West Red Lake Gold Drills 69.55 Grams Gold Over 1.50 Metres
Toronto, Ontario (FSCwire) - West Red Lake Gold Mines Inc. (“West Red Lake Gold” or the “Company”) (CSE: RLG) (FWB: HYK) (OTC: HYLKF) announces exploration results on the 3100 hectare West Red Lake Project. The exploration program focused on tracing the geology to the east towards the area of the intersection of two regional gold bearing structures (the “Structural Intersection”) situated east of the Rowan Mine zones. The best result was 69.55 grams per ton of gold over 1.5 metres from the most easterly drill hole of the exploration program.
The Company drilled six holes totalling 1767m to better define the 500m portion of the east-west trending regional structure located between the Rowan Mine zones and the Structural Intersection alteration package. Drilling moved progressively east towards the Structural Intersection target area. The first five holes intercepted gold values in the steeply dipping regional deformation structure. The sixth and most easterly hole (RLG 15-24) provided the best result of 69.55gpt over 1.5m and was drilled into the western end of the alteration associated with the Structural Intersection. The intercept was at 297.0m – 298.5m down the hole which was drilled to the north at a -45 degree dip. The sixth hole showed significantly increased thickness of silicification within the mafic host rock along with increased thickness of ultramafics, sediments (including iron formation), and porphyry rocks.
The Structural Intersection of the two regional structures is interpreted to have altered a portion of the east-west trending regional structure over a distance of up to 1500m with hole RLG 15-24 situated at the western end, and the Red Summit Mine located near the eastern end of this 1500m long favourable exploration horizon.
The exploration horizon begins at hole RLG 15-24 and continues east for 450m to the edge of the Structural Intersection. The Structural Intersection itself is approximately 300m wide. A significant volume of porphyry rock is present on the east side of the Structural Intersection where the east-west regional structure continues and trends east for an additional 750m towards the Red Summit Mine.
The Structural Intersection of the two regional structures containing ultramafics as well as iron rich sediments and volcanics creates the potential for significant gold deposition in the geological folds and fractures which typically occur in association with the intersection of geological structures, similar to gold mineralization seen at productive mines in Red Lake.
The six holes RLG 15-19, 20, 21, 22, 23 and 24 were drilled to the north into the east-west trending regional structure known as the Pipestone Bay - St Paul Deformation Zone (the “PBS Zone”). The initial five holes traced the structure eastwards towards where the north-east trending Golden Arm Structure intersects with the PBS Zone - the Structural Intersection. The sixth hole RLG 15-24 was drilled into the western end of the alteration associated with the Structural Intersection.
Hole RLG 15-24 intersected intercalated volcanic rock units consisting of argillaceous graphites, feldspar porphyries and QFP along with cherty banded iron formations carrying sulphides. Silicification or quartz veining with gold values occurred close to lithological contacts.
In addition to the high grade intercept grading 69.55gpt over 1.5m at 297m to 298.5m down hole, there are three additional zones with widths of 2.8m, 1.2m and 2.5m between 230m and 248m down hole RLG 15-24 (see Diamond Drill Hole Table).
The three former producing mines on the West Red Lake Project property are situated on the east–west trending PBS Zone, a regional geological structure which crosses the Company property and then continues east to the town of Red Lake. The regional scale Golden Arm Structure crosses onto the West Red Lake Project from the south boundary and trends northeast for 2km to where it intersects with the PBS Zone. The intersection of the two regional scale geological structures forms the Structural Intersection exploration target which is situated approximately 1.7km east of the Rowan Mine Shaft.
The technical information presented in this news release has been reviewed and approved by Ken Guy, P.Geo., a consultant to West Red Lake Gold and the Qualified Person responsible for the exploration at the West Red Lake Project property, as defined by National Instrument 43-101 “Standards of Disclosure for Mineral Projects”.
West Red Lake Project - Rowan Mine Property - 2015 Diamond Drill Hole Table
Hole # | UTM Easting | UTM Northing | ele | dip | Az | Length (m) | from (m) | to (m) | Length (m) | Au-gpt |
RLG-15-19 | 422,304 | 5,657,948 | 372 | -45 | 360 | 300 | 111.0 | 112.0 | 1.0 | 1.24 |
RLG-15-20 | 422,304 | 5,657,948 | 372 | -60 | 360 | 261 | 221.3 | 223.0 | 1.7 | 0.77 |
RLG-15-21 | 422,346 | 5,657,951 | 372 | -45 | 360 | 180 | 124.5 | 126.0 | 1.5 | 1.19 |
RLG-15-22 | 422,451 | 5,657,915 | 372 | -45 | 360 | 327 | 163.0 | 164.0 | 1.0 | 0.61 |
RLG-15-23 | 422,550 | 5,657,862 | 372 | -45 | 360 | 375 | 246.0 | 247.0 | 1.0 | 1.44 |
RLG-15-24 | 422,699 | 5,657,821 | 372 | -45 | 360 | 324 | 165.0 | 165.5 | 0.5 | 2.56 |
230.2 | 233.0 | 2.8 | 1.30 | |||||||
237.0 | 238.2 | 1.2 | 3.38 | |||||||
245.4 | 247.9 | 2.5 | 1.51 | |||||||
297.0 | 298.5 | 1.5 | 69.55 | |||||||
Six Holes | 1767m |
Intervals reported here are core lengths. True widths are not known at this time. All depths are reported as down hole.
West Red Lake Gold Mines Inc. is a Toronto-based minerals exploration company focused on gold exploration and development in the prolific Red Lake Gold District of Northwest Ontario, Canada. The Red Lake Gold District is host to some of the richest gold deposits in the world and has produced 30 million ounces of gold from high grade zones. The Company has assembled a significant property position totalling 3100 hectares in west Red Lake (the "West Red Lake Project") which contains three former producing gold mines. The Mount Jamie Mine and Red Summit Mine are 100% owned by the Company and the Rowan Mine is held in a 60%-owned joint venture with Red Lake Gold Mines, a partnership of Goldcorp Inc. and Goldcorp Canada Ltd. The West Red Lake Project property covers a 12km strike length along the Pipestone Bay – St Paul Deformation Zone and the Company plans to continue to explore the property both along strike and to depth. To find out more about West Red Lake Gold, please visit our website at http://www.westredlakegold.com.
For additional information, please contact: John Kontak, President and acting CFO
Phone: 416-203-9181 Email: jkontak@rlgold.ca
The Canadian Securities Exchange has neither approved nor disapproved the contents of this news release. Certain statements contained in this news release constitute "forward looking statements". When used in this document, the words "anticipated", "expect", "estimated", "forecast", "planned", and similar expressions are intended to identify forward looking statements or information. These statements are based on current expectations of management, however, they are subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from the forward-looking statements in this news release. Readers are cautioned not to place undue reliance on these statements. West Red Lake Gold does not undertake any obligation to revise or update any forward-looking statements as a result of new information, future events or otherwise after the date hereof, except as required by securities laws.
To view this press release as a PDF file, click onto the following link:
public://news_release_pdf/westredlake03152016.pdf
Source: West Red Lake Gold Mines Inc. (CSE:RLG, OTC Bulletin Board:HYLKF) http://www.westredlakegold.com/
Maximum News Dissemination by FSCwire. http://www.fscwire.com
Copyright © 2016 Filing Services Canada Inc.