Ascot Starts Infill Drilling to Determine Bulk Sample Potential at Premier

27.07.2015  |  Marketwire

SURREY, BRITISH COLUMBIA--(Marketwired - Jul 27, 2015) - Ascot Resources Ltd. (TSX VENTURE:AOT) -

Highlights of Release:

  • In 2014 Ascot reported several 1,000 g/t Au intersections, the most spectacular of which was hole P-14-707 which assayed 14,394.5 g/t over .75 of a meter. These 1,000 gram plus intersections are in a zone with a known 50 meter strike length and 50 metre dip length and are approximately a metre thick. As a first step in assessing the potential for the high grade mining of this zone the Company will commence immediately with a 28 hole drill program to establish the continuity of the mineralization. The holes will be drilled from six drill pads on ten metre spacing and will take approximately six weeks to complete.

  • Highlights from the current batch of drill results from the Company's ongoing drill program at Premier include P15-804 which intersected 223.00 g/t Au over 1.07 meters.

The Premier property covers more than one hundred square kilometres near the town of Stewart in northwest BC, and includes the old Premier Mine, a past producer of 2.1 MOz Au and 44.9 MOz Ag.

Work in 2015 is concentrating exclusively on the Premier Mine Area of the property. Historic work and Ascot drilling indicate mineralization is focussed in a structural zone ranging from 30-150 meters in thickness which contains mineralized quartz stockwork, cored by one to four higher grade quartz breccia bodies. Individual quartz breccia zones range in thickness from 2.0-50.0 meters and generally contain higher gold and silver grades along with Pb and Zn values. This system has a known strike length of 1600+ meters and a dip length of up to 1500 meters but a majority of the target area has only been loosely tested from underground, with most work dating back to the 1920-30's. This target area is outside of any of Ascot's present resource areas (Big Missouri, Martha Ellen and Dilworth). This area is a separate system and the priority is to define the potential for higher grade underground mineralization.

New highlights include:

Hole # Zone From m's To m's Width m's Au
(g/t)
Au Cut*
(g/t)
Ag
(g/t)
Zn % Com-ment
P15-789 West Zone 68.20 99.06 30.86 2.05 2.05 6.7 0.35 Hit Stope
incl. 68.20 79.00 10.80 5.17 5.17 14.1 0.65
incl. 72.60 75.80 3.20 13.07 13.07 33.2 1.77
P15-791 West Zone 54.30 99.00 44.70 1.40 1.40 5.3 0.27
incl. 54.30 60.30 6.00 8.70 8.70 21.6 0.95
incl. 55.30 56.30 1.00 23.70 23.70 41.6 0.99
P15-792 Main Zone 303.30 353.00 49.70 1.55 1.55 7.6 0.47
incl. 311.30 323.00 11.70 5.09 5.09 12.5 0.38
incl. 314.80 317.55 2.75 12.06 12.06 26.1 0.67
P15-801 West Zone 83.20 112.50 29.30 4.79 3.89* 22.0 1.28 Hit Stope
incl. 83.20 87.68 4.48 7.78 7.78 15.7 0.82
incl. 83.20 85.20 2.00 14.75 14.75 15.9 0.56
incl. 103.60 108.00 4.40 19.34 13.32* 51.0 2.88
incl. 105.60 106.65 1.05 59.50 34.29* 70.2 1.22
P15-802 West Zone 71.45 80.37 8.92 1.18 1.18 3.5 0.05 Hit Stope
also 107.85 129.00 21.15 0.61 0.61 4.6 0.54
incl. 111.35 114.1 2.75 2.54 2.54 16.4 2.80
also 143.15 162.90 19.75 7.29 5.49* 8.2 0.57
incl. 155.80-160.30 (4.50 m)stope-0 value incl. 148.65 153.15 4.50 30.87 22.96* 24.3 0.95
incl. 148.65 150.15 1.50 54.50 34.29* 27.6 0.40
incl. 151.65 153.15 1.50 37.80 34.29* 40.4 1.73
P15-803 West Zone 67.70 115.44 47.74 1.15 1.15 12.2 0.83 Hit Stope
incl. 93.57 112.90 19.33 2.49 2.49 25.9 1.93
incl. 106.90 108.40 1.50 12.40 12.40 26.9 4.89
P15-804 West Zone 120.90 135.20 14.30 1.86 1.86 34.5 0.33
incl. 124.00 130.00 6.00 3.71 3.71 15.4 0.41
also 157.00 162.35 5.35 44.97 7.23* 75.4 0.30
incl. 159.00 160.07 1.07 223.00 34.29* 147.0 0.86
P15-808 Main Zone 72.96 80.50 7.54 2.09 2.09 54.4 0.52
also 292.00 340.50 48.50 1.14 1.14 7.1 0.61
incl. 316.20 318.90 2.70 2.75 2.75 3.9 0.05
incl. 331.25 336.00 4.75 2.05 2.05 29.1 4.64
P15-809 North-ern Lights 180.50 210.50 30.00 2.76 2.76 10.0 1.79 Hit Stope
incl. 181.50 199.50 18.00 4.33 4.33 15.4 2.89
incl. 181.50 183.50 2.00 12.25 12.25 20.2 2.45
incl. 195.13 198.57 3.44 8.53 8.53 55.9 12.29
P15-813 Main Zone 145.20 150.60 5.40 3.10 3.10 126.7 0.18
incl. 149.20 150.60 1.40 11.00 11.00 448.0 0.47
also 204.60 271.90 67.30 1.35 1.35 12.6 0.44
incl. 218.30 253.00 34.70 2.06 2.06 6.7 0.19
incl. 250.00 253.00 3.00 13.75 13.75 13.0 0.36
P15-814 Main Zone 217.60 324.05 106.45 1.65 1.62* 6.6 0.25
incl. 270.00 314.60 44.60 3.44 3.36* 10.8 0.54
incl. 275.10 283.05 7.95 8.59 8.15* 25.9 1.08
incl. 275.10 276.00 0.90 23.10 23.10 36.30 0.61
incl. 282.24 283.05 0.81 38.60 34.29* 123.0 7.03
P15-817 Main Zone 279.43 340.80 61.37 1.55 1.55 3.9 0.09
incl. 319.50 340.80 21.30 3.75 3.75 5.5 0.18
incl. 323.85 325.30 1.45 13.75 13.75 6.6 0.11

