• Freitag, 15 November 2024
  • 07:57 Uhr Frankfurt
  • 06:57 Uhr London
  • 01:57 Uhr New York
  • 01:57 Uhr Toronto
  • 22:57 Uhr Vancouver
  • 17:57 Uhr Sydney

Brixton Metals Drills 1.98% Cobalt, 15,436.00 g/t Silver over 1.00m within 7.87m of 2,787.26 g/t Silver, 0.27% Cobalt and Intersected 70.65m of Nickel-Cobalt-Silver in Archean Basement

09.05.2018  |  GlobeNewswire

VANCOUVER, British Columbia, May 09, 2018 (GLOBE NEWSWIRE) -- Brixton Metals Corp. (TSX-V:BBB) (the “Company” or “Brixton”) is pleased to announce drill results from its wholly owned Langis Mine Project located in the Cobalt Camp, Ontario, Canada.

Figure 2


Figure 1


Highlights from six drill holes at the Langis Project

  • Drill hole LM18-16 intersected 7.87m of 2,787.26 g/t silver, 0.27% cobalt including 1.00m of 15,436.00 g/t silver, 1.98% cobalt, 0.47% nickel
  • Drill hole LM18-20 intersected 70.65m of 0.10% nickel, 0.01% cobalt, 7.07 g/t silver

Chairman and CEO of Brixton, Gary R. Thompson stated, “Brixton Metals continues to deliver strong silver-cobalt results from the Cobalt Camp. Drill hole LM18-16 returned a spectacular one metre interval of 450 oz/t silver (15,436 g/t Ag) and 1.98% cobalt, which combined is equivalent to 12.67% cobalt or 537 oz/t silver. A broad nickel-cobalt-silver mineralized zone was discovered in the Archean basement rocks, which is up to 70m thick. See the table and cross section below, where holes 16, 19, 20 and 21 intersected nickel-cobalt-silver mineralization. We plan to drill more holes on the property aimed at locating a high-grade core to this broad mineralized horizon at Langis and to further extend the bonanza grade silver-cobalt veins.”

Table of Highlights from drill holes LM18(16-19)

Hole From To Interval Silver Cobalt Nickel Gold CoEq AgEq
ID (m) (m) (m) g/t % % g/t % g/t
LM-18-16 149.00 158.73 9.73 8.74 0.02 0.01 - 0.02 32.63
LM-18-16 158.73 166.60 7.87 2,787.26 0.27 0.06 - 2.19 3,187.07
including 159.56 161.60 2.04 10,584.71 1.00 0.24 - 8.31 12,089.84
including 159.56 160.56 1.00 15,436.00 1.98 0.47 - 12.67 18,423.79
LM-18-16 190.00 211.68 21.68 0.66 0.01 0.16 - 0.04 56.05
LM-18-16 230.00 233.47 3.47 - - - 1.32
including 232.23 233.47 1.24 - - - 3.57
LM-18-18 132.00 134.00 2.00 24.95 0.01 0.01 - 0.03 45.17
LM-18-19 121.00 124.00 3.00 5.03 0.07 0.02 - 0.08 117.00
including 121.00 122.00 1.00 5.00 0.12 0.02 - 0.13 189.83
LM-18-19 129.00 130.00 1.00 58.60 0.14 0.12 0.21 0.20 293.59
LM-18-19 200.00 231.00 31.00 0.60 0.01 0.12 - 0.03 41.37

Cobalt Equivalent values (CoEq) were calculated using the formula CoEq = $16.5 x Ag g/t ÷ 31.104 +$35 x % Co ÷ 100 x 2204.63 + $5.50 x % Ni ÷ 100 x 2204.63 ÷ $35 ÷ 2204.63*100. This method assumes full metal recoveries.

Silver Equivalent values (AgEq) were calculated using the formula AgEq = $16.5 x Ag g/t ÷ 31.104 + $35 x % Co ÷ 100 x 2204.63 + $5.50 x % Ni ÷ 100 x 2204.63 ÷$16.5 x 31.104. Metal prices used in this calculation include: $16.5 per ounce for Ag, $5.5 per pound for Ni and $35 per pound for Co. This method assumes full metal recoveries. True width cannot be determined at this time and reported widths are drilled intervals.

Hole LM18-17 encountered underground workings and was abandoned. Results from 8 additional holes are pending. True widths have not been determined at this time.

