Forsys Releases Feasibility Study Results for Norasa Uranium Project in Namibia
TORONTO, ONTARIO--(Marketwired - Mar 18, 2015) - Forsys Metals Corp. (TSX:FSY)(FRANKFURT:F2T)(NAMIBIAN:FSY) ("Forsys" or the "Company") is pleased to announce the results of a Feasibility Study1 ("FS") for its wholly-owned Norasa Uranium Project ("Norasa") located in the Erongo region of Namibia. The FS completed by engineering consultants, Amec Foster Wheeler together with reliance on other experts in the fields of mining and environment and Company Qualified Persons, has confirmed the robustness and economics of Norasa. All amounts are in US currency. A copy of the FS can be found under Forsys' filings on SEDAR.
Highlights of the FS:
"Norasa is one of the very few uranium projects in the world that is construction ready with a Mining Licence," said Marcel Hilmer, CEO of Forsys Metals. "The completion of the FS confirms the robustness of Norasa's economics. The FS delivered a number of outstanding results, including increases in tonnage, annual and life of mine production whilst lowering operating costs. We believe that the study results will attract strategic partners and investors, and provide us with alternatives for the next phase of Norasa's development."
1 The Feasibility Study cannot be classified as a "definitive feasibility study" under NI 43-101 disclosure standards, but represents the definitive basis by which Forsys intends to seek to develop the Norasa Project, and has been conducted to an accuracy of +/-15% for Class 3 Capital and Operating Cost estimates.
The Mineral Reserve estimate is summarised in Table 1.
Table 1. Reserves Estimate (February 2015) | |||
Classification | Tonnes [M] | U3O8[ppm] | U3O8[Mlbs] |
Proven | 16 | 200 | 7.1 |
Probable | 190 | 200 | 83.6 |
Total Reserve | 206 | 200 | 90.7 |
Cut-off grades of 100ppm for Valencia and 140ppm Namibplaas |
The Mineral Resource estimate is summarised in Table 2.
Table 2. Norasa Mineral Resource Summary (February 2015) | |||
Category | Tonnes [M] | U3O8[ppm] | U3O8[Mlbs] |
Measured | 16 | 200 | 7 |
Indicated | 249 | 196 | 108 |
Measured + Indicated | 265 | 197 | 115 |
Inferred | 26 | 200 | 11 |
Cut-off grades of 100ppm for Valencia and 140ppm Namibplaas |
Resources are reported inclusive of Reserves |
Mineral Resources that are not Reserves either haven't demonstrated economic viability or don't meet the cut-off grade criteria. The Reserves come from three deposits, resulting in three distinct pits: the Valencia pit, a small satellite pit adjacent to Valencia and the Namibplaas pit.
Key Financial Model Outputs
The key outputs from the financial model are reported for the first 5 years of the modelled operation and for the life of mine in Table 3.
Table 3. Key Financial Model Outputs | |||
Project | |||
Project Economics | |||
NPV at a Discount Rate of 8% (USD Millions) - (Excl. Tax) | $622.6 | ||
- (Incl. Tax) | $383.4 | ||
Internal Rate of Return (%) - (Excl. Tax) | 32% | ||
- (Incl. Tax) | 26% | ||
Payback Period from Start of Production (years) | 4.4 | ||
Capital Costs (USD Millions) | $432.8 | ||
Production | Life of Mine | First 5 Years | |
Quantity Ore Treated (Million tonnes) | 206.1Mt | 66.7Mt | |
Recoveries (%) | 92.4% | 92.2% | |
Uranium sold (Kg U3O8) | 35,288Kg | 11,710Kg | |
Uranium sold (Million lbs U3O8) | 77.8Mlb | 25.8Mlb | |
Revenue and Cash Flow | |||
U3O8Base Price (USD/lb U3O8) | $65/lb | $65/lb | |
Net Revenue (USD Millions) | $5,056 | $1,678 | |
Operating cash flow (USD Millions) | $1,751 | $440 | |
Net cash flow after tax (USD Millions) | $1,007 | $165 | |
Operating Unit Costs (USD /lb produced) | |||
Mining | $16.83/lb | $14.65/lb | |
Processing | $16.27/lb | $16.67/lb | |
Owners costs | $1.63/lb | $1.65/lb | |
Total Operating Costs | $34.72/lb | $32.96/lb | |
Sensitivity Analysis
The financial sensitivity analysis further reflects the robustness of the project as detailed in Table 4. The project is most sensitive to changes in the uranium price. A decrease of 8% or more from the base case assumption of $65/lb U3O8, results in a measurable decline in Pre and Post-tax NPV (DR 8%). Conversely, the Project would benefit greatly from increases in U3O8 prices above the base case assumption. It is encouraging that break-even NPV is at or about $50/Lb U3O8 for both pre and post-tax scenarios.