True widths are generally believed to be 70-90% of intersected widths in the Premier area.

(*) samples cut to 1opt or 34.29 g/t Au.

This release covers results for a second set of 29 holes P15-789 to P15-817. The first set of 33 holes was released on June 24th, 2015. Drilling continues with one diamond drill rig, results will be released as they become available. Ascot to date has drilled 19,594 meters in 82 holes in 2015 with drilling ongoing. Detailed results table, locations and figures can be viewed at the following Ascot link: www.ascotresources.ca

Graeme Evans, P. Geo and Lawrence Tsang, P. Geo are providing the field management for the Premier exploration program. Graeme Evans, designated as the Qualified Person (QP) as defined by National Instrument 43-101 has prepared the technical information in this news release.

Quality Assurance/Quality Control

Analytical work is being carried out by ALS Lab Group. Quality assurance and quality control programs include the use of analytical blanks and standards and duplicates in addition to the labs own internal quality assurance program. All samples were analyzed using multi-digestion with ICP finish and fire assay with AA finish for gold. Samples over 100 ppm silver were reanalyzed using four acid digestion with an ore grade AA finish. Samples over 1,500 ppm silver were fire assayed with a gravimetric finish. Samples with over 10 ppm gold were fire assayed with a gravimetric finish. Identified or suspected metallic gold or silver are subjected to "metallics" assays. Sampling and storage are at the company's secure facility in Stewart with bi-weekly sample shipments made to ALS Labs Terrace prep site.

On Behalf of the Board of Directors

Ascot Resources Ltd., John A. Toffan, President and Director

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release.

Cautionary Statement Regarding Forward-Looking Information

All statements, trend analysis and other information contained in this press release relative to markets about anticipated future events or results constitute forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions. All statements, other than statements of historical fact, included herein, including, without limitation; statements regarding the exploration and mineralization potential of the Premier property, are forward-looking statements. Forward-looking statements are subject to business and economic risks and uncertainties and other factors that could cause actual results of operations to differ materially from those contained in the forward-looking statements. Important factors that could cause actual results to differ materially from Ascot's expectations include fluctuations in commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; the need for cooperation of government agencies and native groups in the exploration and development of properties and the issuance of required permits; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs and uncertainty of meeting anticipated program milestones; and uncertainty as to timely availability of permits and other governmental approvals. Forward-looking statements are based on estimates and opinions of management at the date the statements are made. Ascot does not undertake any obligation to update forward-looking statements except as required by applicable securities laws. Investors should not place undue reliance on forward-looking statements.



Contact

Ascot Resources Ltd.
Bob Evans
(604) 379-1170
www.ascotresources.ca


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Ascot Resources Ltd.
Bergbau
906170
CA04364G1063
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.