Rugby Mining Limited: Drilling Update Great Northern Gold Project, Pilbara, Australia
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jul 28, 2014) - Rugby Mining Ltd. ("Rugby" or the "Company") (TSX VENTURE:RUG) is pleased to announce preliminary high grade gold results from the recently completed diamond drilling program at the Great Northern Gold Project in the Pilbara region of Western Australia.
The initial drilling program was conducted at the early stage Berghaus prospect, located approximately 9 kilometres to the northwest of Wingina. (Figure 1). Eight shallow holes for a total of 640 metres ("m") were drilled along 750 m of strike to target high grade gold mineralization associated with a series of northeast-trending structures in meta-sedimentary rocks. Two of the eight holes intersected visible gold mineralization. Preliminary gold assays have been received for all the drill holes and significant drill results include:
- RDD001 0.5m @ 11.9 g/t gold from 47.2m
- RDD002 1.0m @ 17.4 g/t gold from 15.5m
- RDD003 3.4m @ 6.25 g/t gold from 20.1m
- RDD006 1.4m @ 16.1 g/t gold from 63.2m
- RDD008 0.5m @ 10.7 g/t gold from 43.0m
Please click here for a plan locating all drill holes (Figure 2), for all significant drill intercepts above 1.0 g/t gold, and for drill hole details. All results are preliminary as assays are being verified and check samples are currently being assayed at another independent laboratory.
Rugby's CEO, Paul Joyce stated "We are encouraged by our initial program at Berghaus. We have both delineated high grade mineralization and are close to meeting the minimum expenditure requirement for the project by drilling holes previously permitted by our joint venture partner. Further drilling at Berghaus will now follow drilling at our top priority target, Wingina. Our objective at Wingina, is to test for potential depth extensions to the very high grade footwall gold zone (Figure 3). We believe that the host rocks are favourable for extensions of the high grade to significant depths. A 2,000 m drilling program is expected to commence early Q4, subject to permitting and drill rig availability.
Previous operators established a historical mineral resource at Wingina however, the resource was not completed in compliance with National Instrument 43-101 ("NI 43-101") consequently the Company is not reporting any resource estimates prior to further evaluation. We plan to work with independent consultants to upgrade the historical mineral resource at Wingina to NI 43-101 requirements. Under our JV agreement the Company has an option to purchase 80% of the historical resource by 2018."
Quality Control and Assurance
Blanks and certified standards were inserted into the sample stream as part of Rugby's quality assurance and control program, which complies with NI 43-101 requirements. Core samples were cut in half-lengths using a diamond saw, with one half retained in secure storage for logging, and the other half sent to ALS Laboratory Services lab in Perth, Western Australia for mineral analyses. All samples were prepared using ALS' PREP-31B method (drying, crushing, and pulverizing), and assaying for gold by ALS' Au-AA26 technique in which a 50g charge was split from each sample for fire assay with an AAS finish. Check-assaying is currently underway at Intertek-Genalysis Laboratory Services, Perth. Both ALS and Intertek are independent and ISO-9001:2000 certified laboratories with no association to Rugby. For more information on Quality Control and Assurance please click here.
Update: Cobrasco Project, Colombia
Water permits for the proposed drilling program were recently granted. The permits are valid for a five year period. The forestry extraction permit, the final step in the drill permitting process, is currently being processed by the Ministry of Environment with approval expected before year end.
Francisco Montes, Rugby's Chief Geologist and a "qualified person" ("QP") within the definition of that term in National Instrument 43-101, Standards of Disclosure for Mineral Projects, has verified the technical information that forms the basis for this news release
About Rugby
Rugby is an emerging mineral resource company focussed on a portfolio of projects having considerable potential for significant mineral discoveries. Rugby benefits from the experience of its directors and management, a team that has either been directly responsible for world-class mineral discoveries or have been part of the management teams responsible for such discoveries.
Cobrasco and Comita Projects, Colombia: Rugby owns 100% of the Cobrasco project, subject to a 1% NSR and has an option to earn up to 60% of the adjacent Comita project in western Colombia. Both projects host undrilled large scale porphyry copper-molybdenum-gold targets which were recognised during a joint German-Colombian government sponsored exploration program over 30 years ago. No systematic exploration or drilling has been conducted since that time. Rugby currently awaits final permitting approval for a proposed drilling program at Cobrasco. Discussions have commenced with local drilling companies for a drilling campaign in late in 2014.
Mabuhay Project, Philippines: The Company holds an option to acquire up to 80% of the Mabuhay project in Surigao Province. The Company considers the project to have excellent potential for the discovery of both epithermal gold deposits and gold-copper porphyry systems. An application for an Exploration Permit ("EP") is currently awaiting approval. Unfortunately, in common with almost all other mining permits in the Philippines, the delay has been considerable. To minimise expenditures, the project will remain under care and maintenance until the EP is granted.
For additional information you are invited to visit the Rugby Mining Ltd. website at www.rugbymining.com.
RUGBY MINING LIMITED
Paul Joyce, President and CEO
CAUTIONARY STATEMENT
Certain of the statements made and information contained herein is "forward-looking information" within the meaning of the British Columbia, Alberta and Ontario Securities Acts. This includes statements concerning the Company's plans at its projects including the expected approval of permits required for exploration, timing of drilling programs, high grade potential at the Great Northern Gold Project, potential for mineral discoveries on its projects and drilling costs which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Forward-looking information is subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, the effect on prices of major mineral commodities such as copper, gold and iron by factors beyond the control of the Company; events which cannot be accurately predicted such as political and economic instability, terrorism, environmental factors and changes in government regulations and taxes; the shortage of personnel with the requisite knowledge and skills to design and execute exploration programs; difficulties in arranging contracts for drilling and other exploration services; the Company's dependency on equity market financings to fund its exploration programs and maintain its mineral exploration properties in good standing; political risk that a government will change, interpret or enforce mineral tenure, environmental regulations, taxes or mineral royalties in a manner that could have an adverse effect on the Company's assets or financial condition and impair its ability to advance its mineral exploration projects or raise further funds for exploration; risks associated with title to resource properties due to the difficulties of determining the validity of certain claims as well as the potential for problems arising from the interpretation of laws regarding ownership of mineral properties in the Philippines and in the sometimes ambiguous conveyancing characteristic of many resource properties, currency risks associated with foreign operations, the timing of obtaining permits to conduct exploration activities, the ability to conclude agreements with local communities and other risks and uncertainties, including those described in each of the Company's management discussion and analysis including those contained in its year-end financial statements for the year ended February 28, 2014 filed with the Canadian Securities Administrators and available at www.sedar.com.
In addition, forward-looking information is based on various assumptions including, without limitation, assumptions associated with exploration results and costs and the availability of materials and skilled labour. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information, whether as a result of new information, future events or otherwise.
EITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
Contact
Rugby Mining Ltd.
Paul Joyce
President and CEO
604.688.4941 or Toll-free: 1.855.688.4941
604.688.9532
info@rugbymining.com