Intrepid Mines Limited: Kitumba Project Update
SYDNEY, AUSTRALIA--(Marketwired - Sep 28, 2015) - Intrepid Mines Ltd. (ASX:IAU) ("Intrepid" or the "Company") is pleased to provide the following update regarding the Kitumba project in Zambia.
KEY POINTS
- Fourth drill rig mobilised
- Drilling begins at Kakozhi
- Encouraging early indications from drilling at Target H
The Company's CEO, Scott Lowe said:
"We are pleased to be drilling at Kakozhi, an exciting target which is approximately 6 kilometres from our Kitumba deposit. A discovery of any significance could potentially have a significant positive impact on Kitumba economics.
We are also encouraged by the early results from our drilling at Target H, which follows on from the results from the first diamond drill hole drilled on this target and reported on 28 July 2015. Drilling on the remainder of the targets is also progressing to plan, with results to be announced to the market once final assay results are received."
KAKOZHI TARGET
Drilling is now underway to test the Kakozhi high priority satellite target. An additional diamond drill rig has been mobilised to site and has started drilling the first of two 500 metre diamond core drill holes.
Previously at Kakozhi, drilling was focused on testing a coincident soil geochemical and airborne gravity anomaly. The three holes drilled at the time were designed to gain the best stratigraphic coverage centred on a gravity and soil copper geochemical anomaly.
These previous holes (KAKDD_001, KAKDD_002 and KAK_003) confirmed a mineralised system displaying a replacement style of mineralisation with the best results being KAKDD_001, 202.54 metres at 0.35% copper from 15.9 metres to 218.44 metres, including 8.56 metres at 0.42% copper from 185.44 metres to 194 metres.
In addition to the gravity and geochemical anomaly described above, further work conducted during the 2014 exploration season identified an IP chargeability anomaly and outcropping hematite breccia.
Two holes have been designed to test these targets.
Figure 1. Mumbwa project targets showing priority
To View Figure 1, please visit the following link: http://media3.marketwire.com/docs/150928_IAU_Fig_1.pdf
UPDATE ON 2015 EXPLORATION DRILLING
Drilling at the Mumbwa Project for the 2015 drilling season began on 24 April 2015, following mobilisation of the first of the diamond drill rigs at the "Target H" prospect. Approximately 10,000 metres of diamond and reverse circulation (RC) drilling was planned for 2015 on 11 targets, with priority placed on targets anomalous in multiple datasets (soils, magnetics, gravity and mapping) and located within the Kitumba mining licence area. An update on progress is given below.
Assay results from the first exploration drill hole at "Target H" have already been reported, with some encouraging results as detailed below. (Refer to announcement lodged with AXS on 28 July 2015, "Intrepid Mines Ltd.: Mumbwa Project - Target H Delivers Encouraging Copper and Gold Results".)
COPPER HIGHLIGHTS FROM HDD_001 INCLUDED:
- 8 metres at 1.12% copper from 42 metres including
- 1 metre at 2.09% copper from 45 metres
- 1 metre at 2.09% copper from 45 metres
- 1 metre at 2.36% copper from 131 metres
- 58 metres at 0.61% copper from 185 metres including
- 16 metres at 1.02% copper from 193 metres
GOLD HIGHLIGHTS FROM HDD_001 INCLUDED:
- 5 metres at 0.65 g/t gold from 204 metres including
- 1 metre at 1.14 g/t gold from 206 metres
Follow-up drilling at "Target H" via a 200 metre step-out hole along strike (HDD_004) has also indicated some encouraging results.
During the course of drilling HDD_004, hematite was regularly observed in brecciated and fractured rock, both supergene and hypogene mineralisation has been observed and elevated results from field XRF analyses confirmed that the extension of the mineralised zone in HDD_001 has been intersected (Figure 2).
Final assay results for HDD_004 (along with results from other completed drilling) will be reported as soon as they become available (expected Q4 2015).
Figure 2 Native copper mineralisation in a highly weathered portion of the mineralised specular hematite breccia at 243 m.
