Kinross Reports 2013 Fourth-Quarter and Year-End Results
Company achieves record full-year production with all-in sustaining cost below guidance
TORONTO, ONTARIO -- (Marketwired - Feb. 12, 2014) - Kinross Gold Corporation (TSX:K) (NYSE:KGC) today announced its results for the fourth quarter and year-ended December 31, 2013.
Highlights:
- Production(1): 646,234 gold equivalent ounces (Au eq. oz.), compared with 724,510 ounces in Q4 2012. Full-year production was within increased guidance, and exceeded original guidance, at 2,631,092 Au eq. oz., compared with 2,617,813 Au eq. oz. for full-year 2012.
- Revenue: $877.1 million, compared with $1,186.9 million in Q4 2012. Full-year revenue was $3,779.5 million, compared with $4,307.3 million for full-year 2012.
- Production cost of sales(2): $765 per Au eq. oz., compared with $686 in Q4 2012. Full-year production cost of sales was at the lower end of guidance at $743 per Au eq. oz., compared with $705 per Au eq. oz. for full-year 2012.
- All-in sustaining cost(2): $1,169 per Au oz. sold, compared with $953 in Q4 2012. Full-year all-in sustaining cost was below guidance at $1,063 per Au oz., compared with $1,079 per Au oz. for full-year 2012.
- Adjusted operating cash flow(2): $222.8 million, or $0.19 per share, compared with $505.3 million, or $0.44 per share, in Q4 2012. Full-year adjusted operating cash flow was $1,149.6 million, or $1.01 per share, compared with $1,527.0 million, or $1.34 per share, for full-year 2012.
- Adjusted net earnings (loss)(2), (3): a loss of $25.1 million, or $0.02 per share, in Q4 2013 compared with adjusted earnings of $280.5 million, or $0.25 per share, in Q4 2012. Full-year adjusted net earnings were $321.2 million, or $0.28 per share, compared with net earnings of $886.2 million, or $0.78 per share, for full-year 2012.
- Reported net loss(3): $740.0 million, or $0.65 per share, compared with net loss of $2,984.9 million, or $2.62 per share, in Q4 2012. The Q4 reported net loss includes an after-tax non-cash impairment charge of $544.8 million, primarily comprised of property, plant and equipment at Maricunga. Full-year reported net loss was $3,012.6 million, or $2.64 per share, compared with a net loss of $2,546.2 million, or $2.24 per share for full-year 2012. Reported net loss for the full year also includes an after-tax non-cash impairment charge of $2,289.3 million, previously reported on July 31, 2013.
- Average realized gold price: $1,268 per Au oz., compared with $1,707 per Au oz. in Q4 2012. The average realized gold price per ounce was $1,402 for full-year 2013, compared with $1,643 per ounce for full-year 2012.
- Capital expenditures: $1.26 billion, $140 million below the Company's updated guidance, and approximately $340 million below the original capital expenditure guidance provided on February 13, 2013.
- Mineral reserves and resources: Proven and probable mineral reserve estimates at year-end 2013 were 39.7 million ounces of gold, compared with 59.6 million ounces at year-end 2012, reflecting divesture of Fruta del Norte (FDN), depletion, and the Company's adoption of a fully-loaded costing methodology for estimating year-end mineral reserves. This methodology has resulted in a 14% increase in overall gold grade in the Company's estimated mineral reserves, including increased grades at eight of nine operating mines, and an expected increase in near-term cash flow. The new methodology does not currently sterilize known mineralization.
- Outlook: Kinross expects to produce approximately 2.5-2.7 million Au eq. oz. in 2014 at a production cost of sales per Au eq. oz. of $730-780. All-in sustaining cost of sales per Au eq. oz. is expected to be $950-1,050 for the year. Total capital expenditures are forecast to be approximately $675 million, a reduction of approximately $585 million compared with 2013 expenditures.
- Tasiast feasibility study: The study remains on schedule for expected completion in Q1 2014 and the Company expects to provide highlights of the results in April.
- Exploration: The Company's 2013 exploration program delivered encouraging drill results from targets at Tasiast, La Coipa, Chirano, Kupol and Dvoinoye.
CEO Commentary
J. Paul Rollinson, CEO, made the following comments in relation to 2013 year-end and fourth-quarter results:
"Operational excellence, combined with a focus on financial discipline and a strong balance sheet, underpinned Kinross's solid performance in 2013. The fourth quarter of 2013 marked our sixth consecutive quarter of strong operational results. As a result, we produced a record 2.63 million gold equivalent ounces in 2013, exceeding our original production guidance, and within our updated guidance. We also reduced our all-in sustaining cost to $1,063 per ounce, which not only beat guidance, but was below our all-in sustaining cost for 2012.
"Part of our 'quality over quantity' strategy in 2013 included a rigorous mine plan optimization program, which applied a fully-loaded costing methodology to all of our operating sites in preparing our year-end mineral reserves estimates. The result is a reduction in proven and probable mineral reserves, primarily at Paracatu, but an increase in the value of our reserves, with higher grades and greater near-term cash flow expected at operations across the Company.
"We are forecasting another solid year of production in 2014, with Dvoinoye, our new low cost, high-grade mine, coming fully on-stream. Our focus on cost control is expected to further reduce our all-in sustaining cost. Capital expenditures, which were $140 million below our revised guidance in 2013, are expected to be further reduced by more than $585 million this year. Backed by a strong balance sheet and healthy liquidity, we enter 2014 committed to maintaining our record of financial discipline and solid operational performance."
Financial results
Summary of financial and operating results
Three months ended Years ended
December 31, December 31,
(in millions, except ounces, per share amounts, and per ounce amounts) 2013 2012 2013 2012
Total gold equivalent ounces(a)(e) - Produced (c) 653,805 733,117 2,658,632 2,678,131
Total gold equivalent ounces(a)(e) - Sold (c) 691,300 695,934 2,697,093 2,654,107
Gold equivalent ounces from continuing operations (a)(d) - Produced (c) 653,805 733,117 2,658,632 2,647,137
Gold equivalent ounces from continuing operations (a)(d) - Sold (c) 691,300 695,934 2,697,093 2,621,343
Total attributable gold equivalent ounces(a)(e) - Produced (c) 646,234 724,510 2,631,092 2,648,807
Total attributable gold equivalent ounces(a)(e) - Sold (c) 683,419 687,162 2,669,276 2,624,242
Attributable gold equivalent ounces from continuing operations (a)(d) - Produced (c) 646,234 724,510 2,631,092 2,617,813
Attributable gold equivalent ounces from continuing operations (a)(d) - Sold (c) 683,419 687,162 2,669,276 2,591,478
Financial Highlights from Continuing Operations (d)
Metal sales $ 877.1 $ 1,186.9 $ 3,779.5 $ 4,307.3
Production cost of sales $ 528.4 $ 477.6 $ 2,004.4 $ 1,849.2
Depreciation, depletion and amortization $ 206.7 $ 199.8 $ 828.8 $ 680.9
Impairment charges $ 736.5 $ 3,527.6 $ 3,169.6 $ 3,527.6
Operating loss $ (706.1 ) $ (3,147.3 ) $ (2,635.2 ) $ (2,241.9 )
Net loss from continuing operations attributable to common shareholders $ (740.0 ) $ (2,984.9 ) $ (3,012.6 ) $ (2,546.2 )
Basic loss per share from continuing operations attributable to common shareholders $ (0.65 ) $ (2.62 ) $ (2.64 ) $ (2.24 )
Diluted loss per share from continuing operations attributable to common shareholders $ (0.65 ) $ (2.62 ) $ (2.64 ) $ (2.24 )
Adjusted net earnings (loss) from continuing operations attributable to common shareholders(b) $ (25.1 ) $ 280.5 $ 321.2 $ 886.2
Adjusted net earnings (loss) from continuing operations per share(b) $ (0.02 ) $ 0.25 $ 0.28 $ 0.78
Net cash flow of continuing operations provided from operating activities $ 187.2 $ 487.4 $ 796.6 $ 1,317.3
Adjusted operating cash flow from continuing operations(b) $ 222.8 $ 505.3 $ 1,149.6 $ 1,527.0
Adjusted operating cash flow from continuing operations per share(b) $ 0.19 $ 0.44 $ 1.01 $ 1.34
Average realized gold price per ounce from continuing operations $ 1,268 $ 1,707 $ 1,402 $ 1,643
Consolidated production cost of sales from continuing operations per equivalent ounce(c) sold(b) $ 764 $ 686 $ 743 $ 705
Attributable(a) production cost of sales from continuing operations per equivalent ounce(c) sold(b) $ 765 $ 686 $ 743 $ 705
Attributable(a) production cost of sales from continuing operations per ounce sold on a by-product basis(b) $ 733 $ 605 $ 703 $ 627
Attributable(a) all-in sustaining cost from continuing operations per ounce sold on a by-product basis(b) $ 1,169 $ 953 $ 1,063 $ 1,079
Attributable(a) all-in sustaining cost from continuing operations per equivalent ounce(c) sold(b) $ 1,175 $ 1,008 $ 1,082 $ 1,122
(a) Total includes 100% of Chirano production. "Attributable" includes Kinross' share of Chirano (90%) production.
(b) The definition and reconciliation of these non-GAAP financial measures is included on pages 13 to 16 of this news release.
(c) "Gold equivalent ounces" include silver ounces produced and sold converted to a gold equivalent based on a ratio of the average spot market prices for the commodities for each period. The ratio for the fourth quarter of 2013 was 61.18:1, compared with 52.55:1 for the fourth quarter of 2012; year to date 2013 was 59.23:1, compared with 53.56:1 for 2012.
(d) On June 10, 2013, the Company announced its decision to cease development of FDN. On June 28, 2012, the Company disposed of its interest in Crixás. As a result, the comparative figures have been recast to exclude the results of FDN and Crixás.
(e) The total gold equivalent ounces and total attributable gold equivalent ounces include Crixás up to June 28, 2012.
The following operating and financial results are based on fourth-quarter and full-year 2013 attributable gold equivalent production from continuing operations:
Production: Kinross produced 646,234 attributable Au eq. oz. from continuing operations in the fourth quarter of 2013, a decrease over the fourth quarter of 2012, mainly due to the suspension of mining at La Coipa and scheduled maintenance at several other sites. Full-year production was a record 2,631,092 attributable Au eq. oz., exceeding the Company's original guidance and within its updated guidance of November 13, 2013, due to increased production at several sites.
Production cost of sales: Production cost of sales per Au eq. oz.(2) was $765 for the fourth quarter of 2013, compared with $686 for the fourth quarter of 2012, primarily as a result of the impact of lower production and increased maintenance costs. Production cost of sales per Au eq. oz. for full-year 2013 was $743, in the lower end of the Company's guidance range of $740-790, compared with $705 for full-year 2012. Production cost of sales per Au oz. on a by-product basis was $733 in Q4 2013, compared with $605 in Q4 2012, based on Q4 2013 attributable gold sales of 643,864 ounces and attributable silver sales of 2,419,941 ounces. Production cost of sales per gold ounce on a by-product basis was $703 for the full year, compared with $627 for full-year 2012.
All-in sustaining cost: Attributable all-in sustaining cost per Au oz. sold(2) on a by-product basis was $1,169 in Q4 2013, compared with $953 in Q4 2012, primarily due to an increase in production cost of sales and the timing of sustaining capital expenditures. Full-year attributable all-in sustaining cost per Au oz. sold on a by-product basis was below full-year guidance at $1,063, compared with, $1,079 in 2012, mainly due to reduced sustaining capital expenditures, and reductions in exploration and overhead expenses.
Attributable all-in sustaining cost from continuing operations per Au eq. oz. sold was $1,175 in Q4 2013, compared with $1,008 in Q4 2012. For full-year 2013, attributable all-in sustaining cost per Au eq. oz. sold was $1,082, compared with $1,122 for full-year 2012.
Revenue: Revenue from metal sales was $877.1 million in the fourth quarter of 2013, compared with $1,186.9 million during the same period in 2012. The decrease was mainly due to the lower average realized gold price for the quarter. Revenue for full-year 2013 was $3,779.5 million, compared with $4,307.3 million for full-year 2012, mainly due to a lower average realized gold price.
Average realized gold price: The average realized gold price was $1,268 per ounce in Q4 2013, compared with $1,707 per ounce in Q4 2012. The average realized gold price per ounce was $1,402 for full-year 2013, a decrease of 15%, compared with $1,643 for full-year 2012.
