• Sonntag, 29 Dezember 2024
  • 06:24 Uhr Frankfurt
  • 05:24 Uhr London
  • 00:24 Uhr New York
  • 00:24 Uhr Toronto
  • 21:24 Uhr Vancouver
  • 16:24 Uhr Sydney

Forum Expands Presence in Key Lake Area of Athabasca Basin With Acquisition of 100% Interest in Highrock South Property

17.07.2013  |  Marketwire

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jul 17, 2013) - Forum Uranium Corp. ("Forum") (TSX VENTURE:FDC) announces that it has acquired a 100% interest in the 1,381 hectare Highrock South property located 15 km south of the Cameco/AREVA Key Lake Uranium Processing facility on the eastern side of Saskatchewan's Athabasca Basin. The property is a continuation of the prospective Key Lake / Black Forest conductive trend that hosts Cameco's Key Lake uranium deposits (historic Key Lake open pit uranium mine produced 209 million lbs U3O8 http://www.cameco.com/mining/key_lake/ and the GAX, PV and P Patch basement hosted uranium deposits). In addition, the geological setting at Highrock South compares favourably to the recent Patterson Lake South discovery on the south edge of the Athabasca Basin.

This acquisition is strategic to Forum's other properties in the Key Lake Area, and significantly expands Forum's Highrock claims (see Figure 1). Highrock and Highrock South were the subject of limited historical exploration, conducted in the late 1970's, which included overburden drilling. Anomalous uranium values were encountered in several overburden drill holes, which will require follow-up work.

Forum will acquire a 100% right, title and interest in and to the Highrock South property by paying $2,500 in cash and issuing 25,000 Forum common shares at a deemed value of $0.30 per share, in addition to granting a 2% NSR to the Vendor. The transaction is subject to approval by the TSX Venture Exchange.

About Forum Uranium

Forum Uranium Corp. is a Canadian-based energy company with a focus on the acquisition, exploration and development of Canadian uranium projects. Forum has assembled a highly experienced team of exploration professionals with a track record of mine discoveries for unconformity-style uranium deposits in Canada. The Company has a strategy to discover near surface uranium deposits in the Athabasca Basin, Saskatchewan and the Thelon Basin, Nunavut by exploring on its 100% owned properties and through strategic partnerships and joint ventures.

To view "Figure 1 Location of Forum Claims South of the Key Lake deposits", please visit the following link: http://media3.marketwire.com/docs/716fdc_map.jpg.

ON BEHALF OF THE BOARD OF DIRECTORS

Richard J. Mazur, P.Geo., President & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contact

Forum Uranium Corp.
Rick Mazur
President & CEO
604-638-3947
Forum Uranium Corp.
Matt Terriss
Director, Corporate Affairs
604-630-1585
info@forumuranium.com
www.forumuranium.com
CHF Investor Relations
Robin Cook
Senior Account Manager
416-868-1079 x 228
robin@chfir.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Forum Energy Metals Corp.
Bergbau
A2JE3F
CA34985Q1000
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.