• Donnerstag, 26 Dezember 2024
  • 18:56 Uhr Frankfurt
  • 17:56 Uhr London
  • 12:56 Uhr New York
  • 12:56 Uhr Toronto
  • 09:56 Uhr Vancouver
  • 04:56 Uhr Sydney

Highbank -- Swamp Point North Site Update

06.11.2014  |  Marketwire

VANCOUVER, BC--(Marketwired - November 06, 2014) - Highbank Resources Ltd. (the "Company") (TSX VENTURE: HBK).

President/CEO Victor Bryant reports.

Highbank's crew have moved the wash/screening plant and cone crusher to their final operational location adjacent to the Swamp Point North ("SPN") deposit. The task of moving the plant from sea level up 200 feet through three switchbacks was a difficult move. The wash plant and cone crusher (a +$400,000 piece of equipment) weighing approx. 80,000 lbs required careful handling. To ensure the safety of the crew and the equipment, Highbank barged in additional equipment for this move. A specialized semi-trailer tow truck was employed to act as a brake should the plant lose its purchase on the steep slope. Further specialized air bags were employed to alleviate any offsetting forces while an excavator traveled alongside ensuring no side forces deterred progress.

Over the course of the week a journeyman electrician will be powering up both the wash plant and the conveyor barge load-out facility. The power will come from two separate generators; one to supply the wash plant and the second for the barge loading conveyor facility.

Victor Bryant comments?"At this juncture I would like to apologize on behalf of myself, the management, contractors and employees for the delay in the SPN production timetable. Extreme weather conditions directly impacted our proposed plans, both in the removal of the overburden and the installation of key equipment. Of paramount importance in all our endeavours on the SPN project is the safety of all contractors, employees and equipment. The Company will not compromise these criteria now, or in the future."

It is anticipated that improved weather conditions forecast for November will assist in preparing the settling ponds for collection of the wash plant water sprays and enable the roads to be improved for hauling aggregate to the load-out hopper. Achievement of these objectives will regain some of the time lost as we progress towards our final goal.

Loan-Bonus Shares

Further to the TSX Venture Exchange acceptance for filing bulletin of October 27, 2014, the Company has issued a total of 227,273 bonus shares at a deemed price of $0.22 to various arm's length parties in consideration of loans advanced totaling $500,000. The shares are subject to a hold period from trading until February 28, 2015.

On behalf of the Board of Directors of HIGHBANK RESOURCES LTD.

Victor N. Bryant, CEO/President

This News Release may contain forward-looking statements based on assumptions and judgments of management regarding future events or results that may prove to be inaccurate as a result of exploration and other risk factors beyond its control, and actual results may differ materially from the expected results.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contact

Highbank Resources Ltd.
#600 - 625 Howe Street, Vancouver, B.C.
V6C 2T6
Ph: (604) 683-6648
Fax: (604) 683-1350
E-Mail: highbank@telus.net
www.highbankresources.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Highbank Resources Ltd.
Bergbau
A3DMJA
CA42982U2065
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.