Capital costs are least sensitive to change and although the project is sensitive to changes in operating costs, increases in the base case operating cost assumptions produce changes in the pre and post-tax NPV's that remain positive at even the highest sensitivity of -30%.
Table 4. Sensitivity Analysis (Pre and Post-tax Basis) | ||||||||
Parameter/ Variation | Value | Pre-tax NPV ($M. DR 8%) | Post-tax NPV ($M. DR 8%) | |||||
U3O8Price | U3O8Price ($/lb) | |||||||
-23% | 50.00 | 70.1 | 17.7 | |||||
-15% | 55.00 | 254.2 | 143.5 | |||||
-8% | 60.00 | 438.4 | 264.6 | |||||
Base | 65.00 | 622.6 | 383.4 | |||||
8% | 70.00 | 806.7 | 500.6 | |||||
15% | 75.00 | 990.9 | 617.4 | |||||
23% | 80.00 | 1175.0 | 733.3 | |||||
Capital Costs | Capital Cost ($M) | |||||||
-30% | 561.60 | 562.6 | 321.9 | |||||
-20% | 518.40 | 582.6 | 342.5 | |||||
-10% | 475.20 | 602.6 | 363.0 | |||||
Base | 432.00 | 622.6 | 383.4 | |||||
10% | 388.80 | 642.6 | 406.9 | |||||
20% | 345.60 | 662.6 | 436.9 | |||||
30% | 302.40 | 682.6 | 466.9 | |||||
Operating Costs | Average Operating Costs ($/lb) | |||||||
First 5 Years | Life of Mine | |||||||
-30% | 42.85 | 45.14 | 203.5 | 122.2 | ||||
-20% | 39.56 | 41.66 | 343.2 | 211.3 | ||||
-10% | 36.26 | 38.19 | 482.9 | 298.0 | ||||
Base | 32.96 | 34.72 | 622.6 | 383.4 | ||||
10% | 29.67 | 31.25 | 762.2 | 473.2 | ||||
20% | 26.37 | 27.78 | 901.9 | 562.5 | ||||
30% | 23.08 | 24.30 | 1041.6 | 651.0 |
The FS assumes a schedule of approximately 24 months from the start of detailed engineering to the commencement of plant production. While this timeline is predicated on confirmation of suitable financing for the Project, Forsys expects to optimize this timeframe during the detailed engineering phase.
Namibia
Namibia is a mining friendly jurisdiction that is consistently ranked highly for its investment attractiveness by the Fraser Institute; currently ranked first for mining in Africa. Namibia has a long history of uranium mining and ranks as the world's fifth largest uranium producer. Norasa, Forsys' uranium project, is located approximately 35km from the Rossing Mine, one of the largest uranium mines in the world.
Qualified Persons
Amec Forster Wheeler
Forsys
About Forsys Metals Corp.
Forsys Metals Corp. is an emerging uranium producer with 100% ownership of the Norasa project that comprises the fully permitted Valencia uranium project and the Namibplaas uranium project in Namibia, Africa a politically stable and mining friendly jurisdiction. Information regarding current National Instrument 43-101 compliant Resource and Reserves at Valencia and Namibplaas are available on the Company website. Shares outstanding: 119.3M
Forward-Looking Information
This news release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. The following are important factors that could cause Forsys actual results to differ materially from those expressed or implied by such forward looking statements: fluctuations in uranium prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology; continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; recovery rates, production estimates and estimated economic return; general market conditions; the uncertainty of future profitability; and the uncertainty of access to additional capital. Full description of these risks can be found in Forsys Annual Information Form available on the Company's profile on the SEDAR website at www.sedar.com. These risks and uncertainties could cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from anticipated in such information. These and all subsequent written and oral forward looking information are based on estimates and opinions of management on the dates they are made and expressed qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change.
The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Sedar Profile #00008536
Contact
Forsys Metals Corp.
Marcel Hilmer
Chief Executive Officer
+61 417 177 942
mhilmer@forsysmetals.com
www.forsysmetals.com
TMX Equicom
Joe Racanelli
+1 416-815-0700 Ext 243
jracanelli@tmxequicom.com