral deposits that may be located, variations in the market price of any mineral products the Company may produce or plan to produce, the inability of the Company to obtain any necessary permits, consents or authorizations required, including TSXV acceptance, for its planned activities, the inability of the Company to produce minerals from its properties successfully or profitably, to continue its projected growth, to raise the necessary capital or to be fully able to implement its business strategies, and other risks and uncertainties disclosed in the Company's latest interim Management Discussion and Analysis and filed with certain securities commissions in Canada. All of the Company's Canadian public disclosure filings may be accessed via www.sedar.com and readers are urged to review these materials, including the technical reports filed with respect to the Company's mineral properties.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Ashanti Gold Corp.
Bergbau
A2AQC8
CA04375E1088
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.