Castle Mountain Mining Files Preliminary Economic Assessment on the Castle Mountain Mine and Starts Phase II Drill Program
TORONTO, ONTARIO--(Marketwired - Jun 5, 2014) - Castle Mountain Mining Company Ltd. ("Castle Mountain" or the "Company") (TSX VENTURE:CMM) is pleased to announce that it has filed a technical report ("the report") entitled "TECHNICAL REPORT ON THE PRELIMINARY ECONOMIC ASSESSMENT FOR CASTLE MOUNTAIN PROJECT, SAN BERNARDINO COUNTY, CALIFORNIA" dated May 30, 2014. The study, completed by RPA Inc. with the collaboration David Penswick, P. Eng., and the Castle Mountain technical team was prepared in accordance with National Instrument 43-101 in support of the Company's April 24, 2014 press release, which detailed mining plans and economics for the open pit, heap leach Castle Mountain Mine in San Bernardino County, California. The report can be found on the Company's website at www.castlemountainmining.com And on SEDAR, at www.sedar.com.
The company has resumed drilling at the Castle Mountain Mine. The current program has several objectives; to provide material for metallurgical testing in areas scheduled for the first phase of mining, to continue building resources and lowering the expected strip ratio, and to identify potential higher grade, near surface mineralization to include in the early stages of mine planning. The results of the phase two drill program will be incorporated into the Feasibility Study, which the company expects to deliver before year end. To date, one PQ size diamond drill hole has been completed with no assays yet received. The first two holes are directed at collecting material below the Jumbo Pit and additional holes are planned in mineralized zones below and in proximity to the historically mined pits.
About Castle Mountain Mining Company
Subject to certain obligations, Castle Mountain Mining has 100% of the right, title and beneficial interest in and to the Castle Mountain Venture, a California general partnership, which owns the Castle Mountain property in San Bernardino County, California. The Castle Mountain heap leach gold mine produced over one million ounces of gold from 1992 to 2001, when mining was suspended due to low gold prices.
The Castle Mountain Venture land holdings (7,458 acres total) include patented claims (1,298 acres), and unpatented claims (6,160 acres). On December 11, 2013, the Company filed the Technical Report for its maiden NI 43-101 mineral resource estimate, that is available both on SEDAR at www.sedar.com and on the Company's website at www.castlemountainmining.com.
Castle Mountain Mining Company Ltd., through its wholly owned subsidiaries including Castle Mountain Venture, is focused on the exploration and, if warranted, development of deposits in San Bernardino County, California. The principal gold mineralization identified to date within the Project are below and surrounding the historically mined pits on the property including the Oro Belle-Hart Tunnel, Jumbo, and Lesley Anne-Jumbo South Pits, as well as in the South Domes area.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.
Forward-Looking Statements
Statements contained in this press release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward Looking Information includes, but is not limited to, disclosure regarding the drilling program; the timing and costs of future development and exploration activities on the Company's properties; success of development and exploration activities; time lines for technical reports and further studies, including a prefeasibility or feasibility study; and planned exploration and development of properties and the results thereof. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as "plans", "expects" or "does not expect", "is expected", budget", "scheduled", "suggest", "optimize", "estimates", "forecasts", "intends", "anticipates", "potential" or "does not anticipate", believes", "anomalous" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". In making the forward-looking statements in this press release, the Company has applied several material assumptions, including, but not limited to, that the current development, exploration and other objectives concerning the Castle Mountain Project can be achieved and that its other corporate activities will proceed as expected; that the current price and demand for gold will be sustained or will improve; that general business and economic conditions will not change in a materially adverse manner and that all necessary governmental approvals for the planned exploration on the Castle Mountain Project will be obtained in a timely manner and on acceptable terms; the continuity of the price of gold and other metals, economic and political conditions and operations.
Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. Such risks and other factors include, among others, risks inherent to the preliminary nature of the preliminary economic assessment, risks related to permitting, water availability, operating cost overruns, and capital cost overruns; risks related to a sustained and significant reduction in gold prices; risks that the metallurgical performance of different process feeds are not as anticipated; risks related to the availability of financing on commercially reasonable terms and the expected use of proceeds; operations and contractual obligations; changes in development and exploration programs based upon results of exploration; availability of third party contractors; availability of equipment; failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry; environmental risks, including environmental matters under U.S. federal and California rules and regulations; impact of environmental remediation requirements and the terms of existing and potential consent decrees on the Company's planned development and exploration on the Castle Mountain Project; certainty of mineral title; community relations; delays in obtaining governmental approvals or financing; the Company's dependence on one mineral project; the nature of mineral development, exploration and mining and the uncertain commercial viability of certain mineral deposits; the Company's lack of operating revenues; governmental regulations and the ability to obtain necessary licenses and permits; risks related to mineral properties being subject to prior unregistered agreements, transfers or claims and other defects in title; currency fluctuations; changes in environmental laws and regulations and changes in the application of standards pursuant to existing laws and regulations which may increase costs of doing business and restrict operations; risks related to dependence on key personnel; and estimates used in financial statements proving to be incorrect; as well as those factors discussed in the Company's public disclosure record and annual information form for the year ended December 31, 2013 which is available on SEDAR at www.sedar.com.
Although the Company has attempted to identify important factors that could affect the Company and may cause actual actions, events or results to differ materially from those described in Forward-Looking Information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this press release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.
Contact
Castle Mountain Mining Company
Gordon McCreary
President and CEO
(416) 572-0152
gmccreary@castlemountainmining.com
Castle Mountain Mining Company
Fraser Buchan
VP Corporate Development
(416) 640-1933
fbuchan@83yonge.com
www.castlemountainmining.com