• Freitag, 15 November 2024
  • 10:38 Uhr Frankfurt
  • 09:38 Uhr London
  • 04:38 Uhr New York
  • 04:38 Uhr Toronto
  • 01:38 Uhr Vancouver
  • 20:38 Uhr Sydney

Glen Eagle Resources Inc.: Advancing the Authier Lithium Project

11.09.2014  |  Marketwire

MONTREAL, QUEBEC--(Marketwired - Sep 11, 2014) - Glen Eagle Resources Inc. (TSX VENTURE:GER) ("Glen Eagle" or the "Company") is pleased to announce an upcoming drill program on its Authier Lithium project near Val d'Or, Quebec. The program is aiming at a minimum of 2,000 meters of drilling and will be based on the recommendations made in the Pre Economic Assesment Report (PEA) and the Environmental Study elaborated by the Dessau Group. The Authier Project was defined as having a 10 year mine life at a production rate of 2,200 tons per day to make a spodumene concentrate (6% Li2O) from the mineral resources (measured/indicated) contained in the open pit structural design based on a Lerchs-Grossmann optimized pit shell. Some of the best values and widths were intercepted in previous drilling at a depth of 100 meters. The upcoming drill program will be designed to verify the potential for enrichment of the deposit at depth of 100 to 150 meters while testing the along strike and down‐dip extension of the mineralized pegmatite dyke. Additional metallurgical testing will be undertaken on representative mineralized sample in order to validate the historical recovery rate and concentrate grade reported in previous metallurgical tests to better refine the concentration flowsheet using the latest metallurgical technology. The tests will also verify if the spodumene concentrate is amenable to lithium metal (Li) which would bring an important added value to the project.

By implementing the above, the company is complying with several recommendations made by SGS Canada Inc in their PEA to advance the Authier Lithium Project one step closer towards a Feasibility Study and supports the company's past and present vision to advance a project based on a commodity with good growth potential.

As for the La Libertad gold project in Nicaragua, the Company will soon bring an update on some important and positive developments currently in progress.

Gilles Laverdière, P.Geo., a qualified person under NI 43-101 has approved the technical content presented herein.

For the latest information about Glen Eagle, please visit www.gleneagleresources.com.

"Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release."



Contact

Glen Eagle Resources Inc.
Jean Labrecque
President
450-229-4488
www.gleneagleresources.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Glen Eagle Resources Inc.
Bergbau
A0Q9R9
CA3774561086
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.