Margins: Kinross' margin per Au eq. oz. sold(4) was $503 for the fourth quarter of 2013, compared with the Q4 2012 margin of $1,021 per Au eq. oz. Full-year margin per Au eq. oz. sold(4) was $659, compared with $938 for full-year 2012.
Operating cash flow: Adjusted operating cash flow(2) was $222.8 million for the fourth quarter, or $0.19 per share, compared with $505.3 million, or $0.44 per share, for Q4 2012. Adjusted operating cash flow for full-year 2013 was $1,149.6 million, or $1.01 per share, compared with $1,527.0 million, or $1.34 per share, for full-year 2012.
Cash balance: Cash and cash equivalents and short-term investments were $734.5 million as at December 31, 2013, compared with $1,982.5 million as at December 31, 2012, mainly due to debt repayment and capital expenditures.
Earnings: Adjusted net loss(2), (3) was $25.1 million, or $0.02 per share, for Q4 2013, compared with adjusted earnings of $280.5 million, or $0.25 per share, for Q4 2012, mainly due to a lower average realized gold price, higher production cost of sales, and depreciation. Adjusted net earnings were $321.2 million, or $0.28 per share, for full-year 2013, compared with $886.2 million, or $0.78 per share, for full-year 2012.
Reported net loss(3) was $740.0 million, or $0.65 per share, for Q4 2013, compared with a loss of $2,984.9 million, or $2.62 per share, in Q4 2012. The Q4 2013 reported net loss includes an after-tax non-cash impairment charge of $544.8 million, primarily comprised of property, plant and equipment at Maricunga.
Reported net loss was $3,012.6 million, or $2.64 per share, for full-year 2013, compared with a loss of $2,546.2 million, of $2.24 per share, for full-year 2012. Reported net loss for the full year also includes an after-tax non-cash impairment charge of $2,289.3 million, previously reported on July 31, 2013. This impairment was largely as a result of lower short-term and long-term gold price assumptions. In addition, Kinross recorded a charge of $720.0 million in Q2 2013 relating to the decision to cease development of its FDN project in Ecuador, which has been classified as a discontinued operation.
Capital expenditures: Capital expenditures were $331.1 million for Q4 2013, compared with $497.6 million for the same period last year, a decrease due mainly to lower spending at Tasiast. Capital expenditures for the full-year 2013 were $1.26 billion, below the Company's updated guidance, and approximately $340 million below the original capital expenditure guidance provided on February 13, 2013.
Operating results
Mine-by-mine summaries for fourth-quarter and full-year 2013 operating results may be found on pages 17 and 21 of this news release. Highlights include the following:
North America: Regional performance remained strong in the fourth quarter, as North America exceeded regional production guidance for the year, while production cost of sales was below regional guidance for full-year 2013. Fort Knox production declined compared with the third quarter, due to the seasonal slow-down of the heap leach. At Kettle River-Buckhorn, production was lower than the previous quarter as a result of lower mill throughput, while production at Round Mountain was in line with Q3 2013.
Russia: Full-year production was higher, and production cost of sales lower, than 2013 regional guidance due to better than expected throughput, grade, and recoveries. This was mainly the result of a faster than planned ramp-up of the expanded Kupol mill, which is now processing up to 4,500 tonnes per day. Production in the fourth quarter was slightly higher than the previous quarter, with marginally lower grades and recoveries offset by higher mill throughput. Approximately 24,000 Au eq. oz. were produced from processing Dvoinoye ore in the quarter.
South America: Full-year regional production was at the higher end of guidance, while production cost of sales remained within the guidance range. Regional production declined compared with the previous quarter as operations at La Coipa ceased following the suspension of mining at the existing ore body. Paracatu production decreased and production cost of sales increased compared with Q3 2013 due to lower grade and lower throughput at Plant 2, as scheduled maintenance was performed in the fourth quarter. Maricunga's Q4 production increased and production cost of sales decreased compared with Q3 2013 due to an increase in throughput and grades.
West Africa: Full-year production for 2013 exceeded regional guidance, while production cost of sales was at the low end of the guidance range. Tasiast's Q4 2013 production improved compared with the previous quarter, and on a year-over-year basis, mainly as a result of improved mill grades. Chirano's Q4 2013 production improved compared with Q3 2013 as a result of processing higher tonnages and mining higher grade areas.
Outlook
The following section of the news release represents forward-looking information and users are cautioned that actual results may vary. We refer to the risks and assumptions contained in the Cautionary Statement on Forward-Looking Information on page 11 of this news release.
In 2014, Kinross expects to produce approximately 2.5-2.7 million Au eq. oz. from its current operations, comparable to 2013. Production cost of sales per Au eq. oz. is expected to be in the range of $730-780 for 2014.
The Company has forecast an all-in sustaining cost of $950-1,050 per Au eq. oz. sold and per gold ounce sold on a by-product basis for full-year 2014.
The table below summarizes the 2014 forecasts for production and average production cost of sales on a gold equivalent and a by-product accounting basis:
Accounting basis 2014 (forecast)
Gold equivalent basis
Production (gold equivalent ounces) 2.5-2.7 million
Average production cost of sales per Au eq. oz. $730-780
All-in sustaining cost per Au eq. oz. $950-1,050
By-product basis
Gold ounces 2.45-2.65 million
Silver ounces 4-5 million
Average production cost of sales per Au oz. $715-765
All-in sustaining cost per Au oz. $950-1,050
Production in 2014 is forecast to be largely consistent with 2013, as the ramp-up of operations at Dvoinoye is expected to offset the suspension of operations at La Coipa. In addition, improvements in grade at Paracatu, Maricunga, Tasiast, and Chirano are expected to offset expected declines in grade and throughput at Fort Knox and Kettle River-Buckhorn.
The 2014 production cost of sales per Au eq. oz. is forecast to be largely consistent with 2013. This is primarily due to the positive impact of lower cost ounces from Dvoinoye replacing higher cost ounces from La Coipa, and production improvements at Paracatu, Maricunga and the West African operations, offset by higher expected unit costs at Fort Knox and Kettle River-Buckhorn due to the expected production variances noted above.
The 2014 all-in sustaining cost per ounce forecast is lower than the 2013 forecast as a result of planned reductions in capital, exploration and overhead spending.
The following table provides a summary of the 2014 production and production cost of sales forecast by region:
Region Forecast 2014
production
(Au eq. oz.) Percentage
of total
production(5) Forecast 2014
production
cost of sales
($ per Au eq. oz.)
Americas* 1.33-1.43 million 53 %
780-840
West Africa (attributable) 480,000-540,000 20
% 810-880
Russia 690,000-730,000 27 % 560-590
Total 2.5-2.7 million 100 % 730-780
*As previously announced on November 13, 2013, Kinross integrated its North and South America regions into a new Americas region comprising five operating mines (Fort Knox, Kettle River-Buckhorn, Round Mountain, Maricunga and Paracatu) as part of its review of the corporate and regional management structure.
Material assumptions used to forecast 2014 production cost of sales are as follows:
- a gold price of $1,200 per ounce,
- a silver price of $18 per ounce,
- an oil price of $100 per barrel,
- foreign exchange rates of:
2.27 Brazilian reais to the U.S. dollar,
1.05 Canadian dollars to the U.S. dollar,
33 Russian roubles to the U.S. dollar,
505 Chilean pesos to the U.S. dollar,
2.00 Ghanaian cedi to the U.S. dollar,
290 Mauritanian ouguiya to the U.S. dollar, and
1.30 U.S. dollars to the Euro.
Taking into account existing currency and oil hedges, a 10% change in foreign currency exchange rates would be expected to result in an approximate $12 impact on our production cost of sales per ounce, a $10 per barrel change in the price of oil would be expected to result in an approximate $3 impact on our production cost of sales per ounce, and a $100 change in the price of gold would be expected to result in an approximate $3 impact on our production cost of sales per ounce as a result of a change in royalties.
Total capital expenditures for 2014 are forecast to be approximately $605 million (excluding estimated capitalized interest of approximately $70 million). The $605 million in forecast expenditures is summarized in the table below:
Region Forecast 2014
sustaining
capital
(million) Forecast 2014
non-sustaining
capital
(million) Total
(million)
Americas $ 275 $ 5 $ 280
West Africa $ 55 $ 190 $ 245
Russia $ 65 $ 10 $ 75
Corporate $ 5 $ 0 $ 5
Total $ 400 $ 205 $ 605
Sustaining capital includes the following forecast spending estimates:
- Mine development: $70 million (Americas), $30 million (Russia)
- Mobile equipment: $35 million (Americas), $10 million (West Africa), $5 million (Russia)
- Mill facilities: $50 million (Americas)
- Leach facilities: $20 million (Americas)
- Tailings facilities: $30 million (Americas), $10 million (West Africa), $5 million (Russia)
Non-sustaining capital includes the following forecast spending estimates:
- Tasiast Project (completion of feasibility study and existing contracts): $60 million
- Tasiast West Branch stripping: $95 million
- Other development projects/studies: $15 million
- Chirano self-perform underground mining: $5 million
- Chirano Paboase deposit (initial development): $20 million
- Dvoinoye project infrastructure completion: $10 million
The 2014 forecast for exploration and business development expense is approximately $125 million, of which $40 million is expected for business development expenses. Including expected capitalized exploration of $5 million, total exploration expenditures are forecast to be $90 million. General and administrative expenses are forecast to be $165 million. Other operating costs are forecast to be approximately $50 million, including $14 million forecast for care and maintenance costs at La Coipa. The above forecast expenses include approximately $40 million related to expected equity-based compensation.
Income tax expenses are expected to be $100 million based on our assumed gold price plus approximately 24% of any profit resulting from higher gold prices. Depreciation, depletion and amortization is forecast to be approximately $300 per Au eq. oz.
2013 Mineral Reserves and Mineral Resources update
Please refer to the Mineral Reserve and Mineral Resource tables and corresponding notes located at the end of this news release.
As part of Kinross' commitment to mining quality, higher margin, lower cost ounces, a rigorous mine plan optimization program has been established at all operating sites. This program, based on a fully-loaded costing methodology, incorporates sustaining capital, mine waste management costs, and general and administrative costs, in addition to other operating costs, in estimating the Company's year-end mineral reserves. The result of this more rigorous methodology is a reduction in estimated proven and probable mineral reserves but an expected increase in the value of estimated mineral reserves, with higher grades, reduced stripping, and greater near-term cash flow expected at operations across the Company. This emphasis on quality over quantity has resulted in an approximate 14% increase in the average grade of the Company's proven and probable mineral reserve estimates (excluding the net impact of FDN, which was removed from the 2013 mineral reserve and mineral resource estimates). It is important to note that due to the gold grade distributions and ore body geometries at our properties there has been no sterilization of current mineral resource or potential ounce estimates at the $1,200 gold per ounce price guidance used for mineral reserves. As a result, those estimated mineral resources and potential ounces are still available with increasing gold prices and/or cost reductions.
Proven and Probable Mineral Reserves
Kinross' total estimated proven and probable gold reserves, based on a $1,200 gold price assumption, were 39.7 million ounces at year-end 2013, compared with 59.6 million ounces at year-end 2012. Approximately half of the 19.9 million ounce reduction was due to the divestiture of FDN in Ecuador (6.7 million ounces) and production depletion (3.4 million contained ounces).
The application of the fully-loaded costing methodology reduced estimated mineral reserves by 6.8 million gold ounces at Paracatu, the latest of the Company's mine sites to undergo a mine plan optimization as part of the Kinross Way Forward. The exercise resulted in an increase in estimated average grade from 0.40 to 0.42 grams per tonne, and a reduction in the estimated life of the mine to 2030, which is expected to result in a decrease of approximately 60% in life of mine capital, as well as a reduction in life of mine operating expenditures. An additional 0.8 million ounce reduction of estimated gold reserves was due to production depletion.
Other changes include a 2.1 million gold ounce decrease at Maricunga, due to a revised mine plan and focus on higher margin ounces, and a 1.4 million gold ounce reduction at Tasiast as a result of production depletion (0.4 million gold ounces) and a reclassification of 1 million ounces to mineral resources. The estimated average gold reserve grade at Tasiast also increased from 1.66 to 2.27 grams per tonne. Production depletion reduced Fort Knox's proven and probable mineral reserve estimates by 0.7 million ounces.
Proven and probable silver reserves at year-end 2013 were estimated at 44.8 million ounces, a net decrease of 23.4 million ounces from year-end 2012, primarily due to the divestiture of FDN and the suspension of operations at La Coipa. Silver reserves were estimated using a silver price assumption of $22.00 per ounce.
