• Donnerstag, 26 Dezember 2024
  • 19:30 Uhr Frankfurt
  • 18:30 Uhr London
  • 13:30 Uhr New York
  • 13:30 Uhr Toronto
  • 10:30 Uhr Vancouver
  • 05:30 Uhr Sydney

Hastings Technology Metals Ltd.: Environmental Review Document Submitted for Yangibana Project

26.06.2018  |  ABN Newswire
Sydney - Hastings Technology Metals Ltd. (ASX:HAS) ("Hastings" or the "Company") is pleased to advise that the Environmental Review Document (ERD) for the Yangibana Project has been submitted to the Environmental Protection Agency (EPA) of Western Australia.

The lodgement achieves a significant milestone in the Yangibana Project approvals process, and the document confirms that the project can meet the scope of work outlined in the EPA approved environmental scoping document.

Charles Lew, Executive Chairman, commented "lodging the ERD marks a further important milestone in developing the Yangibana Project as a high grade NdPr rare earths production mine.

It is a comprehensive document dealing with environmental, economic and social issues relating to the Yangibana processing and mining operations. Hastings is committed to managing the Yangibana Project in a socially acceptable and environmentally responsible manner."

A thorough understanding of the surrounding environment and the project's environmental impacts has been achieved with detailed studies of:

o Flora and vegetation

o Fauna, including vertebrates, short range endemic fauna and subterranean fauna

o Groundwater and Surface Water

o Waste characterisation including radionuclide assessments

o Soils

o Baseline radiation assessment (air, soil, water)

o Air quality, including dust

o Heritage values

The ERD demonstrates how any potential impacts from the project that may have been highlighted by the various studies can be managed by Hastings.

One of the key findings of the studies is that the naturally occurring radioactive material can be largely removed from the ore through processing and is retained on-site in Western Australia. As such, the Mixed Rare Earths Carbonate (MREC) is not subject to regulatory requirements of the International Atomic Energy Agency (IAEA) Transport Regulations and can be transported as general freight cargo using existing logistics operators and ports.

Tailings waste will be retained on site in permanent tailing storage facilities. Modelling shows the facilities can be rehabilitated at closure to be below the areas naturally occurring radiation levels.

The EPA will now review the ERD and provide feedback to Hastings prior to the document being released for a four-week public review period.



About Hastings Technology Metals Ltd:

Hastings Technology Metals Ltd. (ASX:HAS) is currently developing a rare earths mine and processing plant at Yangibana in the Gascoyne Region of Western Australia. The processing plant is anticipated to commence production of MREC in late 2019. Hastings has completed both beneficiation and hydrometallurgy pilot plants, in the process producing MREC samples which are high in neodymium and praseodymium content. These are critical materials for the production of permanent magnets and other technology applications. The MREC will be capable of being further separated and refined to produce a number of individual rare earth oxides outside of Australia. Hastings estimates an annual production quantity of 15,000 tonnes of MREC which it will sell to offtake partners globally.



Contact:

Hastings Technology Metals Ltd.
Charles Lew Executive Chairman
T: +65-9790-9008

Stefan Wolmarans Chief Operating Officer
T: +61-9078-7674

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Hastings Technology Metals Ltd.
Bergbau
A1H79R
AU000000HAS0
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.