• Sonntag, 17 November 2024
  • 08:55 Uhr Frankfurt
  • 07:55 Uhr London
  • 02:55 Uhr New York
  • 02:55 Uhr Toronto
  • 23:55 Uhr Vancouver
  • 18:55 Uhr Sydney

Pure Gold Commences Winter Drilling Program at the Madsen Gold Project

01.02.2016  |  Marketwire

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Feb 1, 2016) - Pure Gold Mining Inc. (TSX VENTURE:PGM) ("Pure Gold" or the "Company") is pleased to announce that diamond drilling has commenced at its 100% owned Madsen Gold Project in the prolific Red Lake gold district. The 6,000 metre drilling program is designed to test and advance new interpretations of near-surface high-grade targets, in close proximity to the historic mine.

"We are very excited to kick-off our 2016 exploration program targeting new zones of high-grade mineralization within the footprint of the historic mine," stated Darin Labrenz, President and CEO of Pure Gold. "Over two million ounces were produced from surface to a depth of 1,200 metres in Madsen's Austin horizons, yet the parallel McVeigh horizon was only mined to 230 metres depth. We believe mineralization within the McVeigh continues to depth and our program is designed to test and potentially expand the extents of high-grade gold mineralization near surface."

Mineralization at McVeigh defines a steep south-plunging zone that was mined historically from near surface to a maximum depth of 230 metres. Historic drilling immediately below the mined stopes includes intercepts of 22.9 g/t gold over 11.8 metres from M-6-15150-NW and 8.7 g/t gold over 4.6m from 4-12525-N. McVeigh has had minimal testing at depth, but mineralization is highlighted by hole M-9-14825-NW, which returned 39.8 g/t gold over 0.8 metres at a depth of 450 metres1.

Please click here for a schematic long section of the McVeigh horizon: www.puregoldmining.ca/sites/default/files/McVeigh_1601.pdf

Pure Gold's $1.6 million winter drilling program is fully funded and is expected to take approximately three months to complete. The Company is continuing engineering studies to assess the existing mining and milling infrastructure, and assess potential development opportunities within the existing resource base and nearby prospects.

ABOUT MADSEN

The historic Madsen Mine operated for over 36 years with historic production of 2.5 million ounces grading 9.9 g/t gold. The Madsen Gold Project hosts an operational head frame, a permitted mill and tailings facility, and access to power, water and labour. The Madsen Gold Project has an Indicated Resource of 928,000 ounces gold at 8.93 g/t Au (in 3.24 million tonnes) and an Inferred Resource of 297,000 ounces gold at 11.74 g/t Au (in 0.79 million tonnes)2. The mineral resource is based on 13,624 drill holes, the majority being underground holes evenly dispersed throughout the mineral resource, and a robust geologic model based on 27 levels of geological mapping and sampling.

In addition to the mineral resource, the Madsen Gold Project hosts a number of highly prospective new discoveries including the Fork Zone and Russet South targets where drilling in 2015 returned 15.0 g/t gold over 5.0 metres from hole PG15-028 and 39.1 g/t gold over 2.9 metres from hole PG15-0313. Pure Gold believes the opportunity exists to advance these near-surface, high-grade exploration targets through the application of modern exploration science and a new understanding of the district.

(1) Historic drill hole results from the McVeigh horizon were completed prior to the implementation of National Instrument 43-101. A full discussion and cautionary language regarding historic sampling practices can be found in the NI 43-101 Technical Report entitled "Technical Report for the Madsen Gold Project Red Lake, Ontario, Canada," prepared by SRK Consulting (Canada) Inc. dated effective February 18, 2014. (2) See the National Instrument 43-101 technical report entitled "Technical Report for the Madsen Gold Project Red Lake, Ontario, Canada," prepared by SRK Consulting (Canada) Inc. dated effective February 18, 2014. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. (3) See news releases dated March 2, 2015 and March 16, 2015.

Qualified Persons and 43-101 Disclosure

Darren O'Brien, P. Geo., Vice President, Exploration for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 ("NI 43-101") and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

ABOUT PURE GOLD

Our mandate is pure and simple. To dream big. To colour outside the lines. To use smart science and creativity to unlock the next major discovery at the Madsen Gold Project in Red Lake, Ontario. And become Canada's next iconic gold company.

Additional information about the Company and its activities may be found on the Company's website at www.puregoldmining.ca and under the Company's profile at www.sedar.com.

ON BEHALF OF THE BOARD

Darin Labrenz, President & CEO

All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to Pure Gold within the meaning of applicable securities laws, including, but not limited to statements with respect to those that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licences and permits and obtaining required licences and permits, labour stability, stability in market conditions, availability of equipment, accuracy of any mineral resources, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Pure Gold and there is no assurance they will prove to be correct.

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to the interpretation of results at the Madsen Gold Project; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities generally; delays in permitting; possible claims against the Company; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated June 4, 2015 in the section entitled "Risk Factors", under Pure Gold's SEDAR profile at www.sedar.com.

Although Pure Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Pure Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.



Contact

Investor inquiries:
Patrick Reid
Tel: 604-801-5020
info@puregoldmining.ca


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Pure Gold Mining Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.