Proven and probable copper reserves at year-end 2013 were estimated at 1.4 billion pounds, unchanged from year-end 2012. Copper reserves were estimated using a copper price assumption of $3.00 per pound.
Measured and Indicated Mineral Resources
Reclassification of mineral reserves due to the fully-loaded costing methodology contributed to an increase in total estimated measured and indicated gold resources by a net 2.33 million ounces to approximately 22.65 million ounces at year-end 2013. Paracatu reclassified approximately 2.1 million gold ounces from gold reserves to gold resources and Tasiast reclassified an estimated 1.0 million gold ounces. Combined with other sites, the total reclassification to an estimated measured and indicated resource was 3.7 million gold ounces. This was offset by minor exploration and engineering changes across the sites, and by the divestiture of FDN, which resulted in a reduction of 0.7 million ounces in estimated gold resources. Gold resources were estimated using a gold price of $1,400 per ounce.
Estimated silver resources increased by 4.8 million ounces to 22.8 million ounces, based on a $26.00 per ounce silver price.
Inferred Mineral Resources
Kinross' total estimated inferred gold resources at year-end 2013 were approximately 6.7 million ounces, a net decrease of 7.7 million ounces. The reduction was primarily due to the divestiture of FDN (3.6 million ounces) and mine plan optimization at Paracatu (2.7 million ounces).
Exploration update
Results from Tasiast continue to confirm Kinross' belief in the long-term exploration potential of the district. A new zone of mineralization was identified at Piment Central beneath the west sidewall of the pit. The zone represents a new style of mineralization at Tasiast and consequently provides a new target style that Kinross will explore along the mine corridor. At La Coipa, two new zones of oxide mineralization were discovered in the vicinity of La Coipa Phase 7. At Kupol, infill drilling on the Moroshka vein confirmed continuity of grades along a narrow vein shoot 4 kilometres east of the mill. Trenching and drilling 15 kilometres northwest of Dvoinoye identified high grade mineralization near the surface at September Northeast, which remains open at depth with potential for new zones along strike. At Chirano, drilling results extended mineralized zones beneath the pits at Tano, Akoti and Suraw.
A summary of 2013 highlights is presented below. Additional detail may be found in the Appendices which provide illustrations, captions, and accompanying explanatory notes (Appendix A), and drilling results and location data (Appendix B), corresponding to the figures below.
Appendix A:
http://www.kinross.com/media/250936/2013%20q4%20year%20end%20appendix%20a.pdf
Appendix B:
http://www.kinross.com/media/250933/q4%20year%20end%202013%20appendix%20b.xlsx
Tasiast
Drilling activities were undertaken throughout the year on the El Gaicha mine license and on the Tasiast Sud, Tmeimichat and Imkebdene exploration licenses (Appendix A: Figure 1). On El Gaicha, the work focused on testing a new zone of mineralization identified beneath the Piment Central pit (Appendix A: Figure 2) and on expanding mineralized zones previously identified in the Fennec sector east of the mine. Drilling continued south of the mine on the Tasiast Sud license following up targets identified along the Tasiast Shear Zone 10 to 15 kilometres south of West Branch. Late in the year, drilling restarted in the Aouèouat area north of the mine, where a number of new targets were identified based on results of the 2012 program. 879 holes were drilled in 2013 for a total of 94,000 metres.
Piment Central: In early 2013, a diamond drill hole (TA17066DD) collared in the bottom of the Piment Central pit returned a promising intercept of 8.9 g/t over 18 m (Appendix A: Figure 2). Following this discovery, a review of historical drill holes indicated that the mineralized vein system was intercepted in prior drilling but had not been recognized as a new mineralization style that had potential to impact the Piment Central estimated mineral resource.
Twelve additional core holes were completed to confirm the geologic interpretations and expand the known extent of the vein zone. A total of 1,930 metres were drilled testing one kilometre of the mineralized trend. Vein-style mineralization remains open on strike and at depth. Further core drilling is planned in 2014 to extend the known strike-length, locally test down-dip and also to further define continuity with infill holes.
Aouèouat Area (Tmeimichat and Imkebdene exploration licenses): Drilling in 2012 began outlining potentially significant volumes of gold mineralization at N1 and N2 (Appendix A: Figure 3). A total of 45 holes totalling 8,702 metres were drilled in 2013 on the Aoueouat area at three targets (N2, TEF, Central). Results continue to expand the known mineralization and provide information on geologic controls, geometry, continuity and potential extents.
Tasiast Sud: Strong gold in soil anomalies are spatially associated with the Tasiast thrust system and have a cumulative strike of more than 16 kilometres across the Tasiast Sud license (Appendix A: Figure 4). Potential exists in this corridor for mineralization of Piment- (banded iron formation), West Branch- (greenschist) and quartz-carbonate vein-styles hosted by mafic and sedimentary rocks. A total of 265 holes totalling 24,290 metres were drilled in 2013 on the Tasiast Sud Project testing the gold potential of five zones (C613, C614, C615, C616, Tamaya).
La Coipa
Reverse circulation and diamond drilling activities continued throughout 2013 on a number of targets stepping out from known mineralization or from historical occurrences never previously followed-up. Ten areas were targeted during 2013. Sufficiently encouraging mineralization was encountered at Catalina, Pompeya Sur, Sofia, Atenas, and Puren West (Appendix A: Figure 5) warranting further drilling in 2014.
Catalina was targeted owing to a structural setting similar to La Coipa Phase 7. The target is located one kilometre southeast of La Coipa Phase 7 and occurs beneath 150 to 200 metres of colluvial overburden and young volcanic cover. Early results from this oxide discovery are encouraging and drilling continues to outline the geometry of the mineralization (Appendix A: Figure 6). Mineralization remains open to the north and northwest some 600 metres towards Phase 7 over untested ground. Currently, drilling is attempting to better define the morphology of and controls on mineralization. Preliminary 3D modelling is underway to aid further drill targeting.
Kupol
Moroshka is located about 4 kilometres east of Kupol Mine within the Kupol license area (Appendix A: Figure 7) on the opposite side of a wide volcanic-filled graben to the Kupol Vein. Infill drilling at Moroshka in 2013 confirmed continuity of high grades along a 400-metre strike vein structure and over a vertical interval of 130 metres (Appendix A: Figure 8). Step-out drilling has indicated potential for further high-grade mineralization directly on strike to the north of the main deposit and to the west where narrow high-grade veins were encountered at depth in 2009 drilling.
Kinross' current preliminary estimate is that the Moroshka deposit contains a minimum total potential mineral resource of 0.4 to 0.6 million tonnes grading 11.9 to 19.7 g/t gold equivalent. These potential estimates are conceptual in nature, as further exploration is required to define a mineral resource, and it is uncertain if such additional exploration will define a mineral resource. The Company is developing a mineral resource block model incorporating new information from last year's infill drilling and is undertaking geometallurgical testing of the mineralized zone.
Dvoinoye
The September Northeast target is located approximately 15 kilometres northwest of the Dvoinoye mine on the Vodorazdelaya license (Appendix A: Figure 9). At the end of the 2012 field season a surface trench returned 7.0 m grading 85.6 g/t Au (TSP12-006). The last drill hole of the season (SP12-023) was collared adjacent to the trench and intersected 6.5 metres grading 16.8 g/t Au beneath the mineralized interval on surface.
Follow-up drilling and trenching in 2013 has identified a complex zone of mineralization at the south end of the target (Appendix A: Figure 10). The last hole completed in 2013 leaves mineralization open at depth. The search for similar style mineralization will be conducted under alluvial cover to the west and along strike to the south.
Chirano
Core drilling in 2013 was designed to assess the underground potential of mineralization beneath the Akoti, Tano and Suraw pits (Appendix A: Figure 11). Results of the drilling confirmed mineralization extends 100 to 400 metres below the bottom of each pit coinciding with the elevation range of underground development in the Paboase mine (which may be used to access future potential resources below these pits). Mineralization remains open at depth at all three deposits.
Other developments
On February 10, 2014, the Company announced that Brant Hinze, President and Chief Operating Officer, will retire effective October 1, 2014. Mr. Hinze will be succeeded as Chief Operating Officer by Warwick Morley-Jepson, currently Regional Vice-President of the Company's Russia region.
Non-cash impairment
The Company completed its annual assessment of the carrying value of its cash generating units (CGU) for the year-ended December 31, 2013, and as a result, recorded an after-tax non-cash impairment charge of $544.8 million. The impairment charge was comprised of $376.0 million of property plant and equipment at Maricunga and $168.8 million of goodwill at Quebrada Seca, a non-operating asset located in Chile. The impairment charge at Maricunga was net of a tax recovery of $49.2 million, and was a result of changes to the life of mine plan and a corresponding reduction in mineral reserves.
The December 31, 2013 impairment charge is in addition to the previously disclosed after-tax non-cash impairment charges recorded in the second quarter, which included $2,289.3 million related to continuing operations, $219.0 million related to the investment in Cerro Casale, and $720.0 million related to FDN.
The Company also recorded inventory write-downs of $142.5 million at December 31, 2013 and $35.1 million at June 30, 2013 to bring the carrying value of inventory to its recoverable amount.
Conference call details
In connection with the release, Kinross will hold a conference call and audio webcast on Thursday, February 13, 2014 at 8 a.m. ET to discuss the results, followed by a question-and-answer session. To access the call, please dial:
Canada & US toll-free - 1-800-319-4610
Outside of Canada & US - 1-604-638-5340
Replay (available up to 14 days after the call):
Canada & US toll-free - 1-800-319-6413; Passcode - 3310 followed by #.
Outside of Canada & US - 1-604-638-9010; Passcode - 3310 followed by #.
You may also access the conference call on a listen-only basis via webcast at our website www.kinross.com. The audio webcast will be archived on our website at www.kinross.com.
This release should be read in conjunction with Kinross' 2013 year-end Financial Statements and Management's Discussion and Analysis report at www.kinross.com. Kinross' 2013 year-end Financial Statements and Management's Discussion and Analysis have been filed with Canadian securities regulators (available at www.sedar.com) and furnished with the U.S. Securities and Exchange Commission (available at www.sec.gov). Kinross shareholders may obtain a copy of the financial statements free of charge upon request to the Company.
About Kinross Gold Corporation
Kinross is a Canadian-based gold mining company with mines and projects in Brazil, Canada, Chile, Ghana, Mauritania, Russia and the United States. Kinross maintains listings on the Toronto Stock Exchange (symbol:K) and the New York Stock Exchange (symbol:KGC).
Cautionary statement on forward-looking information
All statements, other than statements of historical fact, contained or incorporated by reference in this news release including, but not limited to, any information as to the future financial or operating performance of Kinross, constitute "forward-looking information" or "forward-looking statements" within the meaning of certain securities laws, including the provisions of the Securities Act (Ontario) and the provisions for "safe harbour" under the United States Private Securities Litigation Reform Act of 1995 and are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements contained in this news release include those under the headings Financial and operating highlights", "CEO Commentary", "Outlook", "2013 Mineral Reserves and Mineral Resources update", "Exploration update", and include, without limitation, statements with respect to: our guidance for production; production costs of sales, all-in sustaining cost and capital expenditures; expected savings pursuant to our cost review and reduction initiatives including, without limitation, the continuation of the Way Forward: modifications to projects and operations and our exploration budget, including but not limited to the Tasiast expansion project and our expectations regarding timelines for continued development, including, but not limitation, ramp up at Dvoinoye; as well as references to other possible events, the future price of gold and silver, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration, development and mining activities, permitting timelines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage.
