Highlights: Drill Hole NAK22-02 intersected 956 m of 0.37% copper equivalent, including 301m of 0.61% CuEq from surface, and ending within 150 m of 0.60 % CuEq, from 834 m to 984 m. NAK22-02 is a follow-up from NAK22-01's 851 m of 0.37% copper equivalent All 7 holes drilled have displayed widespread mineralization throughout, with 6 holes terminating in mineralization and one hole in progress. Assays for holes NAK22-03 to
[...]