• Freitag, 27 Dezember 2024
  • 08:56 Uhr Frankfurt
  • 07:56 Uhr London
  • 02:56 Uhr New York
  • 02:56 Uhr Toronto
  • 23:56 Uhr Vancouver
  • 18:56 Uhr Sydney

Colombian Mines Announces Mobilization of Drill and Crews to El Dovio

09.04.2014  |  Marketwire

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Apr 9, 2014) - Colombian Mines Corp. (TSX VENTURE:CMJ)(FRANKFURT:X6C) ("Colombian Mines" or the "Company") is pleased to announce it has awarded the contract for drilling at El Dovio to MPX Drilling Colombia SAS ("MPX"). Accordingly, MPX has advised the Company it will mobilize equipment and field crews to El Dovio, arriving April 11.

The 2014 drilling will expand on the highly successful and exciting 2013 drilling. The 2014 drilling will consist mostly of step-out drilling to expand know mineralization in the Sabana Blanca zone along strike and down dip as well as initial drill testing of the Platanillal and Brazo 1 zones. Table 1 below presents the announced drill intervals from the Company's 2013 drill program in the Sabana Blanca zone at El Dovio.

TABLE 1. Previously Announced 2013 El Dovio Drill Intercepts
Drill Hole
Number
From
(m)
To
(m)
Length
(m)
Length
(feet)
Au
g/T
Ag
g/T
Cu
%
Zn
%
D13-01A 21.3 120.9 99.6 327 0.64 1.41 0.08 0.18
26.0 30.0 4.0 13 2.26 1.93 0.05 0.15
69.2 86.3 17.1 56 2.38 4.03 0.37 0.71
Including
81.4 86.3 4.9 16 7.28 11.74 1.23 1.99
Including
81.4 83.5 2.1 7 15.60 20.31 2.24 2.09
114.8 120.9 6.1 20 7.00 4.36 0.02 0.65
Including
114.8 117.7 3.0 10 13.77 5.76 0.02 0.13
D13-02 47.5 98.7 51.2 168 1.15 5.99 1.11 0.16
51.6 53.5 1.9 6 3.18 2.33 0.26 0.10
77.5 92.9 15.4 51 3.43 17.93 3.60 0.40
Including
79.5 91.9 12.4 41 4.02 20.23 4.17 0.46
Including
89.3 91.9 2.6 9 9.36 30.06 5.16 0.50
D13-04 40.0 101.5 61.5 202 0.60 3.56 0.72 0.13
71.0 100.6 29.6 97 1.14 6.86 1.48 0.16
Including
72.0 77.1 5.1 17 4.02 10.80 1.33 0.36
and
93.0 100.6 7.6 25 0.95 15.70 4.30 0.26
D13-05 69.0 95.5 26.6 87 1.66 9.55 1.53 0.36
Including
86.5 93.4 6.9 23 5.86 34.29 5.89 1.29
D13-06 41.5 59.5 18.0 59 1.20 3.24 0.57 0.46
Including
49.6 51.6 2.0 7 3.60 3.00 0.07 0.69
and
54.5 56.9 2.4 8 3.90 15.60 4.00 2.26
D13-07 37.7 83.5 45.8 150 0.97 3.93 0.55 0.31
Including
47.5 56.3 8.8 29 2.60 12.94 2.68 0.87
also
53.0 56.3 3.3 11 2.04 26.66 6.83 0.83
D13-08 54.5 91.3 36.8 121 0.80 1.99 0.26 0.23
Including
55.5 58.5 3.0 10 3.68 11.57 1.91 1.08
and
69.5 72.5 3.0 10 3.88 5.53 0.63 1.15

About El Dovio: Colombian Mines Corp.'s El Dovio project hosts structurally controlled, high grade, gold - poly metallic mineralization comprised of multi-phased coliform banded crystalline quartz containing semi-massive to massive sulfides in metamorphosed thoelitic volcanic rocks of the Cañasgordas Group. Mineralization at El Dovio occurs in four major zones, the Sabana Blanca, Granizales, Platanillal and Brazo 1 zones. Metallurgical characteristics are excellent, yielding greater than 96% of the contained gold, copper and zinc, and 91% of contained silver with conventional flotation.

Additional potential exists to discover bedded VMS style mineralization along an important sediment - volcanic contact that stretches for more than seven (7) kilometers across the El Dovio property and which is similar to that known to host the Atico Mining's, Mina El Roble. The Company has already identified strong gold and copper geochemical results similar to those associated with mineralization in the Sabana Blanc, Brazo 1 and Granizales zones and limited prospecting of this zone discovered bedded sulfides in graphitic sediments.

About Colombian Mines Corporation: Colombian Mines Corp. is an aggressive exploration and development stage company with a distinct "first mover" advantage in Colombia. Focused on developing shareholder value through exploration and development of key projects, the Company is also one of Colombia's leading "prospect generators". Further information can be found on our website at www.colombianmines.com.

Robert G. Carrington, President & CEO

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statement:

Some of the statements in this news release contain forward-looking information that involves inherent risk and uncertainty affecting the business of Colombian Mines Corp.. Actual results may differ materially from those currently anticipated in such statements.



Contact

Colombian Mines Corp.
Sharon Hebgin
Corporate Communications
(604) 649-9195 - Canada
(760) 668-7211 - United States
shebgin@colombianmines.com
Colombian Mines Corp.
Dave Cross
Chief Financial Officer and Corporate Secretary
(604) 669-0868
dcross@crossdavis.com
www.colombianmines.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Pinnacle Silver and Gold Corp.
Bergbau
A3EHJ0
CA72350R1055
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.