The words "anticipates", "plans", "expects", "indicate", "intend", "scheduled", "estimates", "forecasts", "focus", "guidance", "initiative", "model", "methodology", "outlook", "potential", "projected", "pursue", "strategy", "study", "targets", or "believes", or variations of or similar such words and phrases or statements that certain actions, events or results "may", "could", "would", or "should", "might", or "way forward", "will be taken", "will occur" or "will be achieved" and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Kinross as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates, models and assumptions of Kinross referenced, contained or incorporated by reference in this news release, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth herein and in our most recently filed Annual Information Form and our full-year 2013 Management's Discussion and Analysis as well as:
(1) there being no significant disruptions affecting the operations of the Company or any entity in which it now or hereafter directly or indirectly holds an investment, whether due to labour disruptions, supply disruptions, power disruptions, damage to equipment or otherwise;
(2) permitting, development, operations and expansion at Paracatu (including, without limitation, land acquisitions and permitting for the construction and operation of the new tailings facility) being consistent with our current expectations;
(3) the cessation by the Company of further investment and development of the Fruta del Norte deposit and La Zarza mining concession ("FDN") being consistent with Kinross' current expectations including, without limitation, as to the reasonable cooperation of the Government of Ecuador in ensuring an orderly transition with respect to FDN (including, without limitation, any related transactions) that respects the interests of both parties; continuing recognition of the Company's other remaining mining concessions and other assets, rights, titles and interests in Ecuador; the implementation of Ecuador's mining and investment laws (and prospective amendment to these laws) and related regulations and policies; and compliance with, and the implementation and enforcement of, the Canada-Ecuador Agreement for the Promotion and Reciprocal Protection of Investments;
(4) political and legal developments in any jurisdiction in which the Company, or any entity in which it now or hereafter directly or indirectly holds an investment, operates being consistent with its current expectations including, without limitation, the transition period as we reduce our level of activity in Ecuador and any potential amendments to the Brazilian Mining Code, the Mauritanian Mining Code, the Mauritanian Customs Code, the Mauritanian VAT regime and water legislation or other water use restrictions in Chile, being consistent with Kinross' current expectations;
(5) the exchange rate between the Canadian dollar, Brazilian real, Chilean peso, Russian rouble, Mauritanian ouguiya, Ghanaian cedi and the U.S. dollar being approximately consistent with current levels;
(6) certain price assumptions for gold and silver;
(7) prices for diesel, natural gas, fuel oil, electricity and other key supplies being approximately consistent with current levels;
(8) production and cost of sales forecasts for the Company, and entities in which it now or hereafter directly or indirectly holds an investment, meeting expectations;
(9) the accuracy of the current mineral reserve and mineral resource estimates of the Company (including but not limited to ore tonnage and ore grade estimates);
(10) labour and materials costs increasing on a basis consistent with Kinross' current expectations;
(11) the development of, operations at and production from the Company's operations, including but not limited to ramp up at and production from Dvoinoye and permitting, development and expansion at Tasiast (including but not limited to, expansion optimization initiatives which may lead to changes in processing approach and maintenance, the timing of completion and results of the Tasiast feasibility study, and conversion of adjacent exploration licences to mining licences) being consistent with Kinross' current expectations;
(12) the terms and conditions of the legal and fiscal stability agreements for the Tasiast and Chirano operations being interpreted and applied in a manner consistent with their intent and Kinross' expectations;
(13) goodwill and/or asset impairment potential; and
(14) access to capital markets, including but not limited to maintaining an investment grade debt rating and, as required, securing and maintaining partial project financing for Dvoinoye, Kupol and any expansion at Tasiast, being consistent with the Company's current expectations.
Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements. Such factors include, but are not limited to: our ability to successfully cease further investment in and development of FDN and, in cooperation with the Government of Ecuador, successfully complete an orderly transition with respect to FDN that is respectful of the interests of both parties and does not impose on the Company (and/or any of its directors, officers or employees) any unreasonable obligations or liabilities; litigation commenced, or other claims or actions brought, against the Company (and/or any of its directors, officers or employees) in respect of the cessation by the Company of further investment in and development of FDN, or any of the Company's prior or continuing activities on or in respect thereof or otherwise in Ecuador; fluctuations in the currency markets; fluctuations in the spot and forward price of gold or certain other commodities (such as fuel and electricity); changes in the discount rates applied to calculate the present value of net future cash flows based on country-specific real weighted average cost of capital; changes in the market valuations of peer group gold producers and the Company, and the resulting impact on market price to net asset value multiples; changes in various market variables, such as interest rates, foreign exchange rates, gold or silver prices and lease rates, or global fuel prices, that could impact the mark-to-market value of outstanding derivative instruments and ongoing payments/receipts under any financial obligations; risks arising from holding derivative instruments (such as credit risk, market liquidity risk and mark-to-market risk); changes in national and local government legislation, taxation (including but not limited to income tax, advance income tax, stamp tax, withholding tax, capital tax, tariffs, value-added or sales tax, capital outflow tax, capital gains tax, windfall or windfall profits tax, royalty, excise tax, customs/import or export taxes/duties, asset taxes, asset transfer tax, property use or other real estate tax, together with any related fine, penalty, surcharge, or interest imposed in connection with such taxes), controls, policies and regulations; the security of personnel and assets; political or economic developments in Canada, the United States, Chile, Brazil, Russia, Ecuador, Mauritania, Ghana, or other countries in which Kinross, or entities in which it now or hereafter directly or indirectly holds an interest, do business or may carry on business; business opportunities that may be presented to, or pursued by, us; our ability to successfully integrate acquisitions and complete divestitures; operating or technical difficulties in connection with mining or development activities; employee relations; litigation against the Company including, but not limited to, securities class action litigation in Canada and/or the United States; the speculative nature of gold exploration and development including, but not limited to, the risks of obtaining necessary licenses and permits; diminishing quantities or grades of reserves; adverse changes in our credit rating; and contests over title to properties, particularly title to undeveloped properties. In addition, there are risks and hazards associated with the business of gold exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks).
Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, Kinross' actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, Kinross, including but not limited to resulting in an impairment charge on goodwill and/or assets. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are provided for the purpose of providing information about management's expectations and plans relating to the future. All of the forward-looking statements made in this news release are qualified by these cautionary statements and those made in our other filings with the securities regulators of Canada and the United States including, but not limited to, the cautionary statements made in the "Risk Factors" section of our most recently filed Annual Information Form and full-year 2013 Management Discussion and Analysis. These factors are not intended to represent a complete list of the factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.
Key Sensitivities
Approximately 60%-70% of the Company's costs are denominated in US dollars.
A 10% change in foreign exchange could result in an approximate $12 impact in production cost of sales per ounce(6).
A $10 per barrel change in the price of oil could result in an approximate $3 impact on production cost of sales per ounce.
The impact on royalties of a $100 change in the gold price could result in an approximate $3 impact on cost of sales per ounce.
Other information
Where we say "we", "us", "our", the "Company", or "Kinross" in this news release, we mean Kinross Gold Corporation and/or one or more or all of its subsidiaries, as may be applicable.
The technical information about the Company's material mineral properties (other than exploration activities) contained in this news release has been prepared under the supervision of and verified by Mr. John Sims, an officer of the Company who is a "qualified person" within the meaning of National Instrument 43-101 ("NI-43-101"). The technical information about the Company's exploration activities contained in this news release has been prepared under the supervision of and verified by Dr. Glenton Masterman, an officer of the Company who is a "qualified person" within the meaning of NI 43
‐101.
Reconciliation of non-GAAP financial measures
The Company has included certain non-GAAP financial measures in this document. These measures are not defined under IFRS and should not be considered in isolation. The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. The inclusion of these measures is meant to provide additional information and should not be used as a substitute for performance measures prepared in accordance with IFRS. These measures are not necessarily standard and therefore may not be comparable to other issuers.
Adjusted net earnings attributable to common shareholders and adjusted net earnings per share are non-GAAP measures which determine the performance of the Company, excluding certain impacts which the Company believes are not reflective of the Company's underlying performance for the reporting period, such as the impact of foreign exchange gains and losses, reassessment of prior year taxes and/or taxes otherwise not related to the current period, impairment charges, gains and losses and other one-time costs related to acquisitions, dispositions and other transactions, and non-hedge derivative gains and losses. Although some of the items are recurring, the Company believes that they are not reflective of the underlying operating performance of its current business and are not necessarily indicative of future operating results. Management believes that these measures, which are used internally to assess performance and in planning and forecasting future operating results, provide investors with the ability to better evaluate underlying performance, particularly since the excluded items are typically not included in public guidance. However, adjusted net earnings and adjusted net earnings per share measures are not necessarily indicative of net earnings and earnings per share measures as determined under IFRS.
The following table provides a reconciliation of net earnings (loss) from continuing operations to adjusted net earnings from continuing operations for the periods presented:
GAAP to Adjusted Earnings from Continuing Operations Reconciliation
(in millions, except share and per share amounts) Three months ended
December 31, Years ended
December 31,
2013 2012 2013 2012
Net loss from continuing operations attributable to common shareholders - as reported $ (740.0 ) $ (2,984.9 ) $ (3,012.6 ) $ (2,546.2 )
Adjusting items:
Foreign exchange (gains) losses 6.8 (0.7 ) 21.9 6.8
Non-hedge derivatives (gains) losses - net of tax 1.8 (12.4 ) (2.2 ) (18.8 )
(Gains) losses on sale of other assets - net of tax 1.2 (7.6 ) 1.1 (7.2 )
Foreign exchange loss on translation of tax basis and foreign exchange on deferred income taxes within income tax expense 25.1 40.1 70.6 51.4
Change in deferred income tax due to a change in statutory corporate income tax rate - - - 116.3
Taxes in respect of prior years 7.6 27.5 8.3 28.8
Impairment charges - net of tax 670.6 3,206.1 2,995.0 3,206.1
Impairment of investments 3.0 4.1 240.3 24.3
Reclamation and remediation expense - net of tax (1.2 ) 8.3 (1.2 ) 8.3
Severance expense - - - 16.4
714.9 3,265.4 3,333.8 3,432.4
Net earnings (loss) from continuing operations attributable to common shareholders - Adjusted $ (25.1 ) $ 280.5 $ 321.2 $ 886.2
Weighted average number of common shares outstanding - Basic 1,143.3 1,139.8 1,142.1 1,139.1
Net earnings (loss) from continuing operations per share - Adjusted $ (0.02 ) $ 0.25 $ 0.28 $ 0.78
The Company makes reference to a non-GAAP measure for adjusted operating cash flow and adjusted operating cash flow per share. Adjusted operating cash flow is defined as cash flow from operations excluding certain impacts which the Company believes are not reflective of the Company's regular operating cash flow, and excluding changes in working capital. Working capital can be volatile due to numerous factors, including the timing of tax payments, and in the case of Kupol, a build-up of inventory due to transportation logistics. The Company uses adjusted operating cash flow internally as a measure of the underlying operating cash flow performance and future operating cash flow-generating capability of the Company. However, adjusted operating cash flow and adjusted operating cash flow per share measures are not necessarily indicative of net cash flow from operations as determined under IFRS.
The following table provides a reconciliation of adjusted operating cash flow from continuing operations for the periods presented:
GAAP to Adjusted Operating Cash Flow from Continuing Operations
(in millions, except share and per share amounts) Three months ended
December 31, Years ended
December 31,
2013 2012 2013 2012
Net cash flow of continuing operations used in operating activities - as reported $ 187.2 $ 487.4 $ 796.6 $ 1,317.3
Adjusting items:
Close out and early settlement of derivative instruments - - - (48.7 )
Working capital changes:
Accounts receivable and other assets (72.9 ) (30.7 ) 27.7 22.5
Inventories 78.7 138.4 197.5 298.2
Accounts payable and other liabilities, including taxes 29.8 (89.8 ) 127.8 (62.3 )
35.6 17.9 353.0 209.7
Adjusted operating cash flow from continuing operations $ 222.8 $ 505.3 $ 1,149.6 $ 1,527.0
Weighted average number of common shares outstanding - Basic 1,143.3 1,139.8 1,142.1 1,139.1
Adjusted operating cash flow from continuing operations per share $ 0.19 $ 0.44 $ 1.01 $ 1.34
Consolidated production cost of sales per gold equivalent ounce sold is a non-GAAP measure and is defined as production cost of sales as per the consolidated financial statements divided by the total number of gold equivalent ounces sold. This measure converts the Company's non-gold production into gold equivalent ounces and credits it to total production.
Attributable production cost of sales per gold equivalent ounce sold is a non-GAAP measure and is defined as attributable production cost of sales divided by the attributable number of gold equivalent ounces sold. This measure converts the Company's non-gold production into gold equivalent ounces and credits it to total production.
Management uses these measures to monitor and evaluate the performance of its operating properties. The following table presents a reconciliation of consolidated and attributable production cost of sales per equivalent ounce sold for the periods presented:
Consolidated and Attributable Production Cost of Sales from Continuing Operations Per Equivalent Ounce Sold
(in millions, except ounces and production cost of sales per equivalent ounce) Three months ended
December 31, Years ended
December 31,
2013 2012 2013 2012
Production cost of sales from continuing operations - as reported(1) $ 528.4 $ 477.6 $ 2,004.4 $ 1,849.2
Less: portion attributable to Chirano non-controlling interest (5.8 ) (6.1 ) (21.2 ) (21.5 )
Attributable production cost of sales from continuing operations $ 522.6 $ 471.5 $ 1,983.2 $ 1,827.7
Gold equivalent ounces sold from continuing operations 691,300 695,934 2,697,093 2,621,343
Less: portion attributable to Chirano non-controlling interest (7,881 ) (8,772 ) (27,817 ) (29,865 )
Attributable gold equivalent ounces sold from continuing operations 683,419 687,162 2,669,276 2,591,478
Consolidated production cost of sales from continuing operations per equivalent ounce sold $ 764 $ 686 $ 743 $ 705
Attributable production cost of sales from continuing operations per equivalent ounce sold $ 765 $ 686 $ 743 $ 705
(1) "Production cost of sales" is equivalent to "Total cost of sales" per the consolidated financial statements less depreciation, depletion and amortization and impairment charges.
