Nouveau Monde Graphite Inc. Increases Its Indicated Resources to 95.8 Mt at a Grade of 4.28% Cg for Its West Zone Graphite Deposit
Nouveau Monde’s President and CEO Eric Desaulniers commented: “Our recent work has nearly tripled our Indicated Mineral Resources while only increasing the maximum width of the pit envelope by 30 m.” Desaulniers adds: “Industry leading market analysis has indicated that a global supply deficit of natural graphite is expected by 2022-23 principally caused by the phenomenal growth in the lithium-ion battery market. With this Current Resource, we are now working towards an optimized mining plan with a projected flake concentrate production output of around 100,000 tonnes per year. While the parameters used to generate the pit envelope were different than those used for the prefeasibility resource estimate, they should favorably influence the project’s economics.”
The Current Resource is summarized in Table 1 below and is compared to the previous pit-constrained Mineral Resource Estimate (the “Previous Resource”) first published on a March 2, 2017, press release. The Current Resource is based on a newly acquired land package (see July 5, 2017 press release), the properties’ Prefeasibility Study (refer to the October 25, 2017 press release), on the diamond drilling program completed in January 2018 (refer to the March 1, 2018, press release), new geotechnical data and hydrogeological modelling as well as future market outlook. The results presented here will serve as the basis for a Feasibility Study, scheduled to be completed in Fall of 2018.
Table 1: Pit-Constrained Mineral Resource Estimate for the West Zone1 | ||||||
Mineral Resource Category2 | Current Resource (June 27, 2018)8 | Previous Resource (March 2, 2017)8 | ||||
Tonnage (Mt)5,7 | Grade (%Cg)3 | Cg (Mt) | Tonnage (Mt)6,7 | Grade (%Cg)3 | Cg (Mt) | |
Indicated | 95.8 | 4.28 | 4.10 | 32.9 | 4.50 | 1.48 |
Inferred4 | 14.0 | 4.19 | 0.59 | 0.2 | 4.84 | 0.01 |
1 The mineral resources provided in this table were estimated using current Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Reserves, Definitions and Guidelines. 2 Mineral resources that are not mineral reserves have not demonstrated economic viability. Additional trenching and/or drilling will be required to convert Inferred and Indicated Mineral Resources to Indicated and Measured Mineral Resources. 3 All analyses used for the Resource Estimates were performed by ALS Minerals Laboratories and delivered as graphitic carbon (“% Cg”), internal analytical code C-IR18. 4 Inferred Mineral Resources represent material that is considered too speculative to be included in economic evaluations. Additional trenching and/or drilling will be required to convert Inferred Mineral Resources to Indicated or Measured Mineral Resources. 5 Current Resource effective June 27, 2018. 6 Previous Resource published March 2, 2017. 7 The Current and Previous Mineral Resources are stated at a cut-off grade of 1.78% Cg and 2.28% Cg respectively. 8 Standards used for this resource update are the same standards produced over the course of the Prefeasibility Study (results published October 25, 2017). The difference comes from a newly acquired land package (see July 5, 2017 press release), the south-west extension drilled in 2018, the new hydrogeological and geotechnical information as well as the updated market outlook. |
Various characteristics of the Current Resource pit envelope are compared to the Previous Resource pit envelope in Table 2.
Table 2. Current and Previous Resource Pit Envelope Characteristics | ||
Pit Envelope Characteristics | Current Resource (June 27, 2018)3 | Previous Resource (March 2, 2017)3 |
Length (m)1 | 2,690 | 2,300 |
Maximum Width (m) | 430 | 400 |
Surface Area (km2) | 0.896 | 0.4826 |
Minimum Pit Elevation (m)2 | 255 | 390 |
Maximum Vertical Difference between Pit Depth and Original Surface Elevation (m) | 240 | 145 |
Waste to Ore Ratio | 1.20 :1 | 1.04 :1 |
1 Measured length is approximate. 2 Elevation is measures above sea level or “ASL”. 3 The Current Resource is constrained within an optimized pit envelope using different parameters than the Previous Resource. Parameters used are summarized in Table 3 of this press release. |
A map displaying the West Zone core drilling and trenching locations as well as a plan view of the Current Resource is available through this link:
http://nouveaumonde.ca/wp-content/uploads/PR_West_Zone_20180627_EN.pdf
Data Sources and Current Resource Estimation Methods
The block model, used to generate the Current Resource of the West Zone deposit, is based on a total of 105 core drill holes which produced 4,518 samples, as well as 207 samples collected from channeling work in three (3) trenches. In all, 19 mineralized horizons encased in paragneiss units were interpreted and modelled from this data.
Mineralized material sorting was performed through an automated sorting algorithm using research ellipsoids centred upon composites.