Table of Highlights from drill holes LM18(20-21)

Hole From To Interval Silver Cobalt Nickel CoEq AgEq
ID (m) (m) (m) g/t % % % g/t
LM-18-20 116.00 141.00 25.00 22.29 0.04 0.08 0.06 93.68
including 120.00 124.67 4.67 11.13 0.13 0.02 0.14 204.36
LM-18-20 124.67 195.32 70.65 7.07 0.01 0.10 0.03 43.03
LM-18-20 128.00 130.00 2.00 32.45 0.01 0.10 0.05 75.04
LM-18-20 134.00 139.00 5.00 75.24 0.02 0.10 0.09 131.45
LM-18-21 114.00 115.00 1.00 1.30 0.14 0.02 0.14 208.26
LM-18-21 128.00 142.00 14.00 3.41 0.01 0.10 0.03 43.14
LM-18-21 156.00 169.00 13.00 0.02 0.01 0.08 0.02 27.78

Core Descriptions

LM-18-16: (159.56 – 160.56m): Mineralization consists of smaltite-native silver-cobaltite multi-centimetre scale veins and veinlets +/- pink quartz calcite veinlets that cross-cut Huronian conglomerate. Very fine disseminated cobalt minerals and native silver is present in this interval.

Quality Assurance & Quality Control

Sealed samples were shipped by the Company geologists to ALS Minerals preparation lab in Sudbury, Ontario. ALS Minerals Laboratories are registered to ISO 9001:2008 and ISO 17025 accreditations for laboratory procedures. Blank, duplicate and certified reference materials were inserted into the sample stream. Analysis for gold was done by Fire Assay with AA finish. All other elements were analyzed by Aqua Regia Digest with ICP-AES finish. Cobalt over-limits were analyzed with Sodium Peroxide Fusion and AES finish. Silver over-limits were analyzed by fire assay with gravimetric finish. Base metal over-limits were analyzed with Aqua Regia Digest and AES finish. A copy of the QAQC protocols can be viewed at the Company’s website.

Mr. Sorin Posescu, P.Geo, is a Qualified Person as defined under National Instrument 43-101 standards and has reviewed and approved this news release.

About the Langis and Hudson Bay Silver-Cobalt Project

Brixton’s wholly owned Langis and Hudson Bay past producing mines are located 500km north from Toronto, Ontario, Canada. The cobalt-silver mineralization occurs as steeply-moderately and in some cases shallow dipping veins and as disseminations within any of the three main rock types: Archean volcanics, Coleman Member sediments and Nipissing diabase. The Langis mine produced 10.4Moz of silver at 25 oz/t Ag and 358,340 pounds of cobalt and the Hudson Bay mine produced 6.4Moz of silver at 123 oz/t Ag and 185,570 pounds of cobalt. Historically, the Cobalt Camp produced 50M pounds of cobalt as a by-product of 500M ounces of silver production.

About Brixton Metals Corporation

Brixton is a Canadian exploration and development company focused on the advancement of its gold and silver projects toward feasibility. Brixton wholly owns four exploration projects, the Thorn gold-silver and the Atlin gold projects located in NWBC, the Langis-Hudson Bay silver-cobalt project in Ontario and the Hog Heaven silver-gold-copper project in NW Montana, USA. The Company is actively seeking JV partners to advance one or more of its projects. Brixton Metals Corp. shares trade on the TSX-V under the ticker symbol BBB. For more information about Brixton please visit our website at www.brixtonmetals.com.

On Behalf of the Board of Directors

Mr. Gary R. Thompson, Chairman and CEO
Tel: 604-630-9707 or email: info@brixtonmetals.com

For Investor relations please contact at mitchell.smith@brixtonmetals.com or 604-630-9707

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Information set forth in this news release may involve forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as “anticipate”, “believe”, “plan”, “estimate”, “expect”, and “intend”, statements that an action or event “may”, “might”, “could”, “should”, or “will” be taken or occur, including statements that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans, or other similar expressions. All statements, other than statements of historical fact included herein including, without limitation, statements regarding the use of proceeds, By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following risks: the need for additional financing; operational risks associated with mineral exploration; fluctuations in commodity prices; title matters; and the additional risks identified in the annual information form of the Company or other reports and filings with the TSXV and applicable Canadian securities regulators. Forward-looking statements are made based on management’s beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements.

The figures accompanying this announcement are available at

http://resource.globenewswire.com/Resource/Download/52294488-6947-46f7-a575-800a7818d8f2

http://resource.globenewswire.com/Resource/Download/ad5818ab-9cae-4b1a-ad4a-5548d39f9ebc


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Brixton Metals Corp.
Bergbau
A114WV
CA11120Q3026
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.