Attributable production cost of sales per ounce sold on a by-product basis is a non-GAAP measure which calculates the Company's non-gold production as a credit against its per ounce production costs, rather than converting its non-gold production into gold equivalent ounces and crediting it to total production, as is the case in co-product accounting. Management believes that this measure provides investors with the ability to better evaluate Kinross' production cost of sales per ounce on a comparable basis with other major gold producers who routinely calculate their cost of sales per ounce using by-product accounting rather than co-product accounting.
The following table provides a reconciliation of attributable production cost of sales per ounce sold on a by-product basis for the periods presented:
Attributable Production Cost of Sales from Continuing Operations Per Ounce Sold on a By-Product Basis
(in millions, except ounces and production cost of sales per ounce) Three months ended
December 31, Years ended
December 31,
2013 2012 2013 2012
Production cost of sales from continuing operations - as reported(1) $ 528.4 $ 477.6 $ 2,004.4 $ 1,849.2
Less: portion attributable to Chirano non-controlling interest (5.8 ) (6.1 ) (21.2 ) (21.5 )
Less: attributable silver revenues from continuing operations (50.9 ) (87.3 ) (211.9 ) (328.3 )
Attributable production cost of sales from continuing operations net of silver by-product revenue $ 471.7 $ 384.2 $ 1,771.3 $ 1,499.4
Gold ounces sold from continuing operations 651,732 644,073 2,545,736 2,421,447
Less: portion attributable to Chirano non-controlling interest (7,868 ) (8,760 ) (27,745 ) (29,795 )
Attributable gold ounces sold from continuing operations 643,864 635,313 2,517,991 2,391,652
Attributable production cost of sales from continuing operations per ounce sold on a by-product basis $ 733 $ 605 $ 703 $ 627
(1) "Production cost of sales" is equivalent to "Total cost of sales" per the consolidated financial statements less depreciation, depletion and amortization and impairment charges.
In June 2013, the World Gold Council ("WGC") published its guidelines for reporting all-in sustaining costs. The WGC is a market development organization for the gold industry and is an association whose membership comprises leading gold mining companies including Kinross. Although the WGC is not a mining industry regulatory organization, it worked closely with its member companies to develop this non-GAAP measure. Adoption of this all-in sustaining cost metric is voluntary and not necessarily standard, and therefore, this measure presented by the Company may not be comparable to similar measures presented by other issuers. The Company believes that the all-in sustaining cost measure complements existing measures reported by Kinross in order to reflect the total current period cost of producing gold from operations.
All-in sustaining cost includes both operating and capital costs required to sustain gold production on an ongoing basis. The value of silver sold is deducted from the total production cost of sales as it is considered residual production. Sustaining operating costs represent expenditures incurred at current operations that are considered necessary to maintain current production. Sustaining capital represents capital expenditures at existing operations comprising mine development costs and ongoing replacement of mine equipment and other capital facilities, and does not include capital expenditures for major growth projects or enhancement capital for significant infrastructure improvements at existing operations.
Attributable all-in sustaining cost from continuing operations per ounce sold on a by-product basis is calculated by adjusting total production cost of sales, as reported on the interim condensed consolidated statement of operations, as follows:
Attributable All-in Sustaining Cost from Continuing Operations Per Ounce Sold on a By-Product Basis
Three months ended Years ended
December 31, December 31,
(in millions, except ounces and production cost of sales per ounce) 2013 2012 2013 2012
Production cost of sales from continuing operations - as reported(1) $ 528.4 $ 477.6 $ 2,004.4 $ 1,849.2
Less: portion attributable to Chirano non-controlling interest(2) (5.8 ) (6.1 ) (21.2 ) (21.5 )
Less: attributable(3) silver revenues from continuing operations(4) (50.9 ) (87.3 ) (211.9 ) (328.3 )
Attributable(3) production cost of sales from continuing operations net of silver by-product revenue $ 471.7 $ 384.2 $ 1,771.3 $ 1,499.4
Adjusting items on an attributable(3) basis:
General and administrative(5) 52.1 43.1 176.6 162.7
Other operating expense (income) - sustaining(6) (3.3 ) 14.0 15.4 42.3
Reclamation and remediation(7) 12.0 13.3 57.1 49.5
Exploration and business development - sustaining(8) 10.1 16.6 78.4 119.4
Additions to property, plant and equipment - sustaining(9) 209.8 134.0 577.6 706.5
All-in Sustaining Cost on a by-product basis - attributable(3) $ 752.4 $ 605.2 $ 2,676.4 $ 2,579.8
Gold ounces sold from continuing operations 651,732 644,073 2,545,736 2,421,447
Less: portion attributable to Chirano non-controlling interest(10) (7,868 ) (8,760 ) (27,745 ) (29,795 )
Attributable(3) gold ounces sold from continuing operations 643,864 635,313 2,517,991 2,391,652
Attributable(3) all-in sustaining cost from continuing operations per ounce sold on a by-product basis $ 1,169 $ 953 $ 1,063 $ 1,079
The Company also assesses its all-in sustaining costs on a gold equivalent ounce basis. Under this non-GAAP measure the Company's production of silver is converted into gold equivalent ounces and credited to total production.
Attributable all-in sustaining cost from continuing operations per equivalent ounce sold is calculated by adjusting total production cost of sales, as reported on the interim condensed consolidated statement of operations, as follows:
Attributable All-in Sustaining Cost from Continuing Operations Per Equivalent Ounce Sold
Three months ended Years ended
December 31, December 31,
(in millions, except ounces and production cost of sales per ounce) 2013 2012 2013 2012
Production cost of sales from continuing operations - as reported(1) $ 528.4 $ 477.6 $ 2,004.4 $ 1,849.2
Less: portion attributable to Chirano non-controlling interest(2) (5.8 ) (6.1 ) (21.2 ) (21.5 )
Attributable(3) production cost of sales from continuing operations $ 522.6 $ 471.5 $ 1,983.2 $ 1,827.7
Adjusting items on an attributable(3) basis:
General and administrative(5) 52.1 43.1 176.6 162.7
Other operating expense (income) - sustaining(6) (3.3 ) 14.0 15.4 42.3
Reclamation and remediation(7) 12.0 13.3 57.1 49.5
Exploration and business development - sustaining(8) 10.1 16.6 78.4 119.4
Additions to property, plant and equipment - sustaining(9) 209.8 134.0 577.6 706.5
All-in Sustaining Cost - attributable(3) $ 803.3 $ 692.5 $ 2,888.3 $ 2,908.1
Gold equivalent ounces sold from continuing operations 691,300 695,934 2,697,093 2,621,343
Less: portion attributable to Chirano non-controlling interest(10) (7,881 ) (8,772 ) (27,817 ) (29,865 )
Attributable(3) gold equivalent ounces sold from continuing operations 683,419 687,162 2,669,276 2,591,478
Attributable(3) all-in sustaining cost from continuing operations per equivalent ounce sold $ 1,175 $ 1,008 $ 1,082 $ 1,122
(1) "Production cost of sales" is equivalent to "Total cost of sales" per the financial statements less depreciation, depletion and amortization and impairment charges.
(2) "Portion attributable to Chirano non-controlling interest" represents the non-controlling interest (10%) in the production cost of sales for the Chirano mine.
(3) "Attributable" includes Kinross' share of Chirano (90%) production.
(4) "Attributable silver revenues from continuing operations" represents the attributable portion of metal sales realized from the production of the secondary or by-product metal (i.e. silver). Revenue from the sale of silver, which is produced as a by-product of the process used to produce gold, effectively reduces the cost of gold production.
(5) "General and administrative" expenses is as reported on the consolidated statement of operations, net of certain severance expenses. General and administrative expenses are considered sustaining costs as they are required to be absorbed on a continuing basis for the effective operation and governance of the Company.
(6) "Other operating expense - sustaining" is calculated as "Other operating expense" as reported on the consolidated statement of operations, less other operating expenses related to non-sustaining activities. Other operating expenses are classified as either sustaining or non-sustaining based on the type and location of the expenditure incurred. The majority of other operating expenses that are incurred at existing operations are considered costs necessary to sustain operations, and are therefore classified as sustaining. Other operating expenses incurred at locations where there is no current operation or related to other non-sustaining activities are classified as non-sustaining.
(7) "Reclamation and remediation" is calculated as current period accretion related to reclamation and remediation obligations plus current period amortization of the corresponding reclamation and remediation assets, and is intended to reflect the periodic cost of reclamation and remediation for currently operating mines. Reclamation and remediation costs for development projects or closed mines are excluded from this amount.
(8) "Exploration and business development - sustaining" is calculated as "Exploration and business development" expenses as reported on the consolidated statement of operations, less non-sustaining exploration expenses. Exploration expenses are classified as either sustaining or non-sustaining based on a determination of the type and location of the exploration expenditure. Exploration expenditures within the footprint of operating mines are considered costs required to sustain current operations and so are included in sustaining costs. Exploration expenditures focused on new ore bodies near existing mines (i.e. brownfield), new exploration projects (i.e. greenfield) or for other generative exploration activity not linked to existing mining operations are classified as non-sustaining. Business development expenses are included in this amount as they are considered sustaining costs required for general operations.
(9) "Additions to property, plant and equipment - sustaining" represents the majority of capital expenditures at existing operations including capitalized exploration costs, capitalized stripping and underground mine development costs, ongoing replacement of mine equipment and other capital facilities and other capital expenditures and is calculated as total additions to property, plant and equipment (as reported on the consolidated statement of cash flows), less capitalized interest and non-sustaining capital. Non-sustaining capital represents capital expenditures for major growth projects as well as enhancement capital for significant infrastructure improvements at existing operations.
(10) "Portion attributable to Chirano non-controlling interest" represents the non-controlling interest (10%) in the ounces sold for the Chirano mine.
Review of Operations
Three months ended December 31, Gold equivalent ounces
Produced Sold Production
cost of sales(1)
($ millions) Production
cost of
sales(1)/oz
2013 2012 2013 2012 2013 2012 2013 2012
Fort Knox 103,612 119,582 79,236 100,923 $ 47.3 $ 49.8 $ 597 $ 493
Round Mountain 40,316 41,220 39,963 41,371 36.6 32.6 916 788
Kettle River - Buckhorn 30,642 33,548 30,995 33,242 19.0 15.4 613 463
North America Total 174,570 194,350 150,194 175,536 102.9 97.8 685 557
Kupol 153,529 146,535 200,141 130,759 95.6 62.0 478 474
Russia Total 153,529 146,535 200,141 130,759 95.6 62.0 478 474
Paracatu 124,694 132,114 127,349 137,534 113.5 109.8 891 798
La Coipa 16,737 63,429 25,392 58,935 31.6 43.1 1,244 731
Maricunga 45,595 64,568 44,783 61,046 54.5 56.6 1,217 927
South America Total 187,026 260,111 197,524 257,515 199.6 209.5 1,011 814
Tasiast 62,963 46,051 64,629 44,400 72.5 47.1 1,122 1,061
Chirano (100%) 75,717 86,070 78,812 87,724 57.8 61.2 733 698
West Africa Total 138,680 132,121 143,441 132,124 130.3 108.3 908 820
Continuing operations 653,805 733,117 691,300 695,934 528.4 477.6 764 686
Discontinued operations(2) - - - - - - - -
Operations Total 653,805 733,117 691,300 695,934 $ 528.4 $ 477.6 $ 764 $ 686
Less Chirano non-controlling interest (10%) (7,571 ) (8,607 ) (7,881 ) (8,772 ) (5.8 ) (6.1 )
Attributable - Continuing operations 646,234 724,510 683,419 687,162 $ 522.6 $ 471.5 $ 765 $ 686
Attributable Total 646,234 724,510 683,419 687,162 $ 522.6 $ 471.5 $ 765 $ 686
(1) "Production cost of sales" is equivalent to "Total cost of sales" per the consolidated financial statements less depreciation, depletion and amortization and impairment charges.