To View Figure 2, please visit the following link: http://media3.marketwire.com/docs/150928_IAU_Fig_2.pdf
OTHER DRILLING COMPLETED
A total of approximately 6,000 metres of the planned 10,000 metres of drilling has been completed so far as detailed in the following tables.
RC DRILLING
To View Table RC Drilling, please visit the following link: http://media3.marketwire.com/docs/RC-DRILLING.jpg
DIAMOND DRILLING
To View Table Diamond Drilling, please visit the following link: http://media3.marketwire.com/docs/DIAMONDDRILLING.jpg
DRILLING ON OTHER TARGETS
Kantonga
Kantonga drilling has also returned interesting early indications and drilling to date has shown that the system does host chalcopyrite, as drilled in KANDD_002. Results are expected in Q4 2015. A third and final diamond hole is currently being drilled at Kantonga.
Quantec H
Quantec H is located to the immediate NW of Kitumba and returned pyrite rich material in heavily altered syenites, however, little chalcopyrite was observed. Given the depth of the target and lack of copper mineralisation, no further work is recommended.
MUM_S37
MUM_S37, a geophysical target under alluvial (river bed) cover has now been drill tested and returned a barren dioritic intrusive. No further work is recommended.
Target J
Target J was tested with a single RC hole. It is thought possible that this hole did not adequately test the geophysical target at depth and surface soil anomaly. Once all data is returned a more thorough review will be completed.
ATTRIBUTION
The information in this report relating to exploration results at the Mumbwa Project in Zambia is extracted from the report titled "Intrepid Mines Ltd.: Mumbwa Project - Target H Delivers Encouraging Copper and Gold Results", lodged with ASX on 8 July 2015 and "Mumbwa Project: Assays From the First Two Kakozhi Holes Confirm a Separate Mineralised System at The Mumbwa Project" released to the market by Blackthorn Resources on 5 November 2012, and available to view on the Company's website, www.intrepidmines.com.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Estimates or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement.
The information in this report that relates to Exploration Targets at the Mumbwa Project in Zambia is based on information compiled by Mr Michael J Robertson, MSc, Pr.Sci.Nat., MSAIMM, a Competent Person and a Professional Natural Scientist registered with the South African Council for Natural Scientific Professions which is a Recognised Professional Organisation (RPO). Mr Robertson has 24 years' experience in mineral exploration and is a full-time employee of the MSA Group, which has been appointed by Intrepid Mines Ltd. to undertake exploration management and Mineral Resource reporting on the Mumbwa Project. Mr Robertson has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Robertson consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Forward-looking statements
This announcement contains certain forward-looking statements relating to, but not limited to Intrepid's expectations, intentions, plans and beliefs. Forward-looking information can often be identified by forward-looking words such as 'anticipate', 'believe', 'expect', 'goal', 'plan', 'intend', 'estimate', 'may' and 'will' or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future outcomes, or statements about future events or performance. Forward-looking information may include reserve and resource estimates, estimates of future production, unit costs, costs of capital projects, and timing of commencement of operations and is based on current expectations that involve a number of business risks and uncertainties. Factors that could cause actual results to differ materially from any forward-looking statement include, but are not limited to, failure to establish estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from those expressed or implied.
Shareholders and potential investors are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. Intrepid undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.
FOR MORE INFORMATION
Shareholder Enquiries
Matters related to shares held, change of address and tax file numbers should be directed to:
Computershare Investor Services |
GPO Box 2975, Melbourne, Victoria 3001, |
Australia |
Telephone: 1300 805 505 |
+61 3 9415 4000 |
ABN : 11 060 156 452
The documents are available on the Company's website (www.intrepidmines.com.au), and may be reviewed on the ASX website (www.asx.com.au).
Contact
Intrepid Mines Ltd.
Scott Lowe
Chief Executive Officer
(office) +61 2 9357 9000
info@intrepidmines.com
www.intrepidmines.com.au