• Donnerstag, 26 Dezember 2024
  • 05:09 Uhr Frankfurt
  • 04:09 Uhr London
  • 23:09 Uhr New York
  • 23:09 Uhr Toronto
  • 20:09 Uhr Vancouver
  • 15:09 Uhr Sydney

BK Copper Project – First Assay Results Confirm Potential

13.05.2015  |  FSCwire

Vancouver, British Columbia (FSCwire) - Kalimantan Gold Corporation Ltd. ("KLG") is pleased to announce assay results from the first four holes drilled at its flagship Beruang Kanan copper project in 2015.  As previously reported the first four holes drilled on section lines BKM32450 and BKM31750 intersected visual near surface copper mineralization predominately hosted in stock work fractures and quartz veins, and as open space fill. 

RESULTS

Final assays were received for a total of 323.1 meters in the four drill holes reported to date. A drill hole location plan and a table of full assay results are provided in Figure 1 and Table 1 respectively.

Hole BKM32450-01 (92.4m end of hole (“EOH”)) drilled as an infill hole on section line BKM32450 intersected strong near surface copper mineralization in brecciated and silicified volcaniclastic rocks.  Three wide intervals of mineralization were reported as follows:

14 meters at 2.02% Cu (from 4.7 meters depth)

  • Including 6.0 meters at 3.71% Cu (from 4.70 meters)

22 meters at 0.88% Cu (from 32.0 meters depth)

  • Including 5.0 meters at 1.10% Cu (from 35.0 meters)
  • Including 6.0 meters at 1.57% Cu (from 45.0 meters)

15 meters at 0.57% Cu (from 76.0 meters depth)

BKM32450-02 (70.6m EOH) also drilled as an infill hole on section line BKM32450 hit a post mineral dyke and failed to intersect the key target zone of mineralization.  Three narrow mineralized intervals were intersected; including a small interval assaying 2m at 2.08% Cu (from 49.5 meters depth).

Hole BKM31750-01 (75.1m EOH) drilled on section line BKM31750 intersected a cumulative 23m interval (over 3 individual intersections) of highly elevated copper mineralization in centimeter to meter scale quartz veins. Better assays received from this interval include 9.0 meters at 0.73% Cu (from 19.0 meters depth) and 10.0 meters at 0.57% Cu (from 41.0 meters depth).

BKM31750-02 (85.0m EOH) also collared as an infill hole on section line BKM31750 intersected a broad zone of copper mineralization comprising covellite and chalcocite in centimeter scale quartz veins and zones of strong silicification. Copper mineralization is more pervasive than previous holes located nearby and extends beyond the current limits of the BKM deposit. Better results include:

54 meters at 1.10% Cu, (from 16.5 meters depth)

  • Including 16 meters at 1.67% Cu (from 17.5 meters)
  • Including 19 meters at 1.22% Cu (from 37.5 meters)

The drilling program planned for the Beruang Kanan Main deposit (BKM) in 2015 is designed to increase confidence and expand the deposit beyond the known resource.   The first four holes have confirmed continuity of mineralization on each section line and drill hole BKM31750-02 indicates copper mineralization is potentially more pervasive in the southern part of the BKM deposit than previously recognized. 

The potential for additional mineralization in the southern part of the BKM deposit is also supported by recent field mapping which identified strong veining and stockwork copper mineralization in sub-crop and outcrop over more than 400 meters to the west of drill hole BKM31750-02. Further drilling is planned to fully define the extent of mineralization in this area.

Resource in-fill and expansion drilling is continuing on both of the section lines reported above. At least seven holes are planned on line BKM32450 and ten holes on line BKM31750.   Once these two sections are completed, drilling will move to section lines BKM31650 and BKM32350 located 100m to the south of current drilling.  A list of drill hole details is provided in Table 2.

Tony Manini, Kalimantan Gold’s Chief Executive Officer commented:

“We are very pleased with the initial assay results from the 2015 drill program at the BK project. The continuity of copper mineralization observed to date has fully met our expectations and we have already identified an area to the south of current drilling with potential to further expand the BKM deposit. We have a comprehensive program of drilling and test work proposed for the BKM deposit and nearby prospects in 2015 and we look forward to progressively reporting further results as they become available”

HOLE ID

From

To

Length

Copper (%)

BKM31750-01

19.0

28.0

9.0

0.73

BKM31750-01

41.0

51.0

10.0

0.57

BKM31750-01

66.0

70.0

4.0

0.59

BKM31750-02

1.5

6.5

5.0

0.93

BKM31750-02

16.5

70.5

54.0

1.10

Including

17.5

33.5

16.0

1.67

Including

37.5

56.5

19.0

1.22

BKM32450-01

4.7

18.7

14.0

2.02

Including

4.7

10.7

6.0

3.71

BKM32450-01

32.0

54.0

22.0

0.88

Including

35.0

40.0

5.0

1.10

Including

45.0

51.0

6.0

1.57

BKM32450-02

8.1

10.1

2.0

0.49

BKM32450-02

31.5

39.5

8.0

0.46

BKM32450-02

49.5

51.5

2.0

2.08

Table 1: Significant drill intercepts. 

Notes: Grade intercepts are calculated as a weighted average grade above 0.3% copper. 

          Maximum internal waste of 3m.

          True widths are interpreted to be between 80-100% of the reported lengths, unless otherwise stated.     

To view the graphic in its original size, please click here

    

Figure 1: Location map showing section lines and drill collars

Hole ID

Easting

Northing

RL

Depth

Azi

Dip

Status

Assays

BKM31750-01

769102

9931750

363

75.1

270

-60

Complete

Final Assays Confirmed

BKM31750-02

769006

9931750

397

85.0

270

-60

Complete

Final Assays Confirmed

BKM32450-01

768845

9932450

423

92.4

270

-60

Complete

Final Assays Confirmed

BKM32450-02

768746

9932450

443

70.6

270

-60

Complete

Final Assays Confirmed

 

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Asiamet Resources Ltd.
Bergbau
A14XBY
BM04521V1038
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.