(2) On June 28, 2012, the Company completed the sale of its 50% interest in the Crixás gold mine.
Years ended December 31, Gold equivalent ounces
Produced Sold Production
cost of sales(1)
($ millions) Production
cost of
sales(1)/oz
2013 2012 2013 2012 2013 2012 2013 2012
Fort Knox 421,641 359,948 416,103 333,438 $ 236.6 $ 221.2 $ 569 $ 663
Round Mountain 162,826 192,330 161,836 190,592 135.3 136.7 836 717
Kettle River - Buckhorn 150,157 156,093 151,559 156,966 83.1 75.6 548 482
North America Total 734,624 708,371 729,498 680,996 455.0 433.5 624 637
Kupol 550,188 578,252 569,432 578,235 288.6 272.9 507 472
Russia Total 550,188 578,252 569,432 578,235 288.6 272.9 507 472
Paracatu 500,380 466,709 507,953 471,387 424.9 415.4 836 881
La Coipa 162,405 178,867 174,548 175,212 142.2 167.6 815 957
Maricunga 187,815 236,369 192,537 237,294 225.3 184.8 1,170 779
South America Total 850,600 881,945 875,038 883,893 792.4 767.8 906 869
Tasiast 247,818 185,334 244,954 179,568 256.7 159.7 1,048 889
Chirano (100%) 275,402 293,235 278,171 298,651 211.7 215.3 761 721
West Africa Total 523,220 478,569 523,125 478,219 468.4 375.0 895 784
Continuing operations 2,658,632 2,647,137 2,697,093 2,621,343 2,004.4 1,849.2 743 705
Discontinued operations(2) - 30,994 - 32,764 - 27.4 - 836
Operations Total 2,658,632 2,678,131 2,697,093 2,654,107 $ 2,004.4 $ 1,876.6 $ 743 707
Less Chirano non-controlling interest (10%) (27,540 ) (29,324 ) (27,817 ) (29,865 ) (21.2 ) (21.5 )
Attributable - Continuing operations 2,631,092 2,617,813 2,669,276 2,591,478 $ 1,983.2 $ 1,827.7 $ 743 705
Attributable Total 2,631,092 2,648,807 2,669,276 2,624,242 $ 1,983.2 $ 1,855.1 $ 743 707
(1) "Production cost of sales" is equivalent to "Total cost of sales" per the consolidated financial statements less depreciation, depletion and amortization and impairment charges.
(2) On June 28, 2012, the Company completed the sale of its 50% interest in the Crixás gold mine.
Consolidated balance sheets
(expressed in millions of United States dollars, except share amounts)
As at
December 31, December 31, January 1,
2013 2012 2012
Assets
Current assets
Cash and cash equivalents $ 734.5 $ 1,632.7 $ 1,724.8
Restricted cash 59.0 58.1 56.1
Short-term investments - 349.8 1.3
Accounts receivable and other assets 284.3 280.9 304.7
Inventories 1,322.9 1,254.9 961.7
Unrealized fair value of derivative assets 5.1 15.0 2.8
2,405.8 3,591.4 3,051.4
Non-current assets
Property, plant and equipment 6,582.7 8,968.1 8,855.0
Goodwill 308.0 1,136.7 3,382.3
Long-term investments 20.4 49.1 79.3
Investments in associate and joint ventures 315.2 536.1 654.9
Unrealized fair value of derivative assets 0.6 9.6 1.1
Deferred charges and other long-term assets 490.5 545.5 403.1
Deferred tax assets 163.5 46.1 21.8
Total assets $ 10,286.7 $ 14,882.6 $ 16,448.9
Liabilities
Current liabilities
Accounts payable and accrued liabilities $ 544.5 $ 636.2 $ 562.0
Current tax payable 27.0 93.2 67.6
Current portion of long-term debt 60.0 516.2 31.9
Current portion of provisions 40.1 42.0 37.6
Current portion of unrealized fair value of derivative liabilities 41.3 22.0 66.7
712.9 1,309.6 765.8
Non-current liabilities
Long-term debt 2,059.6 2,116.4 1,599.4
Provisions 683.9 720.4 584.0
Unrealized fair value of derivative liabilities 14.0 10.5 32.7
Other long-term liabilities 192.7 125.6 132.4
Deferred tax liabilities 533.7 674.4 863.9
Total liabilities 4,196.8 4,956.9 3,978.2
Equity
Common shareholders' equity
Common share capital and common share purchase warrants $ 14,737.1 $ 14,692.5 $ 14,656.6
Contributed surplus 84.5 89.9 81.4
Accumulated deficit (8,771.1 ) (4,937.1 ) (2,249.9 )
Accumulated other comprehensive income (loss) (36.5 ) 4.9 (97.7 )
Total common shareholders' equity 6,014.0 9,850.2 12,390.4
Non-controlling interest 75.9 75.5 80.3
Total equity 6,089.9 9,925.7 12,470.7
Total liabilities and equity $ 10,286.7 $ 14,882.6 $ 16,448.9
Common shares
Authorized Unlimited Unlimited Unlimited
Issued and outstanding 1,143,428,055 1,140,132,123 1,137,732,344
Consolidated statements of operations
(expressed in millions of United States dollars, except per share and share amounts)
Years ended
December 31, December 31,
2013 2012
Revenue
Metal sales $ 3,779.5 $ 4,307.3
Cost of sales
Production cost of sales 2,004.4 1,849.2
Depreciation, depletion and amortization 828.8 680.9
Impairment charges 3,169.6 3,527.6
Total cost of sales 6,002.8 6,057.7
Gross loss (2,223.3 ) (1,750.4 )
Other operating expense 88.2 82.6
Exploration and business development 147.1 229.8
General and administrative 176.6 179.1
Operating loss (2,635.2 ) (2,241.9 )
Other income (expense) - net (259.1 ) (6.8 )
Equity in gains (losses) of associate and joint venture (10.3 ) (6.2 )
Finance income 7.6 5.3
Finance expense (42.8 ) (42.0 )
Loss before tax (2,939.8 ) (2,291.6 )
Income tax expense - net (72.4 ) (259.4 )
Loss from continuing operations after tax (3,012.2 ) (2,551.0 )
Earnings (loss) from discontinued operations after tax (730.1 ) 41.3
Net loss $ (3,742.3 ) $ (2,509.7 )
Net earnings (loss) from continuing operations attributable to:
Non-controlling interest $ 0.4 $ (4.8 )
Common shareholders $ (3,012.6 ) $ (2,546.2 )
Net earnings (loss) attributable to:
Non-controlling interest $ 0.4 $ (4.8 )
Common shareholders $ (3,742.7 ) $ (2,504.9 )
Loss per share from continuing operations attributable to common shareholders
Basic $ (2.64 ) $ (2.24 )
Diluted $ (2.64 ) $ (2.24 )
Loss per share attributable to common shareholders
Basic $ (3.28 ) $ (2.20 )
Diluted $ (3.28 ) $ (2.20 )
Weighted average number of common shares outstanding (millions)
Basic 1,142.1 1,139.1
Diluted 1,142.1 1,139.1
Consolidated statements of cash flows
(expressed in millions of United States dollars)
Years ended
December 31, December 31,
2013 2012
Net inflow (outflow) of cash related to the following activities:
Operating:
Net loss from continuing operations $ (3,012.2 ) $ (2,551.0 )
Adjustments to reconcile net loss from continuing operations to net cash provided from (used in) operating activities:
Depreciation, depletion and amortization 828.8 680.9
Losses (gains) on sale of other assets - net 1.1 (7.2 )
Impairment charges 3,169.6 3,527.6
Impairment of investments 240.3 24.3
Equity in losses (gains) of associate and joint venture 10.3 6.2
Non-hedge derivative gains - net (2.6 ) (18.0 )
Settlement of derivative instruments 0.2 52.9
Share-based compensation expense 32.9 38.0
Accretion expense 20.6 24.8
Deferred tax recovery (247.5 ) (221.8 )
Foreign exchange losses and other 109.1 8.2
Reclamation expense (1.0 ) 10.8
Changes in operating assets and liabilities:
Accounts receivable and other assets (27.7 ) (22.5 )
Inventories (197.5 ) (298.2 )
Accounts payable and accrued liabilities 157.6 479.0
Cash flow provided from operating activities 1,082.0 1,734.0
Income taxes paid (285.4 ) (416.7 )
Net cash flow of continuing operations provided from operating activities 796.6 1,317.3
Net cash flow of discontinued operations used in operating activities (21.9 ) (7.2 )
Investing:
Additions to property, plant and equipment (1,262.4 ) (1,858.3 )
Net additions to long-term investments and other assets (131.2 ) (68.5 )
Net proceeds from the sale of property, plant and equipment 6.1 2.7
Disposals of (additions to) short-term investments 349.8 (348.7 )
Decrease in restricted cash (1.2 ) (2.0 )
Interest received 7.6 4.9
Other 0.2 0.3
Net cash flow of continuing operations used in investing activities (1,031.1 ) (2,269.6 )
Net cash flow of discontinued operations provided from (used) in investing activities (14.3 ) 92.2
Financing:
Issuance of common shares on exercise of options and warrants 6.2 6.4
Proceeds from issuance of debt - 1,541.1
Repayment of debt (523.3 ) (577.3 )
Interest paid (5.0 ) (8.1 )
Dividends paid to common shareholders (91.3 ) (182.3 )
Other (2.1 ) (5.0 )
Net cash flow of continuing operations provided from (used in) financing activities (615.5 ) 774.8
Net cash flow of discontinued operations used in financing activities - -
Effect of exchange rate changes on cash and cash equivalents of continuing operations (12.0 ) 0.4
Decrease in cash and cash equivalents (898.2 ) (92.1 )
Cash and cash equivalents, beginning of period 1,632.7 1,724.8
Cash and cash equivalents, end of period $ 734.5 $ 1,632.7
Operating Summary
Mine Period Ownership Tonnes
Ore
Mined(1) Ore
Processed
(Milled)(1) Ore
Processed
(Heap
Leach)(1) Grade
(Mill) Grade
(Heap Leach) Recovery
(2) Gold Eq
Production
(6) Gold Eq
Sales(6) Production
costs of
sales(7) Production
cost of
sales(7)/oz Cap Ex(9) DD&A
(%) ('000 tonnes) ('000 tonnes) ('000 tonnes) (g/t) (g/t) (%) (ounces) (ounces) ($ millions) ($/ounce) ($ millions) ($ millions)
North America Fort Knox Q4 2013 100 4,659 3,169 8,624 0.86 0.28 84 % 103,612 79,236 $ 47.3 $ 597 $ 28.8 $ 21.2
Q3 2013 100 4,566 3,374 10,330 0.76 0.28 84 % 122,037 119,835 $ 66.5 $ 555 $ 29.2 $ 30.0
Q2 2013 100 5,048 3,231 10,261 0.80 0.30 84 % 102,740 98,998 56.9 575 27.9 25.3
Q1 2013 100 7,361 2,894 536 0.88 0.25 84 % 93,252 118,034 65.9 558 49.4 27.2
Q4 2012 100 7,805 3,273 6,530 1.03 0.30 84 % 119,582 100,923 49.8 493 37.8 20.7
Round Mountain Q4 2013 50 5,130 1,025 4,128 0.86 0.36 58 % 40,316 39,963 36.6 916 23.9 5.4
Q3 2013 50 3,974 982 3,090 0.67 0.33 66 % 42,073 40,042 32.5 812 15.7 2.8
Q2 2013 50 4,070 868 4,098 0.56 0.34 68 % 41,016 43,035 35.0 813 13.5 9.3
Q1 2013 50 6,474 936 6,468 0.64 0.38 75 % 39,421 38,796 31.2 804 10.0 4.9
Q4 2012 50 3,820 867 3,864 0.68 0.40 70 % 41,220 41,371 32.6 788 18.8 5.4
Kettle River Q4 2013 100 91 86 - 13.10 - 94 % 30,642 30,995 19.0 613 3.2 12.8
Q3 2013 100 89 91 - 12.50 - 95 % 34,601 34,876 21.0 602 3.1 14.8
Q2 2013 100 96 106 - 13.09 - 94 % 45,044 46,015 22.8 495 1.1 18.8
Q1 2013 100 91 121 - 13.21 - 92 % 39,870 39,673 20.3 512 1.2 16.4
Q4 2012 100 101 87 - 13.96 - 93 % 33,548 33,242 15.4 463 4.7 15.1
Russia Kupol (4)(5)(8) Q4 2013 100 457 424 - 11.35 - 92 % 153,529 200,141 95.6 478 29.2 39.2
Q3 2013 100 379 377 - 11.37 - 94 % 150,433 120,865 62.2 515 30.0 20.7
Q2 2013 100 318 306 - 11.16 - 94 % 121,728 164,627 84.9 516 20.7 27.9
Q1 2013 100 338 328 - 10.57 - 93 % 124,498 83,799 45.9 548 29.0 14.9
Q4 2012 100 337 329 - 11.89 - 93 % 146,535 130,759 62.0 474 21.5 24.6
South America Paracatu Q4 2013 100 14,024 13,874 - 0.37 - 76 % 124,694 127,349 113.5 891 70.1 30.2
Q3 2013 100 14,600 14,306 - 0.39 - 76 % 135,548 140,333 108.1 770 39.9 27.6
Q2 2013 100 13,836 13,451 - 0.37 - 75 % 120,247 118,243 101.9 862 25.7 26.3
