• Samstag, 28 Dezember 2024
  • 08:53 Uhr Frankfurt
  • 07:53 Uhr London
  • 02:53 Uhr New York
  • 02:53 Uhr Toronto
  • 23:53 Uhr Vancouver
  • 18:53 Uhr Sydney

Marlin Gold Intersects 3.27 g/t Gold Over 9.40 Meters at the La Trinidad Mine in Sinaloa, Mexico

01.03.2017  |  CNW

/NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR RELEASE OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES/

VANCOUVER, March 1, 2017 /CNW/ - Marlin Gold Mining Ltd. (TSX-V: MLN) ("Marlin" or the "Company") is pleased to report assay results from the first set of holes on the north side of the pit wall at the Company's wholly owned La Trinidad mine in Sinaloa, Mexico.  

The results indicate that the HS Zone mineralization extends approximately 30 meters to the north beyond the current pit limit.  A decision to proceed with a pit layback to extend the mine life further will be made after pending assays from this program are received.

The table below summarizes the drill results.

Drill Hole

From (m)

To (m)

Length (m)

Au (g/t)

16TRD26

34.00

40.50

6.50

2.59

16TRD27

8.00

17.40

9.40

3.27

16TRD28

19.80

30.00

10.20

2.68

16TRD29-33

No significant intercepts

*Significant intersection defined as minimum gold assay of 0.3 g/t over minimum 6-meter interval with no more than 2 meters of internal dilution below 0.3 g/t. Drill hole intercepts are believed to be approximately the true thickness of the zone.

 

The samples were assayed by Bureau Veritas Commodities Canada Ltd. (AcmeLabs and Inspectorate) in Vancouver.

Dr. Matthew D. Gray. C.P.G., of Resource Geosciences Incorporated, a Qualified Person under the definitions of CSA NI 43-101, implemented and supervised industry standard QA/QC protocols for the La Trinidad drill sampling program including insertion of duplicate and reference standard samples. Dr. Gray has verified the reliability of the drill sampling results reported in this press release.

About Marlin Gold

Marlin is a publicly-traded gold and silver mining company with properties located in Sinaloa, Mexico and Arizona, USA. Marlin's priority is to advance its properties toward commercial production and enhance shareholder value through the growth of its wholly owned subsidiary, Sailfish Royalty Corp. The La Trinidad property in Sinaloa, Mexico, declared commercial production on November 1, 2014. A NI 43-101 mineral resource estimate and preliminary economic assessment for the La Trinidad mine and Commonwealth project can be found at www.sedar.com or at www.marlingold.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as the term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary statement regarding forward?looking information

This news release contains 'forward-looking statements' within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by words such as the following: expects, plans, anticipates, believes, intends, estimates, projects, assumes, potential and similar expressions. Forward-looking statements also include reference to events or conditions that will, would, may, could or should occur, including, without limitation, the intended use of proceeds. These forward-looking statements are necessarily based upon a number of estimates and assumptions that, while based on management's expectations and considered reasonable at the time they are made, are inherently subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: the risk that the anticipated effects of the equity financing may not result in the outcomes predicted by management, uncertainties related to raising sufficient financing to fund planned work in a timely manner and on acceptable terms; changes in planned work resulting from logistical, technical or other factors; the possibility that results of work will not fulfill projections/expectations and realize the perceived potential of the Company's projects; uncertainties involved in the interpretation of drilling results and other tests and the estimation of gold resources; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of environmental issues at the Company's projects; the possibility of cost overruns or unanticipated expenses in work programs; the need to obtain permits and comply with environmental laws and regulations and other government requirements; fluctuations in the price of gold and other risks and uncertainties, including those described in the Company's current Annual Information Form filed on SEDAR at www.sedar.com. As a result, readers are cautioned not to place undue reliance on these forward-looking statements. The forward-looking statements contained in this news release are made as of the date of this release. Unless required by law, Marlin has no intention to and assumes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR RELEASE OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES

SOURCE Marlin Gold Mining Ltd.



Contact
Akiba Leisman, Executive Chairman and Interim CEO, Marlin Gold Mining Ltd., Telephone: 203-862-7059, E-mail: aleisman@marlingold.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Marlin Gold Mining Ltd.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.