• Freitag, 15 November 2024
  • 05:44 Uhr Frankfurt
  • 04:44 Uhr London
  • 23:44 Uhr New York
  • 23:44 Uhr Toronto
  • 20:44 Uhr Vancouver
  • 15:44 Uhr Sydney

Carlisle Announces High Grade Exploration Drill Results Outside the Feasibility Study Area at Lynn Lake

10.06.2015  |  GlobeNewswire
TORONTO, June 10, 2015 (GLOBE NEWSWIRE) -- Carlisle Goldfields Ltd. ("Carlisle" or the "Company") (TSX:CGJ) is pleased to announce interim assay results from multiple horizons in the first 5 holes on its 2015 "Special Exploration" drill program outside the Feasibility Study area on Lynn Lake Joint Venture (""LLJV") ground at Lynn Lake, Manitoba. Drill hole DV15-04 intersected 1.63 grams per tonne ("g/t") gold ("Au") over 10.6 m between 35.6 m to 46.2 m and 5.63 g/t Au over 5.6m between 150.8 to 156.4m downhole, including 24.49 g/t Au and 59.0 g/t silver over 0.69 m.

Carlisle's partner AuRico Gold ("AuRico") has a 25% interest in the LLJV and has the right to increase its interest to 51% by spending CAD$20 million on the advancement of a Feasibility Study by November 10, 2017. AuRico may increase its interest in the LLJV to a maximum of 60% by delivering a compliant Feasibility Study within the same period.

The partners are jointly funding a CAD$4 million Special Exploration program outside the Feasibility Study area in calendar 2015. Carlisle is the Operator of Special Exploration on the balance of the 35,000 hectare LLJV lands. An internal GIS database compilation of historical drilling and sampling results is a useful guide to further exploration work in the area. Two historic drill holes in the Maynard Lake area reported an intersection of 0.93g/t Au over 13.2m. These results are historical in nature, have no core available for resampling, are of uncertain location and should not be relied upon.

Carlisle's President and CEO, Abraham Drost commented that: "Assays from the first 5 holes in the 2015 Special Exploration drill program have highlighted the potential for high grade shoots that may exist to the west of the Burnt Timber and Linkwood deposits along the Johnson Shear and related splay structures. It is our hope that the Burnt Timber and Linkwood and possibly other gold deposits identified in this area will ultimately be subjected to a feasibility study to assess future production potential."

Table 1: Special Exploration Results from the Dunvegan Area (see Figure 1)
Area Hole From
(m)
To
(m)
Drill Interval
(m)
Au Grade
g/t
Johnson Shear DV15-01 172.00 173.33 1.33 0.92
Johnson Shear DV15-02 199.40 214.26 14.86 0.41
Johnson Shear DV15-03 209.00 220.00 11.00 0.71
DV15-04 35.60 46.20 10.60 1.64
Maynard Lake including 150.80 156.40 5.60 5.63
including 154.80 155.49 0.69 24.49
Maynard Lake DV15-05 107.46 112.00 4.54 5.04
including 109.81 110.34 0.53 24.13
NB. Exploration drill results highlighted use a cut-off grade of 0.20 g/t Au.
True width calculations are indeterminate at this time.


QA/QC

Carlisle's exploration programs are carried out under the supervision of Peter Karelse P.Geo., Vice-President of Exploration, a Qualified Person as defined by NI 43-101, who reviewed and approved the technical content of this press release.

Samples were transported directly in secure containers from the Carlisle Goldfields site in Lynn Lake, Manitoba, to the TSL Laboratories in Saskatoon, Saskatchewan. TSL, which is an accredited ISO/IEC 17025 lab, assayed the samples using standard fire assay methods with a gravimetric finish. Certified standards are placed in the sample stream at a rate of one standard per 20 samples. Certified blanks are placed in the sample stream at a rate of one blank every 40 samples. One lab reject duplicate per 30 samples is submitted to an umpire lab for assay verification. Results are analyzed for acceptance at the time of import. All standards associated with the results in this press release were determined to be acceptable within the defined limits of the standard used.