Q1 2013 100 13,971 14,068 - 0.37 - 75 % 119,891 122,028 101.4 831 14.4 26.1
Q4 2012 100 15,791 13,692 - 0.39 - 75 % 132,114 137,534 109.8 798 61.7 31.5
La Coipa (3) Q4 2013 100 107 421 - 0.93 - 72 % 16,737 25,392 31.6 1,244 6.2 18.9
Q3 2013 100 577 1,373 - 0.80 - 86 % 43,702 45,340 34.3 757 1.1 25.7
Q2 2013 100 584 1,331 - 0.93 - 88 % 48,237 46,574 36.0 773 2.2 29.5
Q1 2013 100 990 1,400 - 0.97 - 84 % 53,729 57,242 40.3 704 1.5 36.8
Q4 2012 100 1,298 1,421 - 1.07 - 86 % 63,429 58,935 43.2 733 8.4 26.8
Maricunga Q4 2013 100 5,780 - 4,107 - 0.68 nm 45,595 44,783 54.5 1,217 26.0 14.9
Q3 2013 100 4,197 - 3,431 - 0.63 nm 38,126 37,800 51.7 1,368 5.3 11.7
Q2 2013 100 3,807 - 3,659 - 0.53 nm 49,032 55,163 59.3 1,075 10.2 11.0
Q1 2013 100 4,452 - 3,861 - 0.57 nm 55,062 54,791 59.8 1,091 16.3 32.3
Q4 2012 100 5,704 - 3,937 - 0.59 nm 64,568 61,046 56.6 927 0.5 5.4
West Africa Tasiast Q4 2013 100 9,189 636 3,197 2.21 0.56 92 % 62,963 64,629 72.5 1,122 105.6 20.4
Q3 2013 100 6,218 577 3,197 1.83 0.46 93 % 51,051 49,455 57.4 1,161 161.8 11.7
Q2 2013 100 5,314 652 3,838 2.03 0.29 92 % 71,047 62,489 66.6 1,066 186.2 28.4
Q1 2013 100 6,164 639 4,154 1.87 0.35 91 % 62,757 68,381 60.2 880 155.6 33.3
Q4 2012 100 9,522 659 3,681 1.31 0.59 91 % 46,051 44,400 47.1 1,061 291.6 23.1
Chirano - 100% Q4 2013 90 970 861 - 2.95 - 94 % 75,717 78,812 57.8 733 29.2 41.4
Q3 2013 90 985 829 - 2.65 - 95 % 70,010 69,509 53.1 764 11.6 37.2
Q2 2013 90 826 854 - 2.50 - 94 % 62,545 60,397 50.1 830 27.2 31.7
Q1 2013 90 1,005 816 - 2.73 - 93 % 67,130 69,453 50.7 730 28.1 33.8
Q4 2012 90 1,311 879 - 3.27 - 94 % 86,070 87,724 61.2 698 41.3 45.1
Chirano - 90% Q4 2013 90 970 861 - 2.95 - 94 % 68,146 70,931 52.0 733 26.3 37.3
Q3 2013 90 985 829 - 2.65 - 95 % 63,009 62,558 47.8 764 10.4 33.5
Q2 2013 90 826 854 - 2.50 - 94 % 56,290 54,357 45.1 830 24.5 28.5
Q1 2013 90 1,005 816 - 2.73 - 93 % 60,417 62,508 45.6 730 25.3 30.4
Q4 2012 90 1,311 879 - 3.27 - 94 % 77,463 78,952 55.1 698 37.2 40.6
(1) Ore processed is to 100%, production and costs are to Kinross' account.
(2) Due to the nature of heap leach operations, recovery rates at Maricunga cannot be accurately measured on a quarterly basis. Recovery rates at Fort Knox, Round Mountain and Tasiast represent mill recovery only.
(3) La Coipa silver grade and recovery were as follows: Q4 (2013) 34.94 g/t, 58%; Q3 (2013) 32.03 g/t, 60%; Q2 (2013) 32.45 g/t, 61%; Q1 (2013) 35.61 g/t, 58%; Q4 (2012) 49.45 g/t, 50%
(4) The Kupol segment includes the Kupol and Dvoinoye mines.
(5) Kupol silver grade and recovery were as follows: Q4 (2013) 131.91 g/t, 92%; Q3 (2013) 136.33 g/t, 86%; Q2 (2013) 139.03 g/t, 83%; Q1 (2013) 128.44 g/t, 85%; Q4 (2012) 155.53 g/t, 85%
(6) Gold equivalent ounces include silver ounces produced and sold converted to a gold equivalent based on the ratio of the average spot market prices for the commodities for each period. The ratios for the quarters presented are as follows: Q4 2013: 61.18:1, Q3 2013: 62.21:1, Q2 2013: 61.14:1, Q1 2013: 54.19:1, Q4 2012: 52.55:1.
(7) "Production cost of sales" is equivalent to "Total cost of sales" per the consolidated financial statements less depreciation, depletion and amortization and impairment charges.
(8) Dvoinoye ore processed and grade were as follows: Q4 (2013) 26,743 tonnes, 28.15 g/t; Q3 (2013) 13,000 tonnes, 30.03 g/t; Q2 (2013) nil, nil; Q1 (2013) nil, nil; Q4 (2012) nil, nil
(9) Capital expenditures are presented on a cash basis, consistent with the statement of cash flows.
Proven and Probable Mineral Reserves
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT GOLD
PROVEN AND PROBABLE MINERAL RESERVES (1), (3), (4), (5), (6), (8), (9), (10), (11)
Kinross Gold Corporation's Share at December 31, 2013
Proven Probable Proven and Probable
Property Location Kinross
Interest Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(%) (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz)
NORTH AMERICA
Fort Knox Area USA 100.0 % 83,804 0.41 1,109 99,307 0.55 1,752 183,111 0.49 2,861
Kettle River USA 100.0 % 428 10.40 143 - - - 428 10.40 143
Round Mountain Area USA 50.0 % 16,543 0.74 394 25,604 0.64 525 42,147 0.68 919
SUBTOTAL 100,775 0.51 1,646 124,911 0.57 2,277 225,686 0.54 3,923
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 57,425 0.65 1,195 241,975 0.59 4,616 299,400 0.60 5,811
Fruta del Norte Ecuador 100.0 % - - - - - - - - -
La Coipa (9) Chile 100.0 % 5 0.50 - - - - 5 0.50 -
Lobo Marte (10), (11) Chile 100.0 % - - - 164,230 1.14 6,028 164,230 1.14 6,028
Maricunga Area Chile 100.0 % 47,429 0.73 1,110 43,166 0.77 1,071 90,595 0.75 2,181
Paracatu Brazil 100.0 % 556,292 0.41 7,371 207,416 0.45 3,030 763,708 0.42 10,401
SUBTOTAL 661,151 0.46 9,676 656,787 0.70 14,745 1,317,938 0.58 24,421
AFRICA
Chirano Ghana 90.0 % 8,644 1.43 398 6,609 4.79 1,017 15,253 2.89 1,415
Tasiast Mauritania 100.0 % 20,567 1.98 1,308 69,148 2.35 5,235 89,715 2.27 6,543
SUBTOTAL 29,211 1.82 1,706 75,757 2.57 6,252 104,968 2.36 7,958
RUSSIA
Dvoinoye Russia 100.0 % 142 16.87 77 1,974 19.23 1,220 2,116 19.07 1,297
Kupol Russia 100.0 % 1,598 8.85 455 5,813 8.70 1,626 7,411 8.73 2,081
SUBTOTAL 1,740 8.85 532 7,787 11.37 2,846 9,527 11.03 3,378
TOTAL GOLD 792,877 0.53 13,560 865,242 0.94 26,120 1,658,119 0.74 39,680
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT SILVER
PROVEN AND PROBABLE MINERAL RESERVES (1), (3), (4), (5), (6), (8), (9)
Kinross Gold Corporation's Share at December 31, 2013
Proven Probable Proven and Probable
Property Location Kinross
Interest Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(%) (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz)
NORTH AMERICA
Round Mountain Area USA 50.0 % 56 9.9 18 6,059 8.7 1,688 6,115 8.7 1,706
SUBTOTAL 56 9.9 18 6,059 8.7 1,688 6,115 8.7 1,706
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 57,425 1.9 3,522 241,975 1.4 11,150 299,400 1.5 14,672
Fruta del Norte Ecuador 100.0 % - - - - - - - - -
La Coipa (9) Chile 100.0 % 5 32.8 5 - - - 5 32.8 5
SUBTOTAL 57,430 1.9 3,527 241,975 1.4 11,150 299,405 1.5 14,677
RUSSIA
Dvoinoye Russia 100.0 % 142 20.8 95 1,974 29.1 1,843 2,116 28.5 1,938
Kupol Russia 100.0 % 1,598 118.0 6,063 5,813 109.0 20,377 7,411 111.0 26,440
SUBTOTAL 1,740 118.0 6,158 7,787 88.8 22,220 9,527 92.6 28,378
TOTAL SILVER 59,226 5.1 9,703 255,821 4.3 35,058 315,047 4.4 44,761
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT COPPER
PROVEN AND PROBABLE MINERAL RESERVES (1), (3), (4), (5), (6), (8)
Kinross Gold Corporation's Share at December 31, 2013
Proven Probable Proven and Probable
Property Location Kinross
Interest Tonnes Grade Pounds Tonnes Grade Pounds Tonnes Grade Pounds
(%) (kt) (%) (Mlb) (kt) (%) (Mlb) (kt) (%) (Mlb)
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 57,425 0.19 240 241,975 0.23 1,204 299,400 0.22 1,444
SUBTOTAL 57,425 0.19 240 241,975 0.23 1,204 299,400 0.22 1,444
TOTAL COPPER 57,425 0.19 240 241,975 0.23 1,204 299,400 0.22 1,444
Measured and Indicated Mineral Resources (excludes Proven and Probable Reserves)
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT GOLD
MEASURED AND INDICATED MINERAL RESOURCES (EXCLUDES PROVEN AND PROBABLE MINERAL RESERVES) (2), (3), (4), (5), (6), (7), (8), (9), (10)
Kinross Gold Corporation's Share at December 31, 2013
Measured Indicated Measured and Indicated
Property Location Kinross
Interest Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(%) (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz)
NORTH AMERICA
Fort Knox Area USA 100.0 % 8,438 0.40 108 69,712 0.46 1,039 78,150 0.46 1,147
Kettle River USA 100.0 % - - - 109 7.30 26 109 7.42 26
Round Mountain Area USA 50.0 % 12,019 0.94 364 26,096 0.64 539 38,115 0.74 903
White Gold Area Yukon 100.0 % - - - 9,788 2.67 840 9,788 2.67 840
SUBTOTAL 20,457 0.72 472 105,705 0.72 2,444 126,162 0.72 2,916
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 5,997 0.29 56 70,195 0.35 788 76,192 0.34 844
Fruta del Norte Ecuador 100.0 % - - - - - - - - -
La Coipa (9) Chile 100.0 % 10,646 1.58 541 2,843 1.10 100 13,489 1.48 641
Lobo Marte (10) Chile 100.0 % - - - 34,052 0.83 908 34,052 0.83 908
Maricunga Area Chile 100.0 % 23,342 0.68 508 103,618 0.66 2,193 126,960 0.66 2,701
Paracatu Brazil 100.0 % 215,040 0.31 2,111 325,135 0.39 4,069 540,175 0.36 6,180
SUBTOTAL 255,025 0.39 3,216 535,843 0.47 8,058 790,868 0.44 11,274
AFRICA
Chirano Ghana 90.0 % 2,488 2.11 169 5,502 2.56 453 7,990 2.42 622
Tasiast Mauritania 100.0 % 67,351 0.58 1,248 193,078 1.06 6,559 260,429 0.93 7,807
SUBTOTAL 69,839 0.63 1,417 198,580 1.10 7,012 268,419 0.98 8,429
RUSSIA
Dvoinoye Russia 100.0 % - - - 150 6.98 34 150 6.98 34
SUBTOTAL - - - 150 6.98 34 150 6.98 34
TOTAL GOLD 345,321 0.46 5,105 840,278 0.65 17,548 1,185,599 0.59 22,653
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT SILVER
MEASURED AND INDICATED MINERAL RESOURCES (EXCLUDES PROVEN AND PROBABLE MINERAL RESERVES) (2), (3), (4), (5), (6), (7), (8), (9)
Kinross Gold Corporation's Share at December 31, 2013
Measured Indicated Measured and Indicated
Property Location Kinross
Interest Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(%) (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz)
NORTH AMERICA
Gold Hill USA 50.0 % 24 8.1 6 2,894 6.7 623 2,918 6.7 629
Round Mountain USA 50.0 % - - - - - - - - -
Round Mountain Area USA 50.0 % 24 8.1 6 2,894 6.7 623 2,918 6.7 629
SUBTOTAL 24 8.1 6 2,894 6.7 623 2,918 6.7 629
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 5,997 1.2 238 70,195 1.1 2,414 76,192 1.1 2,652
Fruta del Norte Ecuador 100.0 % - - - - - - - - -
La Coipa (9) Chile 100.0 % 10,646 48.7 16,676 2,843 30.5 2,787 13,489 44.9 19,463
SUBTOTAL 16,643 31.6 16,914 73,038 2.2 5,201 89,681 7.7 22,115
RUSSIA
Dvoinoye Russia 100.0 % - - - 150 12.4 60 150 12.4 60
SUBTOTAL - - - 150 12.4 60 150 12.4 60
TOTAL SILVER 16,667 31.6 16,920 76,082 2.4 5,884 92,749 7.6 22,804
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT COPPER
MEASURED AND INDICATED MINERAL RESOURCES (EXCLUDES PROVEN AND PROBABLE MINERAL RESERVES) (2), (3), (4), (5), (6), (7), (8)
Kinross Gold Corporation's Share at December 31, 2013
Measured Indicated Measured and Indicated
Property Location Kinross
Interest Tonnes Grade Pounds Tonnes Grade Pounds Tonnes Grade Pounds
(%) (kt) (%) (Mlb) (kt) (%) (Mlb) (kt) (%) (Mlb)
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 5,997 0.12 16 70,195 0.16 247 76,192 0.16 263
SUBTOTAL 5,997 0.12 16 70,195 0.16 247 76,192 0.16 263
TOTAL COPPER 5,997 0.12 16 70,195 0.16 247 76,192 0.16 263