The indicated resource boundary study is based on the distance between drill holes. The total thickness of the mineralized volumes is comprised in the same category. The Indicated Resource is a continuous zone measuring approximately 2.6 km long by 175 m wide. Drill holes are typically spaced 100 m apart or less from section to section and spaced every 75 m or less over the sections. All resources outside this perimeter obtain the inferred category by default.
The Current Resource block model for the West Zone was prepared by Yann Camus, P. Eng., of SGS Canada Inc. —Geostat (“SGS Geostat”) from Blainville, Québec, using the Genesis© mining software. Interpolation was performed using inverse square distance (ID2) as well as different search ellipses which were adapted for the geology of the deposit. The block model was then fed to GEOVIA’s WhittleTM software to provide an optimized pit envelope constraining the resources. The parameters used to generate the pit envelope were different than those used for the prefeasibility resource estimate. The parameters used are available below in Table 3. Unlike the Previous Resource, the pit envelope containing the Current Resource was not limited to an elevation of 390 m above sea level following the conclusions of recent studies including updated market outlook as well as new hydrogeological and geotechnical information.
Table 3. Current Resource Pit Envelope Generation Parameters | |||
Parameters | Values | ||
Currency (CAD unless specified) | 1.28 CAD = 1.00 USD | ||
Block Size | 5m x 5m x 5m | ||
Specific Gravity | 2.76 t/m3 | ||
Overall Slope Angle | Rock | 55o | |
Overburden | 25o | ||
Mining Cost | Mineralized Material | $3.06/t | |
Waste | $3.46/t | ||
Overburden | $3.17/t | ||
Mining Dilution | 5% | ||
Mining Recovery | 95% | ||
Rehabilitation Cost | $0.61/t | ||
Processing Cost | $12.94/t | ||
Transportation Cost | $47.92/t | ||
Processing Recovery | 94% | ||
G&A | $1.60/t | ||
Selling Price of Concentrate | $1,124.00 USD/t – transportation cost | ||
NSR Royalty | 2% | ||
Concentrate Grade | 97% |
It is important to note that Nouveau Monde will be issuing an updated prefeasibility technical report, completed in accordance with National Instrument (NI) 43-101, detailing this important change within 45 days following this release. This upcoming report will lay the groundwork for a feasibility study targeting a production of 100,000 tonnes of graphite concentrate per year from the West Zone deposit.
The technical data included in this release was prepared by a qualified independent expert, as defined by the 43–101 Regulation, Yann Camus, Eng., of SGS Canada Inc. — Geostat.
About Nouveau Monde Graphite
In 2015, Nouveau Monde Graphite discovered a major and high-quality graphite deposit on its Matawinie property, located in Saint-Michel-des-Saints, 150 km north of Montreal, Quebec. The discovery led to the announcement of a prefeasibility study on October 25, 2017. The prefeasibility study results revealed projected graphite concentrate production levels of 52,000 tonnes per year over a 27-year period. In the summer of 2018, NMG will be launching its first tonnes of concentrated graphite flake manufactured in demonstration plant. NMG’s demonstration plant has been built for a production capacity of 2,000 tonnes of concentrated flake graphite for a two-year period.
Moreover, in a vertical integration and sustainable development perspective, the company is planning the establishment of a large-scale graphite secondary transformation facility, catering the needs of the booming lithium-ion battery market. With over 60 years of experience in the world of graphite, NMG’s team develops its projects with the utmost respect of neighboring communities, while favoring a minimal ecological footprint. NMG’s project is privileged by direct access to the workforce and infrastructure needed to operate its mining project, and it can also rely on an abundant, affordable and renewable source of hydroelectricity.
Subscribe to our newsfeed:
http://nouveaumonde.us12.list-manage.com/subscribe?u=f5e3304c32bfb54992fd9acce&id=603de466df
For more information:
Tristan Ménard
Executive Vice President, Capital Markets
+1 (514) 296-6339
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
All statements, other than statements of historical fact, contained in this press release including, but not limited to (i) the increase of Mineral Resources tonnage, (ii) the conversion of Inferred or Indicated Mineral Resources to Measured Resources and the conversion of Mineral Resources to Mineral Reserves , (iii) the positive impact of the foregoing on project economics, and (iV) generally, or the “About Nouveau Monde Graphite” paragraphs which essentially describe the Corporation’s outlook and objectives, constitute “forward-looking information” or” forward-looking statements” within the meaning of certain securities laws, and are based on expectations, estimates and projections as of the time of this press release. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect.
Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual results to differ materially from those expressed or implied in any forward-looking statements. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are provided for the purpose of providing information about management’s expectations and plans relating to the future. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.
Further information regarding Nouveau Monde is available in the SEDAR database (www.sedar.com) and on the Corporation’s website at: www.nouveaumonde.ca