Special Exploration Program on LLJV Lands

Carlisle previously announced the commencement of a 3,500m drill program in the Dunvegan area along strike to the west of the Linkwood and Burnt Timber deposits on the Johnson Shear structure within the Lynn Lake greenstone belt. The Burnt Timber deposit has a previously reported (December 2, 2013) Inferred open pit-constrained mineral resource of 23.4 million tonnes at an average grade of 1.04g/t gold and the Linkwood deposit has an Inferred open pit-constrained mineral resource of 21.0 million tonnes at an average grade of 1.16 g/t gold.

The LLJV has conducted a high-resolution magnetic and electromagnetic airborne geophysical survey over the entire property and are currently conducting an Induced Polarization (IP) ground survey to assist with drill target identification. Structural analysis of the airborne geophysical data has been completed by SRK Mining Consultants. Drill targets have been selected through a ranking system evaluating favourable structural and lithological targets identified in the new airborne and ground geophysics coincident with historical gold occurrences in the belt.

Two geological/prospecting field crews will also be on the LLJV lands this summer evaluating a variety of historical gold occurrences for future drill testing.


About Carlisle:

Carlisle Goldfields Ltd. is a gold exploration and development company focused on development of its Lynn Lake Gold Camp in Lynn Lake, Manitoba, Canada. Carlisle has NI 43-101 compliant mineral resource estimates on five (5) deposits within its Lynn Lake Gold Camp, four of which form the basis for the December, 2013 PEA (Farley Lake Mine Deposit, MacLellan Mine Deposit, Burnt Timber Mine Deposit, and Linkwood Deposit).

The results of the subsequent Preliminary Economic Assessment reported on February 27, 2014 focused on an open pit mining and processing model for the historical Farley Lake Mine and MacLellan Mine deposits. The latter is the starting point for further feasibility level engineering and development work by the Lynn Lake Joint Venture with AuRico as Operator.

Carlisle's objective, together AuRico, its government, municipal and First Nation project stakeholders, is to efficiently advance the Lynn Lake Gold Camp Project through feasibility study, environmental and mine permitting to set the stage for resumption of gold production in the historical Lynn Lake mining camp, Manitoba.

The Special Exploration program is being carried out under the supervision of Ryan Weston, M.Sc. P.Geo., Chief Geologist for Carlisle Goldfields Ltd. and a Qualified Person as defined by NI 43-101, who has reviewed and approved the technical content of this press release.

Further details including mineral resource technical reports are available on SEDAR (www.sedar.com) or carlislegold.com/resource-summary.php

To view an image of Figure 1: Drill hole locations DV15-01 to -05, please visit:
http://orders.newsfilecorp.com/files/744/15790_enhancedx3x1.jpg

To view an image of Carlisle Property Position, please visit:
http://orders.newsfilecorp.com/files/744/15790_enhancedx4x1.jpg



FOR FURTHER INFORMATION PLEASE CONTACT BELOW

Carlisle Goldfields Ltd.
2702 – 401 BAY STREET
TORONTO, ONTARIO, CANADA
info@carlislegold.com
www.carlislegold.com

Nicholas Konkin
Director of Investor Communications
416-642-0869 ext. 3 or nk@carlislegold.com

Abraham Drost, President & CEO
807-252-7800 or adrost@carlislegold.com



This press release shall not constitute an offer to sell or solicitation of an offer to buy the securities in any jurisdiction. The Company's shares and other securities have not been and will not be registered under the United States Securities Act of 1933 and may not be offered or sold in the United States absent an applicable exemption from the registration requirements.

Except for statements of historical fact contained herein, the information in this press release may constitute "forward-looking information" within the meaning of Canadian securities law. Other than statements of historical fact, all statements are "forward-looking statements", including the establishment and estimate of resources that involve various known and unknown risks and uncertainties and other factors. There can be no assurance that such statements will prove accurate. Results and future events could differ materially from those anticipated in such statements. Readers of this press release are cautioned not to place undue reliance on these "forward-looking statements". Except as otherwise required by applicable securities statutes or regulation, Carlisle expressly disclaims any intent or obligation to update publicly forward-looking information, whether as a result of new information, future events or otherwise.

Neither IIROC nor the TSX accepts responsibility for the adequacy or accuracy of this press release.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Carlisle Goldfields Ltd.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.