Inferred Mineral Resources
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT GOLD
INFERRED MINERAL RESOURCES (2), (3), (4), (5), (6), (7), (8), (9), (10)
Kinross Gold Corporation's Share at December 31, 2013
Property Location Inferred
Kinross
Interest Tonnes Grade Ounces
(%) (kt) (g/t) (koz)
NORTH AMERICA
Gil USA 100.0 % 1,348 0.75 33
Fort Knox Pit USA 100.0 % 9,219 0.48 143
Fort Knox Area USA 100.0 % 10,567 0.52 176
Kettle River USA 100.0 % 15 8.15 4
Gold Hill USA 50.0 % 126 0.33 1
Round Mountain USA 50.0 % 24,390 0.55 432
Round Mountain Area USA 50.0 % 24,516 0.55 433
Golden Saddle Yukon 100.0 % 2,166 1.79 125
Arc Yukon 100.0 % - - -
White Gold Area Yukon 100.0 % 2,166 1.79 125
SUBTOTAL 37,264 0.62 738
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 125,859 0.37 1,498
Fruta del Norte Ecuador 100.0 % - - -
La Coipa (9) Chile 100.0 % 2,676 3.31 285
Lobo Marte (10) Chile 100.0 % 112,767 0.78 2,834
Pancho Chile 100.0 % 6,137 0.56 111
Verde Chile 100.0 % 7,835 0.57 144
Maricunga Area Chile 100.0 % 13,972 0.57 255
Paracatu Brazil 100.0 % 3,239 0.27 28
SUBTOTAL 258,513 0.59 4,900
AFRICA
Chirano Ghana 90.0 % 1,611 3.06 158
Tasiast Mauritania 100.0 % 14,146 1.46 664
SUBTOTAL 15,757 1.62 822
RUSSIA
Dvoinoye Russia 100.0 % 130 9.21 38
Kupol Russia 100.0 % 400 13.90 179
SUBTOTAL 530 12.73 217
TOTAL GOLD 312,064 0.67 6,677
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT SILVER
INFERRED MINERAL RESOURCES (2), (3), (4), (5), (6), (7), (8), (9)
Kinross Gold Corporation's Share at December 31, 2013
Property Location Inferred
Kinross
Interest Tonnes Grade Ounces
(%) (kt) (g/t) (koz)
NORTH AMERICA
Gold Hill USA 50.0 % 126 3.0 12
Round Mountain USA 50.0 % - - -
Round Mountain Area USA 50.0 % 126 3.0 12
SUBTOTAL 126 3.0 12
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 125,859 1.0 4,189
Fruta del Norte Ecuador 100.0 % - - -
La Coipa (9) Chile 100.0 % 2,676 51.1 4,395
SUBTOTAL 128,535 2.1 8,584
RUSSIA
Dvoinoye Russia 100.0 % 130 25.1 105
Kupol Russia 100.0 % 400 214.0 2,752
SUBTOTAL 530 167.8 2,857
TOTAL SILVER 129,191 2.8 11,453
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT COPPER
INFERRED MINERAL RESOURCES (2), (3), (4), (5), (6), (7), (8)
Kinross Gold Corporation's Share at December 31, 2013
Property Location Inferred
Kinross
Interest Tonnes Grade Pounds
(%) (kt) (%) (Mlb)
SOUTH AMERICA
Cerro Casale (8) Chile 25.0 % 125,859 0.19 526
SUBTOTAL 125,859 0.19 526
TOTAL COPPER 125,859 0.19 526
Mineral Reserve and Mineral Resource Statement Notes
(1) Unless otherwise noted, the Company's mineral reserves are estimated using appropriate cut-off grades based on an assumed gold price of $US 1,200 per ounce, a silver price of $US 22.00 per ounce and a copper price of $US $3.00 per pound. Mineral reserves are estimated using appropriate process recoveries, operating costs and mine plans that are unique to each property and include estimated allowances for dilution and mining recovery. Mineral reserves are reported in contained units and are estimated based on the following foreign exchange rates:
Russian Ruble to $US 33
Chilean Peso to $US 505
Brazilian Real to $US 2.27
Ghanaian Cedi to $US 2.00
Mauritanian Ouguiya to $US 290
(2) Unless otherwise noted, the Company's mineral resources are estimated using appropriate cut-off grades based on a gold price of $US 1,400 per ounce, a silver price of $US 26.00 per ounce, a copper price of $US $3.25 per pound and the following foreign exchange rates:
Russian Ruble to $US 32
Chilean Peso to $US 500
Brazilian Real to $US 2.00
Ghanaian Cedi to $US 2.00
Mauritanian Ouguiya to $US 300
(3) The Company's mineral reserves and mineral resources as at December 31, 2013 are classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum's "CIM Definition Standards - For Mineral Resources and Mineral Reserves" in accordance with the requirements of Canadian National Instrument 43-101 "Standards of Disclosure for Mineral Projects" ("NI 43-101"). Mineral reserve and mineral resource estimates reflect the Company's reasonable expectation that all necessary permits and approvals will be obtained and maintained.
(4) Cautionary note to U.S. Investors concerning estimates of mineral reserves and mineral resources. These estimates have been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of United States' securities laws. The terms "mineral reserve", "proven mineral reserve" and "probable mineral reserve" are Canadian mining terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum's (the "CIM") - CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended. These definitions differ from the definitions in the United States Securities and Exchange Commission ("SEC") Guide 7 ("SEC Guide 7") under the United States Securities Act of 1933, as amended. Under SEC Guide 7, a "final" or "bankable" feasibility study is required to report mineral reserves, the three-year historical average price is used in any mineral reserve or cash flow analysis to designate mineral reserves and the primary environmental analysis or report must be filed with the appropriate governmental authority. In addition, the terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in NI 43-101 and recognized by Canadian securities laws but are not defined terms under SEC Guide 7 or recognized under U.S. securities laws. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be upgraded to mineral reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred mineral resource" will ever by upgraded to a higher category. Under Canadian securities laws, estimates of "inferred mineral resources" may not form the basis of feasibility or pre-feasibility studies, except in rare cases. U.S. investors are cautioned not to assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Accordingly, these mineral reserve and mineral resource estimates and related information may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal laws and the rules and regulations thereunder, including SEC Guide 7.
(5) Except as provided in Note (8), the Company's mineral resource and mineral reserve estimates were prepared under the supervision of Mr. John Sims, an officer of Kinross, who is a qualified person as defined by NI 43-101.
(6) The Company's normal data verification procedures have been used in collecting, compiling, interpreting and processing the data used to estimate mineral reserves and mineral resources. Independent data verification has not been performed.
(7) Mineral resources that are not mineral reserves do not have to demonstrate economic viability. Mineral resources are subject to infill drilling, permitting, mine planning, mining dilution and recovery losses, among other things, to be converted into mineral reserves. Due to the uncertainty associated with inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to indicated or measured mineral resources, including as a result of continued exploration.
(8) Estimates for the Cerro Casale project are based on a project update completed in the first half of 2011 and have been updated to reflect current assumptions below. Mineral reserves and mineral resources are estimated using appropriate cut-off grades based on the following commodity prices and foreign exchange rates:
Mineral reserves - Gold price of $US 1,100 per ounce, Silver price of $US 21.00 per ounce, Copper price of $US 3.00 per pound, Chilean Peso to $US 505
Mineral resources - Gold price of $US 1,500 per ounce, Silver price of $US 24.00 per ounce, Copper price of $US 3.50 per pound, Chilean Peso to $US 500
(9) Includes mineral reserves and mineral resources from the Puren deposit in which the Company holds a 65% interest.
(10) The mineral resources and mineral reserves for Lobo-Marte are based on the pre-feasibility study completed by the Company in 2010.
(11) The mineral reserve estimates presented herein comply with the reserve categories of SEC Guide 7 published by the SEC except for mineral reserve estimates at Lobo-Marte, which are based on the pre-feasibility study completed in 2010. For mineral reserve estimates under NI 43-101, a pre-feasibility study is sufficient, however for reserves under SEC Guide 7, a feasibility study is required.
Mineral Reserve and Mineral Resource Definitions
A Mineral Reserve is the economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Mineral Reserve includes diluting materials and allowances for losses that may occur when the material is mined.
A 'Probable Mineral Reserve' is the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.
A 'Proven Mineral Reserve' is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.
A Mineral Resource is a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial minerals in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge.
An 'Inferred Mineral Resource' is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.
An 'Indicated Mineral Resource' is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.
A 'Measured Mineral Resource' is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.
For more information, please see Kinross' 2013 year-end Financial Statements and MD&A at www.kinross.com.
(1) Unless otherwise stated, production figures in this news release are based on Kinross' 90% share of Chirano production. Prior year production figures have been adjusted to exclude Crixás due to its sale in Q2 2012.
(2) These figures are non-GAAP financial measures and are defined and reconciled on pages 13 to 16 of this news release.
(3) Net earnings (loss) figures in this release represent "net earnings (loss) from continuing operations attributable to common shareholders".
(4) Attributable margin per ounce sold is a non-GAAP measure defined as "average realized gold price per ounce" less "attributable production cost of sales per gold equivalent ounce sold."
(5) The percentages are calculated based on the mid-point of regional 2014 forecast production.
(6) Refers to all of the currencies in the countries where the Company has mining operations, fluctuating simultaneously by 10% in the same direction, either appreciating, or depreciating, taking into consideration the impact of hedging and the weighting of each currency within our consolidated cost structure.
CONTACT INFORMATION
Kinross Gold Corporation
Steve Mitchell, Vice-President, Corporate Communications
416-365-2726
steve.mitchell@kinross.com
Tom Elliott, Vice-President, Investor Relations
416-365-3390
tom.elliott@kinross.com
www.kinross.com